NORTHERN RAILWAY AN OVERVIEW 1
NORTHERN RAILWAY ROUTE MAP 2
SALIENT FEATURES DIVISIONS5 Delhi, Firozpur, Lucknow, Moradabad, Ambala STATES / UT8 / 1 Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Delhi, Uttar Pradesh, Rajasthan, Uttarakhand and Chandigarh ROUTE KM7125 BG 6864, NG 261 RUNNING KM9239 BG 8978, NG 261 ELEC RKM2126 NORTHERN RAILWAY – AN OVERVIEW 3
SALIENT FEATURES LOCOMOTIVES894 ELECTRICAL 345, DIESEL 549 COACHES5543 WAGONS15511 WORKSHOPS4 (JUDW, ASR, AMV & KLK) DISASTER MANAGEMENT16 ART, 15 ARMV, 8 CRANES (140 TONNES) STAFF STRENGTH SANCTIONEDON ROLL OFFICER STAFF (12572 recruited in ) NORTHERN RAILWAY – AN OVERVIEW 4
NORTHERN RAILWAY – PASSENGER SERVICES AT A GLANCE TRAINS1569 Mail/Exp 847, Passenger 722 Rajdhani11 daily 10 weekly Shatabdi13 Jan Shatabdi04 Duranto04 daily 09 weekly 3350 SPECIALS & 9299 COACHES AUGMENTED IN APR-Sept
NORTHERN RAILWAY – PASSENGER SERVICES MAIN TERMINALS S.N.TERMINAL TRAINS PER DAY TYPE OF TRAINS PASSENGERS HANDLED ( ) (IN LACS) PASSENGER EARNINGS ( ) (RS. IN CR.) MAIL/EXPPASS. 1NEW DELHI DELHI NIZAMUDDIN JAMMU TAWI LUCKNOW
EARNINGS OVER NORTHERN RAILWAY (in crores) YEAR (APRIL-SEPT) RECORD ORIGINATING TOTAL EARNINGS RECORD FREIGHT EARNINGS PASSENGEREARNINGS OTHER CHG SUNDRY Improvement22.30%34.16%11.18%16.54%38.77% 7
8 FREIGHT OPERATIONS YEAR (APRIL-SEPT) TOTAL FREIGHT LOADING MT MT Record incremental growth22.20% YEAR (APRIL-SEPT) TOTAL FOODGRAIN LOADING MT MT Improvement43.23% Freight loading of MT during April to September 2013, is a new record.
PUNCTUALITY OF MAIL/EXPRESS TRAINS YEAR (APRIL-SEPT) OVERALL M/EXP PUNCTUALITY % (Record) YEAR (APRIL-SEPT) PUNCTUALITY % OF MR TRAINS (Record) 9
PUNCTUALITY OF MAIL/EXPRESS TRAINS PUNCTUALITY ABOVE 90% ACHIEVED FOR THE MONTHS OF MAY, AUGUST AND SEPTEMBER A NEW RECORD OF 92.65% PUNCTUALITY OF MAIL/EXPRESS TRAINS WAS MADE IN THE MONTH OF SEPTEMBER INTENSIVE MONITORING, SIGNIFICANT REDUCTION IN ASSET FAILURES AND RATIONALIZATION OF TRAIN MOVEMENT THROUGH TIME TABLING CHANGES, BROUGHT ABOUT THIS PERCEPTIBLE IMPROVEMENT IN PUNCTUALITY OF M/EXP TRAINS. NR HAS THE HEAVIEST PASSENGER OPERATION OVER IR WITH 505 MAIL/EXPRESS TRAINS DAILY. PASSENGER AND SUBURBAN PUNCTUALITY ALSO IMPROVED OVER LAST YEAR. 10
NORTHERN RAILWAY – SAFETY CONSEQUENTIAL ACCIDENTS YEARCOLLISIONDERAILMENTLC FIRE IN TRAINS MISC.TOTAL TRAIN ACCIDENTS PER MILLION TRAIN KMS * * * ( Apr- Sept) (* includes 13 accidents at unmanned crossings each in & and 7 in due to negligence of road users.) 11
12 ASSET RELIABILITYITEM Cumulative up to Sept’2012 Cumulative up to Sept’2013 % Variation - Imp. / + Det. RAIL FAILURE DSL LOCO FAILURE ELEC LOCO FAILURE ROADSIDE WAGON DETACHMENTS COACH DETACHMENTS OHE FAILURES SIGNAL FAILURES
13 NEW LINES COMMISSIONED (IN AND ): Qazigund – Banihal18 Km ( Rs 1700 cr.) Abohar – Fazilka43 Km ( Rs 230 cr. ) Rewari – Rohtak75 Km ( Rs 603 cr. ) Chandigarh – Ludhiana68 Km ( Rs 680 cr. ) TOTAL 204 Km ( Rs 3,213 cr.) DOUBLING COMPLETED: 18 Km Doubling between Mansa - Maur Completed in (Commissioning will be done after non-interlocking in Yards)
NEW INITIATIVES LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN RAILWAY PORTION. COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13) SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13) MACP – 6092 (BETWEEN APR TO SEPT’13) LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR EFFECTIVE MONITORING OF COURT CASES. LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13) IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED DEVELOPMENT OF YARD CLEANING MACHINE 14
NEW INITIATIVES – Contd…. SELECTION CALENDER FINALISED COMPLETE SWITCH OVER TO E-AUCTION W.E.F IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS. CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE AREAS. SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION STARTED. 15