Capital Structure, Risk Adjusted Beta and WACC By Binam Ghimire

Slides:



Advertisements
Similar presentations
THE COST OF CAPITAL FOR FOREIGN INVESTMENTS
Advertisements

Cost of Capital Rate of return required by firm’s investors
Copyright: M. S. Humayun1 Financial Management Lecture No. 34 Optimal Capital Structure – Impact of Debt on Firm Value & WACC Graphs.
Goal of the Lecture: Understand how much a business must pay to raise the capital it needs to fund corporate investments.
CHAPTER 13 The Cost of Capital
Factor Model.
Chapter Outline The Cost of Capital: Introduction The Cost of Equity
CAPM and the capital budgeting
Cost of Capital Minggu 10 Lecture Notes.
15-0 Chapter 15: Outline The Cost of Capital: Some Preliminaries The Cost of Equity The Costs of Debt and Preferred Stock The Weighted Average Cost of.
QDai for FEUNL Finanças November 7. QDai for FEUNL Topics covered  CAPM for cost of capital  Estimation of beta.
Optimal Capital Structure The Cost of Capital Approach P.V. Viswanath Based on Damodaran’s Corporate Finance.
FINA 6335 The CAPM and Cost of Capital Lecture 9
Sources of Finance and the Cost of Capital. learning objectives sources of finance equity capital compared with debt capital gearing the weighted average.
Investment Analysis Lecture: 21 Course Code: MBF702.
CHAPTER 9 The Cost of Capital
Why Cost of Capital Is Important
Investment Analysis and Portfolio management
Lecture No. 36 Review of Capital Structure, Leverage, WACC, & Betas
Weighted Average Cost of Capital
Weighted Average Cost of Capital (WACC) Module 6.2 Copyright © 2013 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
FIN 614: Financial Management Larry Schrenk, Instructor.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Lecture No. 50 Chapter 15 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter 12 Cost of Capital 0. Why Cost of Capital is Important Return is commensurate with Risk – always (SML) The cost of capital gives an indication.
Capital budgeting and the capital asset pricing model “Less is more.” – Mies can der Rohe, Architect.
Risk, Cost of Capital, and Capital Budgeting. Valuing a Project When valuing a project you need two things: Initially you were given both (Unit.
(c) 2001 Contemporary Engineering Economics1 Discount Rate to be Used in Project Analysis ECON 320 Engineering Economics Mahmut.
Chapter 9 The Cost of Capital.
Investment Analysis Lecture: 22 Course Code: MBF702.
Cost of Capital Dr Bryan Mills. Risk and Return % return % risk.
Measurement of weighted average cost of capital WACC It is also called as Overall Cost of Capital. Weighted average cost of capital is the expected average.
Advanced Project Evaluation
ACC412 Management Accounting I Module 4 (B) Cost of Capital By:E. P. Enyi, Ph.D, MBA, ACA, FAAFM, RFS, MFP, FIIA Head, Dept of Accounting, Covenant University,
1 Discount Rate to be Used in Project Analysis Lecture No. 24 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
FIN 614: Financial Management Larry Schrenk, Instructor.
© Prentice Hall, Corporate Financial Management 3e Emery Finnerty Stowe Cost of Capital.
Cost of Capital Professor Ronald Miolla. Agenda 1) What is Cost of Capital? 2) How to compute Cost of Capital. 3) Cost of debt. 4) Cost of equity.
Traditional NPV& WACC Modigliani and Miller meet CAPM PWC Course Notes P62 ACCA Paper P4 Also suitable for ICAEW, ICAS, CFA etc mefielding.com1.
Adjusted Present Value Modigliani and Miller meet CAPM PWC Course Notes P62 ACCA Paper P4 Also suitable for ICAEW, ICAS, CFA etc mefielding.com1.
Business Finance (MGT 232)
Li CHAPTER 10 The Cost of Capital Sources of capital Component costs WACC Adjusting for risk.
9-1 CHAPTER 11 The Cost of Capital Sources of capital Component costs WACC.
Strategic Financial Management Lecture 18 Numerical Examples in SFM.
Costs of Capital Weighted Average Cost of Capital (WACC)
Copyright © 2003 Pearson Education, Inc. Slide 10-0 Ch 10 Learning Goals 1.Concept of cost of capital 2.Determine the annual percentage cost of individual.
CHAPTER CHAPTERFIFTEEN Cost of Capital J.D. Han King’s College UWO.
TOPIC: WEIGHTED AVERAGE COST OF CAPITAL (WACC) Firm Value should be Maximized when WACC is Minimized Factors that impact on WACC include operating profitability,
CHAPTER SIXTEEN Capital Structure By J.D. Han. Evaluation of Capital Structures A capital structure that maximizes share prices generally will minimize.
1 Global Cost of Capital and Financial Structure International Financial Management Dr. A. DeMaskey.
1 The Cost of Capital Corporate Finance Dr. A. DeMaskey.
FIN 350: lecture 9 Risk, returns and WACC CAPM and the capital budgeting.
Why Cost of Capital? – Overall Cost of Capital of the Firm – Investment Proposal- Accept /Reject – Capital Structure – Yardstick to measure the worth of.
1 CHAPTER 10 The Cost of Capital. 2 Topics in Chapter 10 Individual sources of capital and their cost WACC.
F9 Financial Management. 2 Designed to give you the knowledge and application of: Section F: Estimating the cost of equity F1. Sources of finance and.
Capital Markets 2006 CEMEX´s Discount Rate Factor Analysis.
F9 Financial Management. 2 Section F: Cost of Capital Designed to give you the knowledge and application of: F1. Sources of finance and their short-term.
RISK, COST OF CAPITAL, AND CAPITAL BUDGETING This topic applies the concept of NPV to risky cash flows. NPV = C o + Σ C t ¯ /(1+r) t r = discount rate.
Paper F9 Financial Management
Amity Business School Amity School Of Business BBA Semister four Financial Management-II Ashish Samarpit Noel.
Chapter 13 Learning Objectives
Cost of Equity (Ke).
VANDELAY INDUSTRIES WACC EXAMPLE.
CHAPTER 9 Estimating The Cost of Capital
Financial Implication of strategic investment decisions
M&M Proposition II Without taxes & bankruptcy costs
The composition of long-term finance used by the firm
THE COST OF CAPITAL FOR FOREIGN INVESTMENTS
Case 1- Marriott Corporation:
Financial Implication of strategic management decisions
Presentation transcript:

