1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
SCM 494 Dr. Ron Tibben-Lembke
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
SCM 494 Dr. Ron Tibben-Lembke
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Lean operations and JIT
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Visual Workplace - A Prerequisite To Becoming World Class
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Chapter 4 5S.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Ten Steps to Lean Production Steps to CIM 1.Re-engineer (revisit, replan) the manufacturing system Form U-cells to produce families of parts (clusters)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Lean Basics Dewey Warden.
LEAN system.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
A Workplace Organization Method
Philosophy and Key Concepts
Visual Management Quick Review
Lean Manufacturing Visual Systems XYZ Company.
QUALITY SYSTEM 5 S.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 15 Lean operations and.
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
Lean Project Management Principles
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Just In Time Manufacturing Push Manufacturing vs. Pull Manufacturing Push System: Traditional production system as parts are processed based on the master.
HOUSE KEEPING A base for any improvement u Even before you plan the direction you need to take, you must remove any obstacles to get a clear view of the.
Lean operations and JIT
Lean Manufacturing Basic Overview XYZ Company.
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Industrial Engineering Department, Dokuz Eylul University, Turkey
SCM 494 Dr. Ron Tibben-Lembke
Inputs and Outputs to APP
Presentation transcript:

Building Lean Systems 5S, VA/NVA

The Read Cost of Inventory Inventory adversely affects all competing edges (P/Q/V/D) Has cost Physical carrying costs Financial costs Cause obsolescence Due to market changes Due to technology changes Leads to poor quality Feed back loop is long Hides problems Unreliable suppliers, too much scrap, large changeover times, machine breakdowns. long flow time

Enable Flow: River Analogy A "river and rocks" analogy likens the water level to the inventory level in a facility. A higher water level hides potential blemishes in the process. As the water level is lowered, these problems surface, forcing management to correct. The key is to resist to reduce the inventory level too quickly. Lower the water level a little, break apart the exposed rocks (obstacles), and then lower the water level once again. Capacity Imbalances Scrap Large Setup Times Unreliable Suppliers

The Lean System As attempts are made to reduce inventory levels, other major elements that should be in place are Reliable processes Preventive maintenance systems Cross-trained workers Setup reduction programs Reliable suppliers. Partnership with supplies, schedule visibility If these are not already present in a factory, putting them in place takes time-it cannot happen overnight. The Japanese spent bout 20 years perfecting the system before the US automakers observed TPS.

The Lean System For the boat to move faster, all the oars should be in the water at the same time. Balance the flow across the supply chain Have all processes working at the same rate Having some resources working faster than others will pile up inventory. Making sure all resources respond to pull signals ensures a smooth flow of products across the enterprise, or the supply chain.

The important lean thinking tools to promote flow Flow Chart the Process Value- and non-value added activities Takt Time Average Labor Content, and minimum manpower Mixed Model Scheduling One Piece Flow Cellular Layout Standard Work Pull Replenishment: Placing a cap on WIP Point-Of-Use Material Storage Mistake Proofing and Method sheets Continuous Improvement and the Pursuit of Perfection

The Toyota Production System (TPS) & JIT Kan-Ban Layout of The Plant Kaizen Moving Assembly Line Supermarket Operations Waste Reduction The Outcome JIT  Every step should work in harmony

How to Implement The goal of lean is to transform inputs into outputs faster; a piece of paper that reaches its destination more quickly. No waiting, no delay. Question Implement lean on all processes and activities or first focus on a subset? Implement lean on all products or first on a subset? Answer: Choose one product family at a time and implement lean on all the processes and activities that apply to that product family before moving on to the next product family.

5 S: A systematic process for organizing the workplace Five simple yet powerful activities. The benefits of a 55 program can be so dramatic that the enterprise may step away from a full lean implementation, thinking mission accomplished. Japanese Definition English Example Seiri Tidiness Sorting Throw Away Rubbish Seiton Organization Storing 30-Sec Doc Retrieval Seiso Cleanliness Sanitizing Individual Responsibility Seiketsu Neatness Standardizing Clear Written Instructions Shitsuke Discipline Sustaining Do 5S Activities Daily

Seiri & Seiton Seiri: Items are classified as Necessary Unnecessary  disposed of immediately. Red tag  "auctioned" for anyone to claim as necessary. No claim  discarded Seiton: arrange the necessary items in order so that they can be picked up easily. Create storage systems and provide visual information about what & how much should be stored in a given spot. Tools are typically hung on boards, with a silhouette (shadow box) of the tool painted. Drawers are lined with Styrofoam, with cutouts of the items to be stored.

Seiso Seiso: keeping the area clean, taking pride in a workplace that is well organized and kept in good condition. Not just sweeping the floor and cleaning up leaks and spills. Checks for things like malfunctioning machinery or loose parts on machines. If machines are kept clean, oil leaks will be discovered before a catastrophic equipment failure If aisles are kept clean and free of any oil spills, the chances of accidents are minimized, and so on.

Seiketsu, Shitsuke Seiketsu: the basis for standardization. Covers both personal and environmental cleanliness, defines the standards by which personnel must measure and maintain "cleanliness." What the normal condition should be. How an abnormal condition should be corrected. Visual management; by color-coding and standardization of colors for easier identification of problems. Personnel are trained to detect such problems using one or more of their five senses and to correct them immediately. Shitsuke: sustain the first four steps. An integral part of a 5S program is a system for maintaining the first four 5S.

Identify Value & Non-Value Added Activities Value added; An activity that adds value to the product in the eyes of the customer. Non-Value added: any thing else. Identifying and eliminating or reducing NVA activities is key to streamlining a process. Streamlining the process Process flow chart  captures the logical sequence of activities  to eliminate NVA activities. Spaghetti diagram  depicts the physical movement of products  the extent of travel, and back-tracking. To come out with a better layout.

Process Flow Chart and Spaghetti Diagram

Value Added Ratio is Low The Value added ratio = Total VA time divided by the total process time. While the value-added ratio depends on the industry, a ratio of 10% is suggested. It is 1.8% in the previous flow chart. It indicates the amount of waste and opportunities for lean efforts to remove waste. The process flow chart should be drawn after 5S. If before, lack of attention to simple housekeeping activities may obfuscate some of the NVA activities. For instance, the operators could be taking more time to change tooling simply because they cannot find the tools, and that may be reflected in the time standards set for tool changeover.