BAR CHART Develop by Henry Gantt. Definitions Activity

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Work Breakdown Structures
Project Management Information Systems and Management.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Chapter 10: Project Schedule Planning
Planning & Scheduling Systems: From Design to Fabrication.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
L ECTURE 5 – G ANTT C HART GANTT Charts Constructing GANTT Charts Staffing and Re-scheduling Project Management Software Software Project Management Maria.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
CS 501: Software Engineering Fall 2000 Lecture 4 Management I: Project Management.
Review Questions Speculate as to the advantages and disadvantages of appointing project mangers from the ranks of senior systems analyst. The advantage.
CEM 510 Construction Planning & Scheduling Dr Almohawis
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
BAR CHART Paweł Bilski Piotr Mazur Paulina Wawryca.
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
BAR CHART Develop by Henry Gantt. Definitions Activity
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
BUSINESS PLUG-IN B15 Project Management.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Planning Tools and Techniques Module
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Scheduling CTC-415. Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Latifa AlAbdulkarim King Saud University October,2009.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Project Management.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. Characteristics.
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
WEEK 3 Project Planning.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Fundamentals of Project Management and Schedule Development.
Project and Project Formulation and Management
WHAT IS A GANTT CHART.
Gantt Chart Presentation Name Course Name
PERT & GANTT CHARTS An Introduction.
Fall 06 ECE 361 Project Schedule
Gantt Charts.
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Gantt Chart.
ETI 4448 Applied Project Management
CEM 510 Construction Planning & Scheduling Dr Almohawis
Project Planning By Phaik San Liew.
Resource Planning, Cost Estimation and Budgeting
Project Timeline using Microsoft Project
Fault Tree Analysis Summary Process Steps
Presentation transcript:

BAR CHART Develop by Henry Gantt. Definitions Activity A graphical description of the project consisting of well-defined collection of tasks. Activity An activity is a task or closely related group of tasks whose performance contributes to the completion of the overall project. “Excavate Foundation”.

BAR CHARTS ORGANIZATION Item Activity M10 Mobilization Bars (Month or Year)

CONSTRUCTION THE BAR CHART When constructing a bar chart, the following questions must be answered: 1.How should the bar chart schedule be laid out? 2.What time units should be used? 3.Should work days or calendar days be used? 4.What about non continuous work? Additional information may be added to the basic bar chart such as activity value, cost and resource requirements. Fenced bar charts graphically show the relationships between activities.

BAR CHART ADVANTAGES AND DISADVANTAGES Easy to prepare Easily understood by all parties Involved in the construction process Good communication tool Disadvantages Do not show interrelationships between activities Managing projects becomes difficult without those relationships between activities It is difficult to judge the impact of an unexpected event on the rest of the construction process

TYPE OF BAR CHART Type I Linear time-scaled for planning, Linear progress-scaled for reporting Assume the progress of the activity as a direct-linear function of the elapsed time. For this example Five months were originally scheduled for this activity. Reporting date at 3rd month, 60% of the elapsed time. Activity behind by 10% “May or may not be true”.

TYPE OF BAR CHART (cont.) Type II Time scaled for planning - Time scaled for reporting. Planned cumulative progress % are written at the end of each time interval. No linearity the reporting bar gives no implication about the actual progress.