NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.

Slides:



Advertisements
Similar presentations
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Advertisements

Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Natural Gas Emergency Plan
© 2005 Notification and Reporting on Food Incidents: Irish Approach Food & Drugs Authority Bangkok Thailand Dorothy Guina-Dornan.
Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UK Gas Statistics Iain MacLeay – Head Energy Balances, Prices and Publications Date 29 September 2011.
National Grid: Gas Transmission System Operator
Project Nexus Workgroup Unique Sites 4 th November 2014.
Texas Pipeline Association
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
Gas Emergency Cash Out – A Shipper Perspective Transmission Workstream 3/7/08 Steve Rose.
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
UK Gas Statistics Iain MacLeay DECC Energy Statistics May 2011.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NEC Network Emergency Exercise - Exercise Prelude.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft for discussion1 Daily Outlook Gas Day : Wednesday, 15/01/06 Todays Opening Linepack296mcm Predicted Closing Linepack (PCLP1)293mcm Change in Linepack-3mcm.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Gas Storage – the DTI perspective John Havard Energy Markets Unit, DTI Presentation to the Geological Society 19 th October 2004.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Exercise Neptune Findings Gas Customer Forum 29 th January 2007 Jacky Carroll Network Manager Emergency Planning Gas National Control Centre.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 7th Dec 2006 Chris Logue
Transmission Workgroup 7th July 2011
Review of UNC Section Q “Emergencies”
Review Group 0175: DM Supply Point Emergency Arrangements
UNC Transmission Workstream 15th June 2005
DN Interruption Reform
Proposed Changes to UNC Section Q Emergencies - Mod 035
Presentation transcript:

NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning

NEC & EMERGENCY ARRANGEMENTS Preview  Emergency Procedures  NEC Safety Case  Changes to the NEC Safety Case  Post Network sales  Removal of Top-up  Summary

Emergency Procedures Gas Safety (Management) Regulations 1996 NEC Safety Case GT Safety Case Transco/E/1 NGSE Procedure Produced by NTS Co XXX/E/3 Transco/E/2 LGSE Procedure Produced by DNs collectively Gas Act 1995 Unified Network Code

Gas Safety (Management) Regulations  Places an obligation on all transporters to describe their arrangements for safe management of network  continuity of supply  dealing with emergencies  Arrangements enforceable in criminal law.  Requirement for Network Emergency Coordinator  Identifies the Network  Safety Cases (NEC and GT)  Duty to Cooperate - Regulation 6(2)

NEC Safety Case  Identifies the NEC’s responsibilities  Defines the Network  Primary  Secondary  Supplementary  Identifies types of gas supply emergencies on the primary system (NTS)  Insufficient supplies to the primary system  Transportation constraint  Identifies arrangements for managing gas supply emergencies  Describes the competency requirements of the NEC  Identifies who the NEC is  Approved by the HSE in March 2005

Role of the NEC Primary Responsibility  Coordinate of actions of Gas Transporters during a NGSE.  Return the primary system to a supply demand balance  Authorise each stage of a NGSE  Submit and maintain a safety case Secondary Responsibility  Authorise the admittance of Emergency Specification Gas  Test procedures as and when required  Produce reports on any NGSE  Authorise load reduction measures

NEC Safety Case Amendments  How the NEC is appointed  Use of public appeal at Stage 1 and 2  Reformatted to reflect GS(M)R  Reflects changes to the industry structure  Removal of Top Up and introduction of GS(M)R Safety Monitor Breach NGSE

Communication Route updated to reflect Network Sales

GS(M)R Safety Monitors Customer CategoryPreviousNew NTS Interruptible LDZ Interruptible NTS Firm LDZ Firm - Daily Metered I&C LDZ Firm - NDM Firm "Priority" Customers Irish Interconnector Domestic Protected Excluded Protected by Isolation

GS(M)R Monitors Top Up was replaced by GS(M)R monitors last winter Sites not protected by GS(M)R monitors protected by Isolation Loads which do not require protection by GS(M)R monitor must have Ability to remotely demonstrate zero flow (telemetry or datalogger) Ability to be physically isolated –via remotely operable valve –be sufficiently small in number to allow field engineers to visit site and close isolation valves (in the event of failure to cease gas flow)

GS(M)R Monitors  GS(M)R monitors are set for each storage category –Long Range Storage (Rough) –Medium Range Storage (Salt Cavity) –Short Range Storage (LNG)  Lower level of demand to support hence lower monitor levels  Levels to decay through winter  In the coming winter if delivery of beach gas is reduced monitor levels will be higher

GSMR Safety Monitor Breach

STAGE 3 Firm Load Shedding VLDMCs inc Interconnectors Sites > 25,000 tpa Public appeal message 1 and 2 STAGE 4 Isolation Allocation Isolation STAGE 5 Restoration Restoration of supply Revoking of previous stages STAGE 1 Potential Emergency Specification Gas NTS Linepack & Network Storage Storage Curtailment Emergency Interruption STAGE 2 Declaration Maximise Beach Gas (GD) Maximise Storage (GD & CTC) Suspension of OCM (GD only) Stages of a Network Gas Supply Emergency

Summary  NEC required under GS(M)R and is independent  Revised NEC Safety Case approved by HSE  Reflects changes to the industry post Network sales  Introduction of the GSMR Safety Monitor Breach emergency  Protected by Monitor Consumers  Protected by Isolation Consumers  Presentation to GEIEC in August  Any Questions?

NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning