4.2.11 Student Book © 2004 Propane Education & Research CouncilPage 1 4.2.11 Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.

Slides:



Advertisements
Similar presentations
Installing & Testing Regulators
Advertisements

3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5 Student Book © 2004 Propane Education & Research Council 2.5 Operating a Truck, Tank Trailer or Tractor/Trailer to Deliver or Relocate ASME Tanks.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Identifying Equipment & Procedures Used on Propane Transports
4.1.8 Student Book © 2004 Propane Education & Research CouncilPage Selecting Piping and Tubing After completing the gas customer profile and examining.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Unit 206: Domestic hot water systems
4.1.7 Student Book © 2004 Propane Education & Research CouncilPage Selecting Regulators for Vapor Distribution Systems Regulators are mechanical.
4.1.4 Student Book © 2004 Propane Education & Research CouncilPage Designing Aboveground ASME Tank Installations A very important decision in designing.
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
Liquefied Petroleum Gases. Hazards of LP gas v Flammable v Asphyxiant 1a.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
Preparing Foundations for Cylinders & ASME Tanks
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
HVACR116 – Trade Skills Longest length method.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
MODULE 2 Operate the Propane Liquid Supply System.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Installing DOT/ICC Exchange or Stationary Cylinders
Designing DOT Exchange and Stationary Cylinder Installations
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Presentation transcript:

Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders or ASME tanks, it is essential to understand and identify the different components and applications required by safety codes for their installation. In this module you will learn to: (1)Identify basic NFPA code requirements for manifold container installations (2)Identify manifold cylinder systems and applications (3)Select components for manifold cylinder systems (4)Identify components for typical vapor service manifold tank installations with single regulator configuration (5)Identify components for typical vapor service manifold tank installations with parallel regulator configuration (6)Identify code requirements and components for manifold tanks in liquid service

Student Book © 2004 Propane Education & Research CouncilPage 1 NFPA Code Requirements for Manifold Container Installations 2001 Edition Reference NFPA 58 Requirement 2004 Edition Reference 2.3Liquid outlets of tanks and cylinders must be equipped with internal excess flow valves ASME tanks that have liquid interconnections must be installed so that the maximum permitted filling level of each tank is at the same elevation (c)An excess flow valve sized for the smaller diameter pipe is required at any reduction in pipe size where liquid piping conveys liquid LP-gas into a building or structure, such as a building or structure housing a vaporizer

Student Book © 2004 Propane Education & Research CouncilPages 1& 2 NFPA Code Requirements for Manifold Container Installations 2001 Edition Reference NFPA 58 Requirement 2004 Edition Reference (a)(4)Most propane system installers and jurisdictional authorities interpret (a)(4) as a requirement for excess-flow protection in manifold tank or cylinder installations, where the first-stage regulator is connected to tank service valves using vapor piping longer than the pigtail used in typical single tank installations and where the regulator is installed outside of the tank dome (F) 3.2.2Manifold containers must be located in compliance with the minimum separation distances from important buildings, property lines that may be built upon, and other containers as shown in Table Separation distances from container relief valves and building openings must comply with Table (d). 6.3 Table Table 6.3.9

Student Book © 2004 Propane Education & Research CouncilPage 2 NFPA Code Requirements for Manifold Container Installations 2001 Edition Reference NFPA 58 Requirement 2004 Edition Reference 3.2.2At a consumer site, if the aggregate water capacity of a manifold container installation comprised of individual containers having a water capacity of less than 125 gallons is 501 gallons or more, the minimum distance shall comply with the appropriate portion of Table , applying the aggregate capacity rather than the capacity per container. If more than one such installation is made, each installation shall be separated from any other installation by at least 25 feet

Student Book © 2004 Propane Education & Research CouncilPage 2 Identifying Manifold Cylinder Systems and Applications Figure Pound Exchange Cylinders Figure Pound Stationary Cylinder When two or more cylinders are connected, the vapor supply system is called a “manifold cylinder installation.” The cylinder filling method, and therefore, the type of cylinder used, generally determines the methods used for manifold cylinder connection, vapor flow control, and regulator selection. Two basic manifold system types are: Manual or automatic changeover systems, used with exchange cylinders Dual cylinder manifold systems, used with stationary cylinders

Student Book © 2004 Propane Education & Research CouncilPage 3 Identifying Manifold Cylinder Systems and Applications Manual Changeover System— This manifold system relies on the customer to manually open and close the exchange cylinder service valves, or to switch over the valve in a connecting tee-block when the supply cylinder is empty and the reserve cylinder is needed. Automatic Changeover System— This cylinder manifold uses a special two-stage regulator combining the first stage and second stage into one unit. Normally this regulator is connected to two cylinders or two banks of cylinders (Figure 3). When the pressure in the supply cylinder(s) drops to a low level, the regulator automatically switches over to the reserve cylinder(s) and does not interrupt the supply to the appliances.