Capital Structure, Risk Adjusted Beta and WACC By Binam Ghimire

MV of a company: Meaning Market Value of a Company: Future CashFlows/ WACC If we can decrease WACC by changing the gearing then we can add value to the shareholders wealth

Impact of Gearing Should decrease WACC because Debt is cheaper Should increase WACC because more Debt means more risk to shareholder so increases cost of equity Traditional theory says WACC is U shaped so find optimal point at bottom and keep gearing at that level M&M theory (no tax) says Debt is cheaper but cost of equity rises so WACC is constant. Gearing is irrelevant M&M (with tax) debt is cheaper and greater than the related cost of equity rises. So WACC falls. Get as much debt as possible

CAPM in Project Appraisal: Ungeared company (all equity firm) and CAPM

CAPM in Project Appraisal: Example 1 Toshack plc is an all equity company and has a cost of capital of 17% p.a. A new project has arisen with an estimated beta of 1.3, Rf = 10% and Rm = 20%. Required: What is the required return of the project What relationship does this have to the cost of capital of the company

CAPM in Project Appraisal: Example 2 Johnson plc is an all equity company with a beta of 0.6. It is considering a single year project which requires an outlay now of $2,000 and will generate cash in one year with an expected value of $ 2,500. The project has a beta of 1.3, Rf = 10% and Rm = 18% Required: What is the Johnson’s cost of equity capital? What is the required rate of return of the project? Is the project worthwhile?

