The Quality Improvement Model

Slides:



Advertisements
Similar presentations
Management of Engineers and Technology Project Management Risk Management.
Advertisements

Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Overview Lesson 10,11 - Software Quality Assurance
Your Catapult Team Do the following:
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
9-1 Improve Process Capability The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
Six Sigma Quality Engineering
Six Sigma Continuous Improvement Training Six Sigma Continuous Improvement Training Document and Standardize Six Sigma Simplicity.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
The Quality Improvement Model
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Overview of Lean Six Sigma
Overview of DMAIC A Systematic Framework for Problem Solving
MOHAMAD SHARIF B ISHAK B
Monitoring the Project
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
© 2002 Systex Services Capability and Improvement - from Cpk to Six Sigma.
NCR Confidential NCR Supplier Quality Webcast June Bob Ciminera - Vice President Strategic Sourcing Robert Mele - Vice President, Quality and Continuous.
© Mahindra Satyam 2009 Project Metrics QMS Training.
Introduction to ISO New and modified requirements.
EAGLE INSIGHT “EXPERIENCE SPEAKS OF LESSONS LEARNED”
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Software Quality Assurance Activities
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Welcome to Lean Six Sigma Green Belt Training
5-1 Collect & Interpret Data Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Software Project Management Lecture # 10. Outline Quality Management (chapter 26)  What is quality?  Meaning of Quality in Various Context  Some quality.
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
Project Review Questions Ops Review Project Facilitation Process Excellence.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Project Storyboard (Page 1 of 2)
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
A QUALITY IMPROVEMENT TOOL
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Internal Auditing ISO 9001:2015
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
Control Plans Control Kaizen Facilitation.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
Control Phase Wrap Up and Action Items
Lean Six Sigma DMAIC Improvement Story
Documentation control
Chapter 7 Process Control.
Control Phase Wrap Up and Action Items
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma DMAIC Improvement Story
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Validation by Process Owner Validation by Project Leader
Lean-Green belt six sigma program
Practical Assessment Project Template – DMADV
Presentation transcript:

The Quality Improvement Model Define Process The Quality Improvement Model Select Measures Collect & Interpret Data Maintain Current Process Is Process Stable ? No Investigate & Fix Special Causes Purpose: Develop a control plan to maintain the improvements for the process Document control plan Yes Is Process Capable ? No Improve Process Capability Yes Develop Control Plan to Maintain Current Process

Objectives Explore the steps for setting up controls for your project Review Control Plan elements Review the need for well documented control plans to “sustain the gains” Introduce the concept of Mistake Proofing

Critical Input Variables The Funneling Effect Process Maps Identify Outputs Identify Inputs 3 to 6 Critical Input Variables C&E Matrix Failure Modes and Effects Analysis Control Charts (SPC) Exploratory Data Analysis (EDA) Design of Experiments (ASM / DOE) Now What ? A Control Plan to: “Sustain The Gains”

Three Ways to Control Key Variables in a Process Statistical Process Control Control to a Standard Engineering Process

Control Strategy Roadmap KPIV's 1) Monitor variables for out of control conditions KPOV's Major Focus on KPIV’S to Minimize Production of Defects 2) Develop alarm and recording strategy 3) Finalize process sampling plan 4) Document control plan for each key variable 5) Identify Opportunities for Mistake Proofing

Control Strategy Roadmap Step 1 - Monitor Variables For Out Of Control Conditions Key Relationships Identified After DOE Completion Strength = 6.6444 + 1.4466 Press Yield = - 1690 + 15.7 Temp + 41.7 Press - 0.0338 TempSqr - 0.281 PressSqr - 0.169 TempPress What Should We Monitor?

Control Strategy Roadmap Step 1 - Monitor Variables For Out Of Control Conditions Strength Seems To Be In Control

Control Strategy Roadmap Step 1 - Monitor Variables For Out Of Control Conditions Looks Like a Problem With Yield – What Now ??

