Roger Scheuermann Commercial Director WWW.HWCG.ORG.

Slides:



Advertisements
Similar presentations
Emergency Operations Centers & Incident Action Planning Process
Advertisements

© 2014 HWCG LLC SCAA Annual Meeting 1 HWCG HWCG Mutual Aid.
Hospital Emergency Management
Regulatory Lessons Learned Drills, Plans, Training and Response
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
MWCC Overview, Well Containment Operations & SIMOPS Spill Control Association of America – Annual Meeting March 20, 2014 Carmine Dulisse.
Crises in Schools.  Increase knowledge of planning and preparing for school crises  Increase ability of schools to create and implement crisis plans.
Marathon Oil Corporation. Setting the Stage HWCG LLC (formerly Helix Well Containment Group):  24 RP company deep water cooperative, plus 37 service.
Visual 3.1 Unified Command Unit 3: Unified Command.
Visual 3.1 Unified Command Unit 3: Unified Command.
1 Continuity Planning for transportation agencies.
Term Paper problem (as-is) Case Study The Deepwater Horizon Accident: What Happened and Why? BY Haitham muhsen: CS/SE 6361 Executive.
Spring 2008 Campus Emergency Management Program Overview
Incident Command System Basic Course
Application. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and Risk Management.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Operations Section.
Spill Prevention and Control Regulatory Requirements Hazardous Waste Operations and Emergency Response (HAZWOPER) –29 CFR –Covers spill response.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
What Is It And How Will We Measure It?
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Gulf of Mexico Simultaneous Operations Safe Work Practice
1 Overview Charlie Williams – Shell API Summer Standardization Conference 28 June
IS-700.A: National Incident Management System, An Introduction
SCAA 2014 Annual Meeting Safety & Environmental Management Systems (SEMS) Centre for Offshore Safety (COS) Overview Charlie Williams Executive Director.
POD PLANNING GUIDE. INTRODUCTION This guide is intended to be a simplified step-by- step guide through the process of planning a Point of Dispensing (POD)
NIMS Command and Management IS-0700.A – October 2014 Visual 6.1 NIMS Command and Management Unit 6.
After Deepwater Horizon: The New Offshore Regulatory Regime 66 th annual Oil and Gas Law Conference Houston, Texas February 20, 2015 Copyright © 2015 by.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
PAR CONFERENCE Homeland Defense A Provider’s Perspective Lessons from TMI Dennis Felty November 15, 2001.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
IS-700.A: National Incident Management System, An Introduction
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Spill Prevention and Control.
Advancing Global Deepwater Capabilities National Ocean Industries Association Annual Conference – April 15, 2011.
Nursing Home Incident Command System
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan Development Status August, 2008.
Unit 7: Demobilization, Transfer of Command, and Closeout
ADM 677 Crisis Management in Educational Settings Karen McCuiston Kentucky Center For School Safety.
1 Crisis Management / Emergency Management Overview.
Title? 1. 2 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Report to the President
Traffic Incident Management at the Big Dig Presenter: Kevin A Duffy- CA/T Manager of Emergency Planning & Response
Unit 4: Functional Areas and Positions
Developing Plans and Procedures
Minerals Management Service Pipeline and Natural Disasters- Are we Prepared? Restoring Trust in Pipeline Safety A Conference for all Stakeholders November.
Visual 6.1 Incident Resource Management Unit 5: Incident Resource Management.
Visual 2.1 G191: ICS/EOC Interface Workshop Unit 2: Incident Command System (ICS) Review.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
1 Presentation to the Alaska Senate Resources Committee
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
EMS Seminar #4 – Disaster Preparedness Joseph Ip BSc (Hon), MSc, MD VGH Emergency May 28, 2002.
“We believe in providing products and solutions that will increase our customers’ productivity and profitability.”
Developing Local and Regional Incident Management Teams Bob Koenig Incident Management Team Coordinator Texas Forest Service.
Off-Shore Service Vessels Deployment for Gas Exploration – Their Role in SAR SOTIRIOS THEOFANIS Fellow, Rutgers University, New Jersey, USA Visiting Senior.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
Randall (Randy) Snyder, PT, MBA Division Director January 27, 2016
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
District’s Plan for Disaster Preparedness.
MWCC Containment System Mobile Area Committee December 18, 2013
Marine safety Unit Savannah
USCG Roles & Responsibilities During a Ship Fire
January 2014 Mutual Assistance Drill
IS-700.A: National Incident Management System, An Introduction
CRISIS MANAGEMENT PLAN
Unit 6: Incident Resource Management
Louisiana School Emergency Management Program
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

Roger Scheuermann Commercial Director

BOEMRE - NTL No N10 Applies only to operators conducting operations using subsea blowout preventers (BOPs) or surface BOPs on floating facilities. BSEE will be evaluating whether each operator has submitted adequate information demonstrating that it has access to and can deploy containment resources that would be adequate to promptly respond to a blowout or other loss of well control.

