4 - 1 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added.

Slides:



Advertisements
Similar presentations
Activity-Based Costing
Advertisements

Systems Design: Activity-Based Costing
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Activity-Based Costing: A Tool to Aid Decision Making Chapter Eight.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 5 Activity-Based Costing and Management.
Cost Allocation Concepts Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 35.
Activity Based Costing: A Tool to Aid Decision Making
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Supplementary Slides - Activity Based Costing Systems Design:
Activity Based Costing
Activity Based Costing: A Tool to Aid Decision Making Chapter 8.
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
ACTIVITY BASED COSTING. Learning Objectives Discuss the importance of unit costs Describe the functional-based costing approach Explain why functional-based.
8 Activity-Based Costing Chapter Machining Assembly  a cost system refinement  more overhead cost pools.
5 - 1 Activity-Based Costing and Activity-Based Management Chapter 5.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 8.
Activity Based Costing
WHAT’S UP WITH C&C SPORTS?
Activity-Based Costing
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 8e © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Activity-Based Costing: A Tool to Aid Decision Making
Activity-Based Costing
Activity-based Cost Management
0 CHAPTER 6 Activity-Based Costing © 2009 Cengage Learning.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Managerial Accounting Weygandt, Kieso, & Kimmel
Prepared by Diane Tanner University of North Florida Chapter 5 1 Allocation of Indirect Costs: Simple Costing & ABC.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
Chapter 5 Activity-Based Management. 1. How can reasonably accurate product and service cost information be developed? 2. What are the differences among.
CHAPTER 4 ACTIVITY-BASED COSTING Study Objectives  Recognize the difference between traditional costing and activity based costing.  Identify the steps.
McGraw-Hill/Irwin 3-1 Product Costing and Cost Accumulation in a Batch Production Environment 3 Chapter Three.
Unit 5 ACTIVITY-BASED COSTING Study Objectives  Recognize the difference between traditional costing and activity based costing.  Identify the steps.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
© 2016 Pearson Education, Inc.
1 Activity-Based Costing and Activity-Based Management
Activity Based Costing: A Tool to Aid Decision Making
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 9e © 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated,
4-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
Value-Based Systems: ABM and Lean 22. Value-Based Systems and Management OBJECTIVE 1: Explain why managers use value-based systems and discuss their relationship.
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
John Wiley & Sons, Inc. © 2008 Prepared by Dan R. Ward Suzanne P. Ward University of Louisiana at Lafayette CHAPTER 17 ACTIVITY-BASED COSTING.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Activity Based Costing: A Tool to Aid Decision Making
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
CHAPTER © jsnyderdesign / iStockphoto 7 ACTIVITY-BASED COSTING & ACTIVITY-BASED MANAGEMENT.
Activity-Based Costing and Analysis
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Foundations and Evolutions
When cost systems were developed in the 1800s, the emphasis was on simplicity because: 1. Cost and activity data had to be collected by hand and all calculations.
Allocating Overhead Chapter 16 … “Job Order Costing”: allocated overhead using Pred. Overhead Rate with Direct Labor as an allocation.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Chapter 5.
4-1 Activity-Based Costing 4 Learning Objectives Discuss the difference between traditional costing and activity-based costing. Apply activity-based costing.
Activity-Based Costing and Management
Managerial Accounting, Fourth Edition
University of Louisiana at Lafayette
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Chapter 3 System Design: Activity-Based Costing PowerPoint Authors:
CHAPTER 17 Activity Based Costing (ABC). Assigning Overhead Costs There are three ways to __________ overhead costs to production  Plant-wide Overhead.
Chapter 4-1. Chapter 4-2 Managerial Accounting, Sixth Edition Activity-Based Costing 4.
Welcome Back Atef Abuelaish1. Welcome Back Time for Any Question Atef Abuelaish2.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Prepared by Diane Tanner University of North Florida ACG Allocating Indirect Costs: Simple Costing & ABC 2-2.
McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved CHAPTER 13 McGraw-Hill/Irwin © 2007 The McGraw-Hill Companies, Inc.,
18-1 Chapter 16 … “Job Order Costing”: allocated overhead using Pred. Overhead Rate with Direct Labor as an allocation (activity) base. Chapter 17 … “Process.
Accounting: What the Numbers Mean
Accounting: What the Numbers Mean
Activity-Based Costing Managerial Accounting, Fifth Edition
Activity-Based Costing
“Cost Driver” (the activity) Owning a car
Presentation transcript:

