TECH 50800 Project Title: Customer Service management in automotive Industries Champion/Define Phase Date: 10/1/2014 Team member: Ponnappa Bheemaiah.

Slides:



Advertisements
Similar presentations
Traditional SIPOC Approach
Advertisements

Project Management Concepts
A method for addressing any large problem. Carefully consider the problem. Define the problem. Ask yourself the following questions: What is it that I.
Six Sigma Green Belt Tools and Applications (3 Days Workshop) Prepared for: In-house Training
TECH Project Company X Documentation Plan Champion/Define Phase
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Tech 50800: Champion/Define Presentation Summary of project  Sycamore companies are collecting information on cars from three different locations to.
QC Throughput Rate Improvement TECH Project Champion/Define Phase.
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: October 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
Project Storyboard Template
Pg 1 Why Learn About SIPOC And Process Maps? Document actual high level process Clarify customers, suppliers, inputs, and outputs Communicate information.
1 Chapter 3 Project Organization, Selection, and Definition.
TECH Project Title: Customer service management in automotive industries Analyze Phase Date: 11/19/2014 Team member: Ponnappa Bheemaiah.
TECH Project Title : Customer service management in automotive industries Measure Phase Date:29/10/2014 Team member: Ponnappa Bheemaiah.
Voice of the Customer (Part of the Project Preparation Phase)
C LO GO. your family site your site here LOG O Six Sigma has become a popular quality performance tool in many organisations to drive out variability,
TECH Project Title:Customer Service management in automotive industries Improve Phase Date: Team member: Ponnappa Bheemaiah.
Milestone 1 Review Define Phase Complete Cost Data Integrity Project September 5, 2007.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
1 Industrial Design of Experiments STAT 321 Winona State University.
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved 1 Voice of the Customer Deployment & Maturity.
DMAIC Process Storyboard
Everyone Has A Role and Responsibility
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Managing Risk in the Supply Chain Kimball Bullington, Ph.D., P.E. Professor Middle Tennessee State University Kimball E. Bullington.
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
Improving Patient Bed Wait time in Healthcare DATE: 19 NOVEMBER 2014 TEAM MEMBERS: PRIYANKA PRIYANKA. AHMAD ALMATROOD. TECH Analyze Phase.
Starting Comparing different projects that need to be done in the company Make project selection: Coding Performance Improvement Project.
IS2210: Systems Analysis and Systems Design and Change Twitter:
Systems Analysis and Design in a Changing World, Thursday, Feb 1.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Going beyond ISO How to make ISO pay for itself and increase the bottom line.
Extended Award in Employability Skills Session Three Preparing for an interview.
Green Belt Deliverables for Week Two Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Project to Improve Help Desk Call Response Lean Six Sigma Green Belt Project.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Analyze Phase.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Measure Phase.
TECH Project Improve carry out process to increase sales in the full service restaurant Champion/Define Phase DATE:10/05/2015 TEAM MEMBERS: DILARA.
Certificate in Employability Skills Customer Advisor Day 4 Preparing for an interview.
OCT. 26, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING MEASURE PHASE.
Tech 50800: Champion/Define Phases DATE: PRESENTER: DARON SAUNDERS.
A Quick Review of the Components THE DMAIC CYCLE.
STREAMLINE PRODUCT ORDERING PROCESS TECH PROJECT CHAMPION/DEFINE PHASE.
1 Chapter 3 Project Organization, Selection, and Definition.
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving

The DMAIC Method
LEAN SIX SIGMA PROJECT TEMPLATE
Continuous Improvement Projects
Six Sigma Approach.
System Analysis and Design Task 1- Explanation
Project Organization, Selection, and Definition
DMAIC Project Template
Chapter 8 Quality Teamwork
The Define Phase Templates and Worksheets
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Teams What is a team? Maintaining Focus
Six Sigma DMAIC Process
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
Six Sigma Introduction 1 1.
Lean-Green belt six sigma program
Six Sigma DMAIC Process
Presentation transcript:

TECH Project Title: Customer Service management in automotive Industries Champion/Define Phase Date: 10/1/2014 Team member: Ponnappa Bheemaiah

Affinity Diagram It is a green Belt Project. 8 senior service advisors who have at least 5 years of experience were called for a meeting. They were given 10 min to write down all customer complaints for the new car which has not run more than 500 km on a post it notes. The complaints were then grouped on the basis if the problem can be solved within 2 days.

TECH508- Champion Step Project selection matrix: Based on the above matrix Car radio and Turbo oil leakage and horn was selected for six sigma project

Project Identification Based on the project selection matrix, the service advisors feel that it is difficult to solve the turbo oil leakage, car radio and the car horn issues within 2 days according to company norms. Hence, six sigma will be applied to these issue so that the problems are solved within 2 days.

Project Charter

Project team Project owner: General manager of the automotive service branch in Bangalore, India Front line staff: Service Advisors (8) Data Analyst Customer relationship Executive Total members in the team : 11

Ground rules Attendance : Attendance to all meeting is compulsory Participation: Be more interactive Interruption: No interruption during meeting unless emergency with permission of general manager Preparation: All participants must come prepared for the meeting Timeliness: All given tasks must be completed on time

Project charter review After every meeting the project has to be reviewed in order to check if we are on track. As project charter is a living document, document might need to be improvised.

SIPOC Stakeholders

Voice Of Customer Analysis Before taking up this project the complaint was a reactive customer voice. In this process we apply proactive customer voice analysis

VOC data collection In this project the data collection is been done by the customer relation executive. The interview questions are asked for SWOT analysis.

Interview form (SWOT ANALYSIS)

SWOT Analysis

CTQ tree

End