BOEMRE – NTL 2010 – N10 BSEE evaluation includes, but is not limited to the following: o Subsea containment and capture equipment, including containment domes and capping stacks o Subsea utility equipment, including hydraulic power, hydrate control and dispersant injection equipment o Riser systems o Remotely operated vehicles (ROVs) o Capture vessels o Support vessels o Storage facilities BSEE will also evaluate whether there is adequate information identifying personnel who will be available to respond to a blowout or other loss of well control requiring the deployment of containment resources.

Formation of HWCG HWCG mission was to develop a comprehensive and rapid deepwater containment response system to meet NTL N10 regulations. Members include 15 deepwater oil & gas companies that have access to specific equipment under agreements with Helix Energy Solutions Group and 30+ additional identified vendors. Purpose was to develop an effective and timely response to a deepwater well containment incident in the Gulf of Mexico. Response time reduced from weeks to a few days depending on location of well, equipment and weather. HWCG is not for profit company HWCG core equipment under contract (HESG - Q4000, HP1) works on a daily basis to maintain and train personnel.

HWCG Members  ATP Oil & Gas Corporation  Cobalt International Energy, LP  Deep Gulf Energy, LP; Deep Gulf Energy II LLC  ENI U.S. Operating Company  Talos Energy - ERT GOM Inc.  LLOG Exploration Company, LLC  Marathon Oil Company  Marubeni Oil & Gas (USA), Inc.  Murphy Exploration & Production Company - USA  Noble Energy, Inc.  Freeport McMoRan Oil & Gas  Repsol E&P USA Inc.  Stone Energy  Walter Oil & Gas Corporation  W&T Offshore 5

HWCG "Model" “Fit-for Purpose” Tried and Tested Equipment /Purpose-built Collaboration Protocols Well Containment Plan Response Protocols

Q4000 DP3 MODU US Flag – ABS classed 600 Ton Multi Purpose Tower (Derrick) 360 Ton / 160 Ton Deepwater Cranes 2 x 150 HP ROVs 3,000 barrel fluid handling system Open deck versatile – intervention rig with moon pool Seven (7) Knots transit speed

FPU DP2 Helix Producer I Process Capacity: 45,000 BOPD 60,000 BLPD 80 MMCFD (can be expanded) BSEE and USCG approved FPU with quick disconnect.

Intervention Riser System (IRS) Package

10K Well Capping Stack Ingleside, TX 13 5/8” – 10K – Dual Ram

15K Capping stack HWCG 18 ¾” full opening 15K psig double ram capping stack with 4 – 5” 15K side outlets Houston, Texas

HWCG Tophat

HWCG - Helix Fast Response System

14

Level of Readiness – Immediate – Fast Response HP 1 – Disconnect in 45 seconds Q4000 – released when safe operations Ability to capping wells with max shut-in pressure of 10K & 15K psi at water depths up to 10,000 ft. Capture and flow back operations to Q4000 and HP1 up to 55,000 BOPD & 95 MMSCFD Mutual Aid Agreement Deepwater Intervention Technical Committee (DITC) member notification process in place for technical expertise for all members.

Preparedness Exercises 16

Preparedness - Training All HWCG members have signed a Mutual Aid Agreement that outlines the manner in which the 15 member companies will share technical experts and critical equipment during an event to a member. HWCG held 60+ well containment exercises over the last 2 years. This test the Well Containment Plan and Mutual Aid. This includes hundreds of experts from member companies, contract vendors and agencies Over 55 Permits approved with several in review – First permits (3), First floating facility - TPL/SPAR, First flow and capture permits. Additional internal exercises continue to assure teams are prepared for the 6 primary position on the Source Control ICS organization chart. Focus on specific area training, and continue to learn and test the plan and work each area of responsibility.

