BIQ Building Intelligence Quotient Jiri Skopek ECD Energy & Environment REALCOMM - June, 2005.

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
Test Automation Success: Choosing the Right People & Process
VSE Corporation Proprietary Information
We help the best buildings in the world get that way. Complete Building Solutions.
A Proven Partnership When you look at business partners, you want someone who understands your unique challenges. Mostly, you want someone who can address.
Continuous Value Enhancement Process
Selecting and implementing hospitality information systems
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Technical Review Group (TRG)Agenda 27/04/06 TRG Remit Membership Operation ICT Strategy ICT Roadmap.
1. Failure is when users do not feel they get what they paid for. 2. Failure is when the overall organization fails to adopt the solution.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
The Analyst as a Project Manager
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Integrated and Intelligent Building Certification for Designers and Installers: The Industry’s Path Forward for Credibility.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
VENTURE CAPITAL FORUM Funding the CABA Web site to Rank Intelligent Buildings Building Intelligence Quotient David Katz, Project Manager June 26, 2005.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
1 Toronto, Ontario - October 31 and November 1, 2002 October 31, 2002 David Dern Technology Roadmap for Intelligent Buildings Marketing Director Continental.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Technology Roadmap for Intelligent Buildings Presented to IMEI January 28, 2003 Mexico City David Dern Marketing Director.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
The Challenge of IT-Business Alignment
[Insert Presentation Date] A Building Intelligence Presentation [Customer Name or Logo]
Environmental auditing
W. A D V I K. RU Introduction materials. W. A D V I K. RU Lines of activity General contracting; Telecommunication; Engineering; Security; Construction.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Unit 5 Lesson 3-5 Combined Transportation, Manufacturing, Construction.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Intelligent Cities Conference January 19-21, 2009 Umm Al Qura University Al Abdiyah, Markbah Saudi Arabia Ron Zimmer, President & CEO Continental Automated.
Sustaining Sustainability: What Happens After Building Handover Presented by: Caecilia Gotama P.E., A.P., Principal Gotama Building Engineers.
Industry Integration Trends for the Future October 15, 2008 CEE Industry Partners Meeting Ron Zimmer, President & CEO Continental Automated Buildings Association.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
June 19, 2003 Kirk McElwain Technical Director CDBI Design-Build Conference.
Your Speakers Glenn MacDonell Director, Environment Directorate, Energy and Environmental Industries Branch (EEIB), Industry Sector Industry Canada David.
Reed Construction Data RS Means LCC Calculator. Overview Create Web interface to LCC Calculator for savings from Intelligent Building Systems Integration.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Life cycle services for automation products
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Kirk McElwain Technical Director
North America - Slow and Cautious With NextGen Projects Ronald Zimmer CABA President & CEO June 27, 2005.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
Training for Rebuilding Europe Retrofitting buildings, training and improved skills, and financing energy efficiency in buildings. 10 December 2010 – 10.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
ITExpo January 24, 2006 Networks C OGNITRONICS Network Media Servers Conferencing and Collaboration Mike Keefe CTO Presented by.
Chapter 8 - Integrative Process
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
International Safety Rating System
UNDERSTANDING ISO 9001:2008.
Strategic Information Systems Planning
Systems Analysis and Design in a Changing World, 4th Edition
Enercare Zero Net Energy Building Controls
IT Converge Developing a connected Workplace Presented by
Software Requirements
Quality Management Systems – Requirements
Sustainable buildings
CEng progression through the IOM3
Presentation transcript:

BIQ Building Intelligence Quotient Jiri Skopek ECD Energy & Environment REALCOMM - June, 2005

Objectives Present the concept of an Intelligent Building Rating tool –Objectives –How it works –Approach – including certification Review Green Globes attributes that could be applied to the BIQ tool Next steps Note –the purpose is NOT to discuss technicalities. (This requires a dedicated forum)