Student Book © 2004 Propane Education & Research CouncilPage 3 Identifying Manifold Cylinder Systems and Applications Figure 3. Automatic Changeover Regulator Manifold Figure 4. Cross-Section View of Two-Stage Regulator with Automatic Changeover, Service Pointer, and Service Indicator

Student Book © 2004 Propane Education & Research CouncilPage 4 Identifying Manifold Cylinder Systems and Applications Figure 5. Dual Cylinder Installation (Stationary Service) Dual Cylinder Manifold System— The cylinders of a stationary or dual cylinder installation are filled on site. Both cylinders usually supply propane to one regulator at the same time.

Student Book © 2004 Propane Education & Research CouncilPage 4 Selecting Components for Manifold Cylinder Systems Figure 6. Pigtails Service Valve Pigtails

Student Book © 2004 Propane Education & Research CouncilPage 5 Selecting T-Blocks for Manifold Cylinders Figure 7. T-Check Figure 8. Manual Changeover Tee Manual Changeover Systems— The T-check is basically a T-block with a built-in floating check valve. When the empty supply cylinder is removed, the pressure in the full cylinder forces the check valve to slug shut. This allows the cylinder to be replaced without interrupting service to the appliances or discharging propane from the full cylinder.

Student Book © 2004 Propane Education & Research CouncilPage 5 Selecting Components for Manifold Cylinder Systems Figure 9. Automatic Changeover (Low Capacity System) Automatic Changeover System— For medium capacity systems (4 or 6 cylinders), assemble a manifold using POL T-block fittings and pigtails (Figure 9). One of the benefits of this type of arrangement is that additional cylinders can be connected to the assembly by simply adding POL T-blocks and pigtails.

Student Book © 2004 Propane Education & Research CouncilPage 6 Selecting Components for Manifold Cylinder Systems Figure 10a. POL T-BlockFigure 10b. POL T-Block Cutaway View Figure 11a. POL T-Check Figure 11b. POL T-Check Cutaway View

Student Book © 2004 Propane Education & Research CouncilPage 6 Selecting Components for Manifold Cylinder Systems Figure 12. Automatic Changeover (High Capacity System) For high capacity systems (above 750,000 Btu/hr) it is a good idea to use a rigid pipe manifold similar to the one illustrated in Figure 12. The supply manifold is assembled from 1/2" schedule 80 pipe and extra heavyweight pipe T's. Each cylinder is connected to a pipe T by a short pigtail. Each side of the manifold is connected to an inlet of the changeover regulator by an extra heavy-weight union and a short pipe nipple.

Student Book © 2004 Propane Education & Research CouncilPage 7 Selecting a Cylinder Manifold Pressure Regulator Figure 13. Integral 2-Stage Regulator Pressure regulators for manifold cylinder installations must be a two-stage system and must meet the requirements of NFPA 58, LP-Gas Code, and UL 144 standard for LP-gas regulators. The standards require sufficient excess pressure relief capacity to prevent gas pressure in excess of 2 psig from reaching the customer’s gas appliances, even in the event of failure of the first and second stage regulators in the full-open position. Two factors must be considered when selecting the manifold system regulator: Manifold system type Total gas appliance demand in Btus per hour

Student Book © 2004 Propane Education & Research CouncilPage 8 Selecting Components for Manifold Cylinder Systems Figure 14. Automatic Changeover (2-Stage) Regulator Regulators selected for cylinder manifold systems must have Btuh rating capacities in excess of the total gas appliance system load.

Student Book © 2004 Propane Education & Research CouncilPage 9 Selecting Components for Manifold Abovground Systems Figure 15. Manifold Aboveground ASME Tanks Figure 16. Excess-Flow POL Fitting

Student Book © 2004 Propane Education & Research CouncilPage 10 Selecting Components for Manifold Underground Systems Figure 17. Manifold Underground ASME Tanks The loops in the copper tubing are used to provide flexibility for the tubing in the event of tank or regulator post movement due to settling or soil frost heave.

