BKCASE Workshop V Case Studies January 26–28, 2011 Team: Aaron Eng Seng Chia, Heidi Davidz, Richard Freeman, Sandy Friedenthal, Tom Hilburn, Alex Lee,

Slides:



Advertisements
Similar presentations
Update for BKCASE Workshop VI Part V: Implementation Examples John Brackett, Aaron Chia, Heidi Davidz, Kevin Forsberg, Richard Freeman, Tom Hilburn, Alex.
Advertisements

Format 4.0 – Update Ohio EPA/SWMD Workgroup August 18, 2011.
WebQuests Presented by Frank H. Osborne, Ph. D. © 2005 Bio 2900 Computer Applications in Biology.
EPICS Conceptual Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to.
SE 470 Software Development Processes James Nowotarski 21 April 2003.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Creating Architectural Descriptions. Outline Standardizing architectural descriptions: The IEEE has published, “Recommended Practice for Architectural.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
PM Summit Overview Daniel Vitek MBA, PMP – Consultant to CDC.
PMBOK Version 5 – What are the Changes?
ASPEC Internal Auditor Training Version
Orientation to the Social Studies K to 7 Integrated Resource Package 2006.
Quality Representative Training Version
Software Project Management Course Instructor Samana Zehra (Assistant Professor)
Welcome ISO9001:2000 Foundation Workshop.
Purpose Program The purpose of this presentation is to clarify the process for conducting Student Learning Outcomes Assessment at the Program Level. At.
What is Business Analysis Planning & Monitoring?
Fusion GPS Externalization Pilot Training 1/5/2011 Lydia M. Naylor Research Lead.
Chapter 4 Interpreting the CMM. Group (3) Fahmi Alkhalifi Pam Page Pardha Mugunda.
What We Talk about When We Talk about Teaching Writing Margaux Sanchez Supported by The Center for Excellence in Teaching and Learning.
Business Communication Workshop
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Outbrief for BKCASE Workshop VI Part V: Implementation Examples John Brackett, Aaron Chia, Heidi Davidz, Kevin Forsberg, Richard Freeman, Tom Hilburn,
Thomas College Name Major Expected date of graduation address
March 26-28, 2013 SINGAPORE CDIO Asian Regional Meeting and Workshop on Engineering Education and Policies for Regional Leaders Programme Evaluation (CDIO.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
ARF Strategic Guidance Technical Working Group: Current Status of Initiative ASEAN Regional Forum Statement on disaster management and Emergency Response.
1 EDTE 316 Science Methods Fall 2007 Module 4 (Weeks 8,9 & 10) To properly navigate through this PowerPoint, go to “View” and click on “Slide Show”
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
Part IV: Organizing to Perform Systems Engineering Art, Alice, Heidi, Richard, Hillary, James, Garry, Ken, Dick.
Going Deeper with Mark Twain A WebQuest for 10th Grade Composition Designed by Sandy Schaufelberger Wes-Del High School, Gaston IN
The Conceptual Framework: What It Is and How It Works Linda Bradley, James Madison University Monica Minor, NCATE April 2008.
Copyright © 2009 Intel Corporation. All rights reserved. Intel, the Intel logo, Intel Education Initiative, and the Intel Teach Program are trademarks.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
An Update of COSO’s Internal Control–Integrated Framework
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Rational.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
Innovative Schools toolkit STRATEGIC WORKSHOP 2 Exploring good practice case studies.
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
Prepared by /Dr.Amira Yahia.. Introduction  Research proposals are an integral part of most studies, and are typically prepared after a researcher has.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Measuring Progress and Planning Learning William E. Dugger, Jr. Shelli D. Meade.
Moderator: Randy Gillis, Black Knight Financial Services Panelists: Mark Kleingers, Black Knight Financial Services Mick Smothers, Capco September 12,
Document Development Cycle
MOSH Adoption Team Training
INCOSE Usability Working Group
Regional Architecture Development for Intelligent Transportation
Decision Analysis Working Group
Unified Process Source & Courtesy: Jing Zou.
Continuous Improvement through Accreditation AdvancED ESA Accreditation MAISA Conference January 27, 2016.
The Enterprise Relevant Scope of DM
Introduction to vital statistics report writing
Atern v2 – Summary of changes from v1
Regional Architecture Development for Intelligent Transportation
EDD/581 Action Research Proposal (insert your name)
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
An Update of COSO’s Internal Control–Integrated Framework
Energy Statistics Compilers Manual
EDD/581 Action Research Proposal (insert your name)
Project Management Body of Knowledge
S-STEM (NSF ) NSF Scholarships for Science, Technology, Engineering, & Mathematics Information Materials 6 Welcome! This is the seventh in a series.
Presentation transcript:

BKCASE Workshop V Case Studies January 26–28, 2011 Team: Aaron Eng Seng Chia, Heidi Davidz, Richard Freeman, Sandy Friedenthal, Tom Hilburn, Alex Lee, Alice Squires Phoenix, AZ

Case Study Companion Document: Schedule and Forward Plan Update Draft for January Workshop – Need completed draft by January 14 th – January draft completed but immature / distraction – A copy is available upon request. Two Three Case Studies to be addressed – Singapore Water Management System (SWMS) – AFIT Global Positioning System (GPS) – AFIT Hubble Space Telescope (HST) Need a lead for this effort – No lead, Alice Squires (temporary, I hope!) Jan 25-28, 2011