Building Intelligence, Reality and Perception REALITY cost savings functional enhancements (comfort, security, flexibility, reliability) Increased productivity PERCEPTION expensive complex – hard to implement a luxury not “mainstream” POSITIVE RETURN ON INVESTMENT LACK OF AWARENESS FEAR OF THE UNKNOWN

Objectives of the BIQ Tool Promote building intelligence integration and products by: demonstrating the added value they can bring to a property demystifying implementation of building intelligence EMPHASIZE: POSITIVE RETURN ON INVESTMENT INCREASE AWARENESS DISPEL FEAR OF THE UNKNOWN

Rating and Certification (demonstrates the added value) Design and Implementation Guidance (demystifies implementation) + BIQ - an online tool

BIQ concept is based on: Technology Roadmap for Intelligent Buildings CABA’s Best Practices Guide for Evaluating Intelligent Building Technologies IS Green Globes Rating Assessment Protocol that is used for: –Integrated design of new buildings –Improving existing buildings (BOMA Go Green) –Facility fit-up (Commercial Interiors) –Emergency management of buildings

Web Site: Green Globes is an on-line auditing tool for property owners and managers that evaluates the environmental performance of buildings against established best practice standards. Green Globes for Existing Buildings (Canada, UK): MURBs & Light Industrial Occupancies audit compatible with ISO provides energy and environmental performance evaluation and rating. Green Globes Energy & Environmental Performance Assessment and Benchmarking ECD Energy & Environment Canada Ltd. Go Green Comprehensive: Is a comprehensive benchmarking audit (based on thewww.bomagogreen.com Green Globes online performance assessment) measuring energy, indoor health, and environmental performance against the best industry operation and management practices

Web Site: Green Globes Design is an on-line assessment tool for developers and design teams that evaluates the environmental performance of the building design against established best practice standards. Green Globes for Design (USA) Green Building Initiative- Provides guidance throughout the design process – from Project Initiation to Construction and Commissioning – to implement the Integrated Design Process. Green Globes Energy & Environmental Performance Assessment and Benchmarking ECD Energy & Environment Canada Ltd. Green Globes for Design (Canada): Provides guidance throughout the design process – from Project Initiation to Construction and Commissioning – to implement the Integrated Design Process.

Web Site: Green Globes is an on-line auditing tool that evaluates the environmental performance of buildings against established best practice standards. BEMA (Building Emergency Management Assessment): Helps to evaluate the emergency management of building assets with respect to disasters and incidents of all kinds. Green Globes for Fit-up (Commercial Interiors Canada): Helps to integrate green design principles in a fit-up that will be energy and resource efficient, and will provide a healthier and more productive environment Green Globes Energy & Environmental Performance Assessment and Benchmarking ECD Energy & Environment Canada Ltd.

Why online? Interactive Makes it possible to change inputs at the click of a mouse Generates scores and reports effortlessly Makes it easy to store and compare data about various properties Allows for multiple users Puts product information at your fingertips

How can BIQ promote building intelligence ? 1.Provides a baseline assessment of an existing building 2.Helps to articulate the targets for a high performance building 3.Provides a gap analysis between the baseline building and the high performance version 4.Provides step-by-step guidance on how to get there Base building profile High performance intelligent building targets Gap analysis Building intelligence design guidance

BIQ Step 1 Needs Assessment Intelligent Building Components $/ BenefitMission Critical Building Communication Systems $*1-5* Building Automation & Security Systems $*1-5* Building & Facility Management Applications $*1-5* Building Structure & Systems $*1-5* * Assigns weights to the rating scale

HVAC Evaluate the benefits of the following HVAV features where 0 = no benefit 2 = operational benefit 4 = cost and operational benefit 1 = possible benefit3 = cost benefit 5= “must have” Ability to permit individual occupants to adjust workspace temperatures Ability to monitor temperatures and adjust them according to user profile Ability to adjust indoor air quality based on room occupancy and building standards Ability to adjust humidity, temperature and air flow speeds Ability to use variable air volume or constant volume air distribution designs Evaluation of sub-systems Building Intelligence Quotient Assessment Need Assessment