Student Book © 2004 Propane Education & Research CouncilPage 10 Components for Manifold Vapor Service Tank Installations with a Single Regulator Figure 18. POL Back Check Tee Underground manifold tank installation components: 1.Regulator vent pipe-away assembly 2.POL back check tee 3.Open-bottom water meter or valve box, or poured-in-place concrete vault with loose-fitting manhole cover

Student Book © 2004 Propane Education & Research CouncilPage 11 Components for Manifold Vapor Service Tank Installations with Parallel Regulators Figure 19. Manifold ASME Tanks & Parallel First-Stage Regulators

Student Book © 2004 Propane Education & Research CouncilPage 11 Components for Manifold Vapor Service Tank Installations with Parallel Regulators Figure 19. Manifold ASME Tanks & Parallel First-Stage Regulators The installation illustrated could use aboveground or underground ASME storage tanks. If underground tanks are used, aboveground location of the regulator manifold is recommended. Support for the regulator manifold should by provided by the use of a support post similar to the one used in the single regulator installation.

Student Book © 2004 Propane Education & Research CouncilPage 12 Identifying Code Requirements and Components for Manifold Tanks in Liquid Service Figure 20. Excess- Flow Angle Valve If the actuated liquid withdrawal excess-flow valve (sometimes called an evacuation valve) is used for manifold tank connection, one of two forms of excess- flow protection must be provided: 1.A liquid transfer valve attached to an actuated liquid withdrawal excess-flow valve that is recommended by the manufacturer for continuous service, or 2.If the tank’s evacuation valve is not approved for continuous service: The tank must be evacuated of liquid, and the vapor flared; Tank vapor pressure reduced to atmospheric pressure; The actuated liquid withdrawal excess-flow valve removed and replaced with a liquid transfer valve equipped with an internal excess-flow

Student Book © 2004 Propane Education & Research CouncilPage 13 Identifying Code Requirements and Components for Manifold Tanks in Liquid Service Figure 21. Internal Valve with Excess-Flow and Cutaway View If the bottom opening of the tank is used, it must be equipped with an internal excess- flow valve, and a manual shutoff valve installed as closed to the internal valve as possible. The use of a close or “all-thread” pipe nipple to make the connection between the manual valve and excess-flow valve is not recommended. In place of separate excess-flow and manual valves, a combined internal valve with excess-flow protection may be used. Internal valves of this type can be equipped with a remote closure feature.

Student Book © 2004 Propane Education & Research CouncilPage 13 Identifying Code Requirements and Components for Manifold Tanks in Liquid Service Figure 22. Hydrostatic Relief Valve Figure 23. Stainless Steel Braided Flexible Piping Section Liquid piping sections that can be closed at each end must be protected by the installation of a hydrostatic relief valve. Hydrostatic relief valves should have a 400 to 450 psig start to discharge rating. Liquid piping for manifold tanks is comprised of threaded schedule 80 pipe sections and heavy (2000 or 3000 pound) forged steel fittings. Piping flexibility is provided by use of flexible sections.

Student Book © 2004 Propane Education & Research CouncilPage 14 Identifying Code Requirements and Components for Manifold Tanks in Liquid Service Figure 23. Stainless Steel Braided Flexible Piping Section Flexible sections should never be used to make a turn or change in direction of piping runs. They must be installed in a straight piping run, and must not be compressed or stretched. Use of a flex section that is too long will lead to failure of the stainless steel braids, distortion of the inner corrugated tube, and eventual rupture.

Student Book © 2004 Propane Education & Research CouncilPage 14 Identifying Code Requirements and Components for Manifold Tanks in Liquid Service Figure 24. Slab for Manifold Liquid Service Tanks Attaching vapor loads to tanks in liquid service is not recommended, especially if an auxiliary liquid pump set with a low-pressure switch and diaphragm-type bypass is not provided to feed liquid to the vaporizer.

Student Book © 2004 Propane Education & Research CouncilPages Time to See If You Got the Key Points of This Module… Complete the Review on pages See if you are ready for the Certification Exam by checking off the performance criteria on pages