Initial Companion Guide Developed for the most part early this month building on Chapter 16 material and adding HST. Primarily mapped existing case studies to the SEBoK Knowledge Areas (KAs) in more detail – Strong: thoroughly addresses all of the elements of the case study topic area – Moderate: most of the elements addressed, but some are missing or have limited coverage – Weak: many of the elements not addressed or have limited coverage – None: topic area not addressed in case study Jan 25-28, 2011

Ex/ Hubble Space Telescope StrongRelationship – SE Life Cycle – Life Cycle Model Mgmt – SEM Planning – Risk Management – Stakeholder Reqs – Integration Moderate Relationship – Value of SE – Principles of SE – Architectural Design – Operation Jan 25-28, 2011

Companion Guide Introduction Chapter 1: Purpose; Summary of systems engineering case study development efforts completed and underway Chapter 2: Case study outline and a table summarizing the case studies according to Ch. 16 template Chapter 3: Hubble Space Telescope (HST) case study published by the Air Force Institute of Technology (AFIT) Chapter 4: Global Positioning System (GPS) case study also published by AFIT Chapter 5: A large-scale systems engineering perspective of water management in Singapore case study and addresses the Singapore Water Management System (SWMS) Chapter 6: Summary (Final Thoughts or Road Ahead) Glossary References Jan 25-28, 2011

Case Study Outline An overview, including a short description, the application domain and application area (enterprise, service, or product), as defined in Chapter 16. An identification of the primary domain(s) of the case study. An description of the case study development including the methods used; the timeframe from initial data collection to final publication of the case study; and specific direction or policy that drove the methods used. The results from the case study criteria analysis that determines whether or not the case study will be accepted into the Companion guide as defined in Chapter 16. A mapping to SEBoK for every section as defined in Chapter 16. All sections are included for ease of locating a particular area by heading number. This is the same convention used in the Program Management Body of Knowledge extensions. This mapping can be accomplished in more than one way (see next slide). A summary and conclusion. This section summarizes the findings from the case study and the rationale for the findings. It also summarize the scope of applicability of these findings. Jan 25-28, 2011s

Three Approaches External Case Study (AFIT, NASA, Etc…) – No modification to external case studies. – Purposes achieved through detailed write-up in Companion Guide Modifiable Case Study (One that’s in process) – Can add annotations to case study as needed Terminology matching Additional explanations, linking, references, etc… New Case Study (Drive New Efforts) – Developed with SEBoK as guidance Jan 25-28, 2011

Companion Guide Purpose 1.To elaborate the principles, practices, and concepts from the SEBoK by adding domain dependent detail 2.To demonstrate how the principles, practices, and concepts from the SEBoK are applied and tailored (including terminology and rationale) to different: Application domains; Countries, regions, and cultures; Project characteristics (e.g. size & complexity) 3.To provide a means to evaluate the application of practices from the SEBoK including highlighting what works and what does not work 4.To provide a means to evaluate new and evolving principles, practices, and concepts (e.g. SoS, model-based, complex adaptive systems, etc.) 5.To motivate the use of SE principles, practices, and concepts to new users 6.To provide a teaching and training aid to new and experienced practitioners based on the above – ex/ in their domain Jan 25-28, 2011

SEBoK Ch. 16 Feedback Explanation/ActionsTotal Delete Case Study Chapter921% Keep case studies1638% New Case Study Suggestion/Reference819% Specific Action Suggested410% General Comment - No action512% Grand Total42100% Jan 25-28, 2011 Delete: Replace case studies with Technical Performance Measures (1) Keep: Integrate case studies throughout SEBoK (4) Keep: Add examples of failures (3) Note: HST not in Chapter 16 Keep: Put entire chapter in separate book (1)

Are case studies the way to go? Unanimous: Yes (7) (biased sample ) The case study is a valuable tool for understanding how to apply SE SE, unlike other technical disciplines is best observed through actions that, when combined, are intended to yield a desired outcome Encourages active participation and gives students a better sense of when and how to use knowledge; provides context; captures domain specific Show how SE concepts and practices were used (or misused or not used) in various domains - surely a valuable instructional resource But as teaching and training aids and to motivate the use of SE, not as proof and not to generalize from We have used case studies extensive and successfully for more than 30 years to impart to each successive generation of SE across a very diverse domain; but not the only didactic approach But requires experts in domain to properly relate to context of SEBoK Jan 25-28, 2011

BKCASE Technical Objective #6 Version 0.25 of the SEBoK will be domain independent. Domain dependent approaches to systems engineering knowledge will be captured through case studies of individual systems engineering projects applied to within specific domains. Those case studies will be companion documents to Version After Version 0.25 is complete, the decision to use case studies as the only means to capture domain specific knowledge will be revisited. Jan 25-28, 2011

For Consideration/Discussion Drop effort and include vignettes instead Continue on current course Incorporate Case Study Companion Guide into SEBoK Version 0.5 – schedule/logistically – As an appendix – As part of Chapter 16 – Integrated across chapters by KA Jan 25-28, 2011