Building Intelligence Quotient Assessment Mission critical $/Benefits$/Benefits Temperature Controls Energy Management 24 hour surveillance Seismic Monitoring CO2 Monitoring

Three Areas of Assessment* 1 Project Management 2 Subsystem stand- alone custom features and performance 3 Subsystem operation in the building automation environment and BAS Equipment 20% 40% 20% 40% 1000 points available * Based on the Best Practices Guide

Texas Meeting Ranking Results Building Component or System NMinimumMaximumMeanStd. Deviation Communication Systems Digital and Analog Data Bandwidth available Degree of Structuring of all low voltage system cabling Wireless Network Accessibility Flexibility of Existing Wiring Plants to Accommodate Next Generation Technologies Informational Signage ( Elevators, Kiosks, other) Overall Power Distribution System Automation and Security Systems Percentage of Building Systems Integrated on a Facility IP network Percentage of Systems Using Open Standard Protocols Percentage of Building Systems Integrated on a control network (Open or Proprietary) Unified Web based User Interface Advanced Automation Strategies Using Integrated Systems

Project Stages Design Guidance Four stages of Building Intelligence Quotient approach Project Initiation (planning and definition Design Implementation Commissioning Intelligent Building Evaluation (final assessment)

Active Project: Middleton Hall Design StageStatusQuestionnairesReports Project InitiationCompletedUpdate dataView report Design ImplementationCompletedUpdate dataView report CommissioningNot completedUpdate data Intelligent building evaluation Not completedUpdate data Building Intelligence Quotient Assessment Other projects: Peterborough Centre 48 Main Street

Active Project: 48 Main Street Design StageStatusQuestionnairesReports Project InitiationCompletedUpdate dataView report Design ImplementationNot completedUpdate data CommissioningNot completedUpdate data Intelligent building evaluation Not completedUpdate data Building Intelligence Quotient Assessment Other projects: Middleton Hall Peterborough Centre, Peterborough

Pre-design (Planning and Definition) Goals Get consensus on client needs and explore the range of options Identify technical/regulatory investigations that should be done Conduct an investment analysis Identify tasks and resources

Pre-design (Planning and Definition) Project Management –Integrated design –Education –Selection of sub-systems –Value factors for building automation, annunciation, security and control systems –Value factors for communication systems –Business considerations Subsystem operation in default stand-alone mode –Custom features –Performance Subsystem Operation in a Building Automation Environment –Interaction among subsystems –BAS Equipment

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no Tip: This enables them to plan networked sub systems.

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no Tip: Providing information on networked subsystems helps building owners and managers understand options and market additional services to tenants for revenue beyond the lease.

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no Tip: This helps to ensure that building structural sensors will be properly installed during construction for a subsystem to monitor the building structure or systems.

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment yes no yes no yes no yes no yes no Tip: This will enable support for the adoption of networked systems. Unions are a powerful resource in meeting the objective increasing the individual capabilities of their members. Pre-design (Planning and Definition)

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no Tip: This serves to describe the impact of networked subsystems on insurable risks such as fire and life safety.

Education Have the designer and building managers requested that the manufacturers provide knowledge transfer to the following building automation practitioners? Architects, building engineers an consultants Building owners and managers Construction companies Unions Insurance industry Project Management Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no

Investment Analysis Has an investment analysis been prepared for the Owner/Investor that takes into consideration the following potential benefits? Building cost reduction due to less space required for raceways and spaces using shared network media or wireless network solutions Churn-cost reduction from plug-and-play technology and avoidance of technological obsolescence Improved organizational productivity Positive impact on liability insurance costs Higher market rents Fees for intelligent building services Business Considerations Building Intelligence Quotient Assessment Pre-design (Planning and Definition) yes no yes no yes no yes no yes no yes non/a