Control Strategy Implementation Step 1 - Monitor Variables For Out Of Control Conditions Experimental Results Indicated Yield Is A Function Of Pressure And Temperature Remember Yield = - 1690 + 15.7 Temp + 41.7 Press - 0.0338 TempSqr - 0.281 PressSqr - 0.169 TempPress Let’s Take A Look At The KPIV’s Pressure and Temperature

Control Strategy Roadmap Step 1 - Monitor Variables For Out Of Control Conditions Pressure seems to be in good control, though the pattern should be investigated.

Control Strategy Roadmap Step 1 - Monitor Variables For Out Of Control Conditions Historic Mean 124 Historic StdDev 2.7 Big Trouble on Temperature !!

Control Strategy Roadmap Step 2 - Develop Alarm and Recording Strategy Process Alarms Online alarms key to process waste reduction Identify key alarm points throughout the process Do not alarm too many points – they will be ignored SPC - Control Charts are effective alarm mechanisms Data Recording Record alarms to identify patterns of out of control conditions Online data trending assists in monitoring process shifts Record and analyze KPIV’s to prevent waste production Developing an Effective Process Alarm Strategy is Key To Reducing Waste and Defects

Control Strategy Roadmap Step 3 - Finalize Process Sampling Plan Use KPOV = f(KPIV1, KPIV2, …) predictive relationships to minimize routine process sampling Take product samples when SPC and on-line alarms indicate out of control conditions (In theory not practice) Be sure sample size is adequate through use of sample size calculations Document sampling plan and communicate to production, lab, technical, order processing and other key groups

Step 4 - Document Control Plan For Each Key Variable… Control Plan Purpose Step 4 - Document Control Plan For Each Key Variable… The Purpose Of An Effective Control Plan Is To: Operate processes on target with minimum variation Minimize process tampering (over-adjustment) Assure that process improvements become institutionalized (ISO 9000 can assist here) Provide for adequate training in all procedures Identify required maintenance schedules Revise Quarterly

Factors Impacting a Good Control Plan Step 4 - Document Control Plan For Each Key Variable… These need to be Measurement Preliminary updated before System Analysis proceeding Measurement Process System Analysis Maps Short Term %R&R, %P/T Capability Calibration C&E Requirements Matrix Initial Control Plan Assessment Sampling & FMEA Testing Plans Customer Control Plan Requirements Long Term Capability Maintenance SPC Plans Schedules Trouble Noise Variable Shooting Operating Compensation Training Aids Windows Materials Reaction Plans DOE's SOP's Improvement Procedures Activities

Control Plan Summary Sheet Step 4 - Document Control Plan For Each Key Variable… Control Plan.XLS

Control Plan Components Step 4 - Document Control Plan For Each Key Variable… Process map steps Key process output variables, targets & specs Key process input variables with control limits Important noise variables (uncontrollable inputs) Short and long term capability analysis results Designated control methods including: SPC Automated process control Checklists Mistake proofing systems Standard Operating Procedures Sampling & Testing Meas. Sys. Analysis Training Materials Maintenance schedules Reaction Plan and Procedures

Other Tips in Documenting Improvements Step 4 - Document Control Plan For Each Key Variable… Utilize your team and / or affected individuals Test the procedure exactly as it is documented Outline a method for updating procedures Date your procedures Destroy obsolete procedures Have an audit plan to verify compliance Responsibility for documenting control plan and updates New Process Step 1 Step 2 Step 3 Step 4 Project

Step 4 - Document Control Plan For Each Key Variable… Auditing Procedures Step 4 - Document Control Plan For Each Key Variable… Directly By Observation Are people actually doing what the procedure says? Are all the steps being followed? Are people referring to the procedure? By asking those using the procedure Is each step in the procedure clear? Are you having difficulty in following the procedure? Could we improve the procedure and still get results? Indirectly When was the last time the instruction was revised?

Documentation Package Control Plan Scope Customer Summary Maps MSA FMEA’s Capability Critical Parameters SOP’s Training Maint. Trouble Shooting Reaction Plans

Summary Explored the steps for setting up controls for your project Reviewed Control Plan elements Reviewed the need for well documented control plans to “sustain the gains” Control plan derived from tools and learning's in implementing model discussed in this course Identify person who will be accountable for control plan documentation and updates

Exercise 1.) Your Catapult Team should complete page 13 of the blue “Catapult Process” handout. Limit yourselves to 15 minutes for this exercise.