Dana Point City Council Appellate Hearing Project: 32712 Crown Valley Parkway CDP04-11, CUP0421, SDP0431, Final EIR Final EIR SCH#2009041129 Co-Appellant:

Slides:



Advertisements
Similar presentations
Project Overview Statewide Storm Water Management Plan (SSWMP) A collection of program recommendations, procedures and new guidance material. Purpose.
Advertisements

The Free Market, Environmental Stewardship, and Rule of Law Lecture 1 of 3: Background Facts on Water as a Resource.
COUNTY OF LOS ANGELES FIRE DEPARTMENT FORESTRY DIVISION (323)
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
District of Columbia Stormwater Fees October 27, 2008 Apartment and Office Building Association of Metropolitan Washington Brendan Shane DDOE Office of.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Water School June 20, 2013 Loretta M. Bates, Ph.D. University of California Cooperative Extension San Diego County.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Life After Eckerd: Now What? Scott M. Deitche (’94) Environmental Specialist II Pinellas County Department of Environmental Management.
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
Chanhassen’s 2006 Surface Water Management Plan Carver County WENR Meeting March 27, 2007 Lori Haak Water Resources Coordinator
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
June 2, Appeal of South Shores Church Master Plan Certification Venue: Dana Point City Council Presented by co-appellant: Todd Glen Pompeii.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 24 Environmental Law.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
Chapter 10 Local, Regional, State, and Multistate Water Management Agencies.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Municipal Stormwater Permit Overview of Order R Issued by: California Regional Water Quality Control Board, San Diego Region NPDES No. CAS
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
CDP Application No Integral Communities 500 California Hwy 75, City of Imperial Beach CCC Hearing Item Th24b August 13, 2015.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
Monterey County Grading and Erosion Control Requirements and Enforcement Methods 1.
Stormwater 101 History of the Clean Water Act MARCH 22, 2016 WEST COVINA CITY COUNCIL CHAMBERS.
Russian River Estuary Management.
Adapting to Climate Change: Using the Green to Beat the Blues Roberta Clowater Executive Director Canadian Parks and Wilderness Society - New Brunswick.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Environmental Critical Areas Regulations
Sacramento County Stormwater Quality Program
Watershed Literacy & Engagement
Sacramento County Stormwater Quality Program
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Dana Point City Council Appellate Hearing Project: Crown Valley Parkway CDP04-11, CUP0421, SDP0431, Final EIR Final EIR SCH# Co-Appellant: CLEAN WATER NOW Presentation on June 2, 2015 Roger E. Bütow Executive Director

Non-Compliance, Failure To Notify & Update Issues Drainage, Significant Water Quality Impairments & Degradation Impacts to Wetlands and Multiple High Value Environmentally Sensitive Habitat Areas (ESHA) Agencies  San Diego Regional Water Quality Control Board (SDRWQCB) Region 9--Cal/EPA: NPDES, LID for Priority Development Projects, Hydromodification, Wetlands Protection Regs  California Department of Fish & Wildlife: Endangered & Threatened Species in ESHA, Wetlands  US Fish & Wildlife Service: Endangered Species in residence ESHA, Wetlands  US Army Corps of Engineers: Wetlands  California Coastal Commission: High Value ESHA, Wetlands in Coastal Zone  County of Orange Public Works & Orange County Watersheds  OC Parks: Applicant responsible for Increased Erosion & Slope Failure Jeopardizing the Salt Creek Corridor Trail

Slide Show of Existing Drainage, Bluff Erosion/Down-cutting and Degraded High Value (ESHA) Coastal Sage Wildlife Area  Blocked & dysfunctional Detention Basin(installed circa 1995) below Monarch Bay Villas NOT maintained: 20 Years is NOT a temporary construction BMP. Established new non-compliant surface hydrology in an Environmentally Sensitive Habitat Area (ESHA) degradation via erosion patterns NOT mitigated.  Project drainage devices: Bluff V-Ditches & Discharges non- compliant infrastructure NOT functional until rehab in late 2014: Due to multiple complaints to the SDRWQCB (Region 9- Cal/EPA) by Clean Water Now beginning in  Severely eroded slope down-gradient of Project, degraded ESHA. EX.: Crevasse down-cutting due to Project Applicant failure to maintain detention basin, City Failed to Enforce.  No O & M logs, no monitoring reports, surveys, logs or bio- assessments produced though repeatedly requested for either the Project Detention Basin, Bluff ESHA (Wildlife Enhancement Project Mitigation) or the Designated Wetlands west of Pointe Monarch. City failed to monitor, enforce or demand protection compliance.

POINTE MONARCH WETLANDS Re: Common Areas—Landscape Pointe Monarch NEVER identified as a restored wetlands by LSA. NOTE: Slide #2 Includes Wetlands Restoration Plan for California Coastal Commission consideration Slide #1 Tract Map #14605 (MAKAR PROPERTIES) Initialed by City of Dana Point staff Ms. Bobbi Ogan Dated 10/21/2002 Resubmitted 7/18/2003 Slide #2 Page L-14 Common Areas-Landscape Plan Landscape Planning and Wetlands Restoration Plan Registered with California Coastal Commission

Water Quality, Wetlands, Negatively Impacted Habitat Regulatory Compliance Protection Checklist  Applicant MUST reduce pollutant loading onsite if feasible: Cistern to have Advanced Waste Treatment System (AWTS). Proposed CDS Unit is incapable of significantly removing or reducing known, impairing contaminants before being discharged off-site. (See 2013 NPDES mitigation BMP and Jurisdictional Wetlands protection regulations by Resource Trustee Agencies).  Divert first 50,000 gallons/day of impervious runoff from onsite cistern via agreement with SOCWA. Feasible, this alleviates burden, lowers off-site discharge volumes/pollutant loading. (NPDES BMP)  Keep the existing drainage system pattern intact, i.e., Project to discharge directly into upper detention basin as a pre-treatment, bio-filtration structural BMP mitigation before discharging into V- ditch overflow below MBV. (Hydro-modification Compliance)  Require multi-jurisdictional Wetlands Regulatory Agencies analyses, input and Trustee oversight. Self-inflicted, the protection prescriptions were KNOWN to the City and Applicant. The Project IS appealable to the California Coastal Commission, plus agencies aforementioned by Appellant to be notified.

Time To Build  Time to build a SMALLER Project, if the Applicant truly wishes to be a good neighbor. Relocate ALL proposed edifice elements (Administration AND Dual Level Parking Structure) back an additional 15 lineal feet from Monarch Bay Villas property line to create a larger mitigation buffer.  Time to build it in the briefest possible time: 6 Years Maximum without delays, without unjustified respites.  Time to install onsite feasible water quality impairment reducers and habitat protection BMP infrastructure.  Time to keep in place and restore offsite detention basin.  Time to be better stewards of the local environment by integrating into the Project Best Conventional and Best Available Technology (BCTs & BATs) design elements.