Report for Middleton Hall Building Intelligence Quotient Assessment Pre-design (Planning and Definition) A building intelligence quotient assessment was conducted for Middleton Hall, located at 1 Middleton Ave., Middleton AB. The building is owned by City of Middleton. Middleton Hall is a 500,000 sq. ft. commercial building that was built in It has 13 storeys. The facility is described thus: “commercial offices with commercial concourse”. The tenant is city employees. There are approximately 900 occupants. The building operates 14 hrs per day, 6 days per week. The building is managed by Joe Brown. The building intelligence quotient of Middleton Hall was assessed at the pre-design stage in terms of how well it addresses issues related to project management, selection of subsystems, subsystem operation features and performance in stand-alone mode; subsystem operation in a building automation environment, and BAS equipment considerations. The purpose of this assessment is to provide guidance with respect to client needs, the range of options; technical considerations and investigations, investment analysis and selection of consultants.

Report for Middleton Hall Building Intelligence Quotient Assessment Pre-design (Planning and Definition) Middleton Hall achieved an overall rating of 78% at the Pre-design Stage Integrated design Education Selection of sub-systems Value factors for communication systems Business considerations Subsystem stand-alone custom features Subsystem stand-alone performance Interaction among subsystems BAS Equipment

Report for Middleton Hall cont’d Building Intelligence Quotient Assessment Pre-design (Planning and Definition) Value Factors for Building Automation, Security and Control Systems Achievements The design team, in consultation with the client representatives has identified the following: The building systems that will be integrated on the facility IP network Open standard protocols that will be deployed Systems for providing information based-multi-media signage Areas of the building that will be serviced with door access control Special security features Integrated CCTV, Door access control and intrusion detection systems Real time interval metering requirements Recommendations The design team, in consultation with client representatives should identify the following: Proprietary user interfaces Web-based user interfaces

Report for Middleton Hall cont’d Building Intelligence Quotient Assessment Pre-design (Planning and Definition) Value Factors for Communication Systems Achievements The following issues have been investigated with respect to the installation of communication systems: The degree of structuring of all low voltage system cabling The extent of wireless networks Recommendations Consider the following needs and/or issues with respect to the installation of communication systems: Broadband data and video services needed Structuring of low voltage system cabling Product solutions Low voltage cabling Structured cabling system The flexibility of existing wiring plants to accommodate next generation technologies Cable management to be employed

Design Implementation Goals Organize and share information with the project team Establish financial and work-product controls Create designs and evaluate them against the project goals including the budget Create plans and specifications for tender to select contractor Proceed with construction while monitoring contractors and consultants to confirm completion of contract obligations.

Design Implementation Phase Project Management –Selecting a subsystem manufacturer –Education Subsystem operation in default stand-alone mode –Features –Performance –Operating Environment Factors –Failure and Emergency Operations Subsystem Operation in a Building Automation Environment –Interaction among subsystems –BAS Equipment and Features –Communications Room –Distributed Building Control and Closed Loop Controllers –Communications Protocol Issues –Application Layer Features

Commissioning Stage Goals Confirm performance Start up and test systems and adjust operations Provide an effective transition from construction to operation Provide a smooth transfer to owner/operator

Commissioning Project Management –Documentation –Training and Education Sub-system Operation in Default Stand-alone Mode –Performance BAS Management Issues System Management Issues

Final Assessment Goals Demonstrate value in terms of: Design based on the integrated design process Presence of intelligent building subsystems Integration of sub-systems Failure and emergency operations Support and maintenance including preventative maintenance and requests for service

Final Assessment Project Management –Documentation –Integrated design –Performance requirements –Commissioning –Operating and Maintenance Budget –Intelligent Building Subsystems Features Subsystem Operation in Default Stand-alone Mode –Support and Maintenance Subsystem Operation in a Building Automation Environment –BAS Equipment –Cabling –Communications Room –Communication Protocols

Conclusion BIQ: A means to raise awareness and dispel fear of the unknown; –An education tool –A way to engage the client A ranking system that demonstrates and markets building intelligence and system integration Based on an approach of: Integrated design Product solutions

Discussion Points There is an interest! “Fixed assessment” or “Needs-based” assessment? How to integrate “product solutions”? Technical Committee Review Certification?