4 - 1 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show

4 - 2 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity-Based Costing

4 - 3 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Costing Products... éDirect materials and direct labor costs are easy to trace éOverhead cannot be traced easily and must be assigned with estimates

4 - 4 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Traditional Costing Methods... éSpreads overhead cost over entire customer base éEach order “appears” to cost the same éOrders with high profit margins subsidize orders with low profit margins

4 - 5 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Traditional Costing Methods... A single or plantwide rate called a predetermined overhead rate is used:  Job Order = Direct Labor Costs  Process Cost = Machine Hours

4 - 6 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Need for a New System éAmount of direct labor used in many industries has decreased éTotal overhead from depreciation on equipment, utilities, repairs, maintenance has increased

4 - 7 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity-Based Costing (ABC) An overhead cost allocation system that allocates overhead to multiple activity cost pools and assigns the activity cost pools to products or services by means of cost drivers that represent the activities used.

4 - 8 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity Any event, action, transaction, or work sequence that causes a cost to be incurred in producing a product or providing a service.

4 - 9 ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity Cost Pool The overhead cost allocated to a distinct type of activity or related activities.

Activities and Related Cost Drivers Illustration 4-2

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Reasoning for ABC

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Cost Driver Any factor or activity that has a direct cause-effect relationship with the resources consumed. In ABC cost drivers are used to assign activity cost pools to products or services.

Illustration 4-3

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity-Based Costing (ABC) Calculate unit cost Identify activities Identify cost driver Compute overhead rate Assign overhead costs

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Benefits of Activity-Based Costing More accurate product costing which necessitates: éMore cost pools used to assign overhead éEnhanced control over overhead éBetter management decisions

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Limitations of Activity-Based Costing éCan be expensive to use. éSome arbitrary allocations continue.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Switch to ABC when... éProducts differ greatly in volume and manufacturing complexity éProducts lines are énumerous édiverse érequire differing degrees of support services éOverhead costs constitute a significant portion of total costs éThe manufacturing process or number of products has changed significantly éProduction or marketing managers are ignoring data provided existing system

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Activity-Based Management An extension of ABC from a product costing system to a management function that focuses on reducing costs and improving processes and decision making.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Value-Added Activities An activity that increases the worth of a product or service such as... éengineering design émachine set-ups émachining éassembling épainting épackaging

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Nonvalue-Added Activity An activity that adds cost to, or increases the time spent on, a product/service without increasing its market value such as: éRepair of machines éStorage of inventory éMoving of materials éBuilding maintenance éInspections éInventory Control

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Just-In-Time Processing (JIT) A processing system dedicated to having the right amount of materials, products, or parts arrive as they are needed, thereby reducing the amount of inventory.

Just-In-Time Processing (JIT) Illustration 4-18

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Just-In-Time Processing (JIT) Requires –Dependable suppliers –A multiskilled work force –A total quality control system

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Just-In-Time Processing (JIT) Reduced inventory Enhanced product quality Reduced rework and storage costs Savings from improved flow of goods

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Unit-Level Activities Activities performed for each unit of production.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Batch-Level Activities Activities performed for each batch of products.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Product-Level Activities Activities performed for and identifiable with an entire product line.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show Facility-Level Activities Activities required to support or sustain an entire production process and not dependent on number of products, batches, or units produced.

ActivityActivity-Based / Traditional StepsSteps of ABC Cost Cost Pools CostCost Drivers LimitationsLimitations/ Benefits of ABC ValueValue-Added ABCABC-Service Ind. JustJust-In-Time HierarchyHierarchy Levels Next Slide Previous Slide End Show