CAPM in Project Appraisal: Example 3 Mears Ltd is an all equity company with a beta of 0.9. It is considering a project which has a beta of 1.2. Rf = 7% and equity risk premium = 6%. Calculate the project specific cost of capital.

CAPM in Project Appraisal: Geared company (all equity firm) and CAPM

Introducing Debt finance into CAPM : CAPM can be extended to take gearing When a company is planning to diversify into a different sector The risk of the new sector will be different The job is to calculate the cost of capital which can reflect the risk of the new sector

Betas: In an ungeared company it simply represents the business risk. This is Beta of Asset In a geared company Beta represents both business and other risk associated with debt. This is called Beta of Equity (Business and finance risk) The beta of debt is generally very small so we may ignore it

Get an appropriate Asset Beta (same as a company in that business) Choosing a Beta (Converting the Beta of the company into Beta of the proposed investing sector) : 2 Steps: Get an appropriate Asset Beta (same as a company in that business) Adjust it to your gearing levels. Make it an equity beta

Formula: The assets beta equals weighted average of the betas of the various methods of financing, according to the importance of each source of finance in the capital structure Given the beta of debt is 0 (The debt beta is usually given as nil), the formula (when debt beta not given) can be:

Formula: The beta of equity:

Example 1: A Ltd is planning to diversify by investing into a different market sector. The market sector has an average geared beta of 1.8 and a debt to equity ratio of 2:3. A Ltd. has a geared beta of 1.4 and a debt equity ratio of 1:3. Tax rate is 30%. Calculate the geared beta that A ltd should use when calculating the cost of capital for this project.

Example 2: Confectionary Co. (CC) is considering to move into Theme Park (TP) Business. What is suitable cost of capital? CC: Equity:Debt ratio= 5:2. The debt is risk free and yields 11%. Beta = 1.1. Average Return on Stock Market = 16%. Tax is 30% TP Ltd. Equity: Debt = 2:1, Beta = 1.59

Solution (Example 2): Degear the Equity Beta of the co. doing same business 1.59 * [2/ (2+1*(1-0.3)] = 1.18 Regear your Asset Beta 1.18 = ? X 5/ (5+1.4) =1.51 Cost of Equity: Risk Free + Beta x Market premium or : 11% + 1.51 (16-11) = 18.55% Cost of Debt = 11 * 70% = 7.7% WACC = 18.55% x 5/7 + 7.7 % x 2/7=15.45 %

CAPM in Project Appraisal: Example 1 Toshack plc is an all equity company and has a cost of capital of 17% p.a. A new project has arisen with an estimated beta of 1.3, Rf = 10% and Rm = 20%. Required: What is the required return of the project What relationship does this have to the cost of capital of the company Required rate of return: Ks = Rf + b (Rm-Rf) = 10% + 1.3 x (20 - 10)% = 10% + 1.3 x 10% = 10% + 11.3 % = 21.3% (This has no relationship with the cost of capital (17%) of the company)

CAPM in Project Appraisal: Example 2 Johnson plc is an all equity company with a beta of 0.6. It is considering a single year project which requires an outlay now of $2,000 and will generate cash in one year with an expected value of $ 2,500. The project has a beta of 1.3, Rf = 10% and Rm = 18% Required: What is the Johnson’s cost of equity capital? What is the required rate of return of the project? Is the project worthwhile? Johnson’s Ks= 10% + 0.6 x (18-10)% = 10% + 0.6 x 8% =10% + 4.8% = 14.8%

CAPM in Project Appraisal: Example 2 The required rate of return of the project? Ks= 10% + 1.3 x (18-10)% = 10% + 1.3 x 8% =10% + 10.4% = 20.4% The return = 100 * [2500 – 2000)/ 2000] = 25% The project is attractive because return (25%)>Cost (20.4%)

CAPM in Project Appraisal: Example 3 Mears Ltd is an all equity company with a beta of 0.9. It is considering a project which has a beta of 1.2. Rf = 7% and equity risk premium = 6%. Calculate the project specific cost of capital. Ks = 7% + 1.2 x 6% = 7%+7.2% = 14.2%