HWCG – Command Center 15,000 square feet work area - Dedicated Numerous hotels in area – 5 within 1 mile Restaurants within walking distance Shuttle parking Audits – IT, Security, HS&E 48 hour notice before move in. Rentsys - displays 18 Command Center Location PetroSkills Conference Center Katy Mills Parkway Katy, Texas Phone Fax

ICS Organization 19 Incident Commander Source Control Section Chief Source Control Section Chief Public Information Officer Public Information Officer Liaison Officer Liaison Officer Safety Officer Safety Officer Command Staff General Staff Planning Section Chief Operations Section Chief Finance/Admin Section Chief Logistics Section Chief

Source Control ICS Organization 20 G & G Drilling Engineering Directional Drilling Debris Removal ROV Operations Supply Vessel Anchor Handling Intervention Vessel Well Control Utility IWOCS Pumping Chemical Flow Assurance Reservoir Engineering Dispersant Flow Calculations Vessel Management Marketing Sales Source Control Chief Deputy Source Control Source Control Chief Deputy Source Control - RP/Vendors - RP-Mutual Aid Relief Well Group SIMOPS Group Containment OPS Group Flow Engr’s Group Flowback Group

Well Containment Plan The HWCG Deepwater Intervention Technical Committee (DITC) worked with BSEE staff in a concerted effort to develop a comprehensive Well Containment Plan (WCP) – Addresses the agency requirements in NTL 2010-N10. – BSEE approved HWCG RCD-Regional Containment Demonstration plan. The WCP uses well established procedures and lessons learned from past incidents: – Comprehensive procedures and schedules addressing multiple well control scenarios (3) and responses – Pre-identified services and equipment – Comprehensive call out and “rapid response” activation protocols

HWCG – IMH Incident Management Handbook for Source Control

Actual visualization of specific operations

Source Control follows the NIMS – ICS Planning P to stay in synch with Incident Management Team

All roles and responsibilities are spelled out with description and checklist for ease understanding and operations. This show consistency between all members.

Process of how Source Control would work with IMT/Unified Command in different locations.

Well Containment Plan – Shut-in w/ Well Cap Response Schedule, Equipment & Services Site Assessment & Initial Response Debris Removal LMRP or BOP Removal Well Cap Installation Well Shut-in Procedure Intervention Riser System (IRS) installation Well Kill & Abandonment Contingent “Flow & Capture” Operation 27

Member (RP) calls 24-Hr Emergency Number Call Report is taken by ChemTel Drill or Incident ChemTel contacts HWCG HWCG calls DITC Chair and RP. Initial resources scoped. Conference HESG and/or Trendsetter. Equipment and/or Personnel Activation HESG Equipment only Personnel HESG will make notifications to appropriate parties for deployment HWCG will notify Group Leaders via SWN notification system Personnel and Equipment will be activated based on the needs of the Responsible party HWCG Incident Call-out Procedures AcronymName RPResponsible Party (Member) HWCGHelix Well Containment Group HESGHelix Energy Solutions Group TEITrendsetter Engineering, Inc. SWNSend Word Now (Notification System)

BSEE – HWCG Equipment Deployment DOI is requiring HWCG to conduct a capping stack deployment operation in April/May 2013 to demonstrate the group’s ability to implement their response plan as outlined in their current approved generic Well Containment Plan (WCP). The deployment plan outlined by BSEE indicates that source control was the focus area with the physical deployment and testing of the capping stack being the primary emphasis. Exercise was initiated through the conventional BSEE unannounced drill program. The HWCG DITC established a support team to work with the RP (Noble Energy) on planning and execution of the deployment. Exercise initiated mobilization of full SMT which was stood down once it fulfilled the requirements set forth by BSEE during the exercise.

The HWCG mutual aid program activated to the extent necessary. ICS implemented throughout the exercise, formal IAP developed. 24-hour operation 13 5/8” 10K capping stack deployment from Ingleside, TX location. Excess of 5,000 feet water depth. Test and function capping stack while on bottom. Standard notifications of equipment and personnel will follow plan processes. – Mutual Aid – Vessels – Dispersants – Debris removal Safety is priority one!!! 30

Key Strengths Mutual Aid Agreement: Allows 15 deepwater companies to share resources (personnel and equipment) to withstand long-term events. Expertise in different areas of event. Preparedness: Extensive training with numerous source control exercises which facilitates a learning environment. Well Containment Plan is a living document and will be updated as we achieve improved processes and procedures service providers bring expertise to exercises and event. Core system equipment is maintained and operated daily in the GOM with experienced crews poised to respond. Expansion plans are based on achievement of capacity growth by our members’ needs and requirements. Generic plan to be utilized by all members. 10K and 15K capping stack – 18 ¾” full-bore, double ram intervention capping stack. HWCG is ready to respond to any well containment event in U.S. GOM.

HWCG GOM Subsea Oil Spill Control & Well Containment Roger Scheuermann