EL SCADA Components Rad Tests Radiation Resistance Tests of EL SCADA components typically installed in US/UJ/RE G. Burdet, EN/EL/CO, 24 August 2010.

Slides:



Advertisements
Similar presentations
Moxa Embedded Solution on IEC 61850
Advertisements

Remote Monitoring and Control System
Wireless Controllers. Building block for remote control & alarming Functions Local control Measurement SMS alarming Remote control via SMS Data transmission.
Static Transfer Switch
Model H Free Standing Static Transfer Switch. Why choose a model H static transfer switch? Increases power availability. True solid state. Rugged, reliable.
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
Supervisory Control & Data Acquisition DAQ Networking.
Model B1 19-inch Rack Static Transfer Switch. Why choose a model B1 static transfer switch? Increases power availability. True solid state. Rugged, reliable.
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
Multi Functional Digital Fault Recorder
Efficient Management for Building Automation. Market Trend.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
PICNIC Demo Module 2 IP-based utility outlets 陳育瑋、方煒 台大生機系.
12-Port IP Power Manager IPM  Product Overview  Product Features  Applications  Comparison Presentation Outline 2 / 15.
EUT 1040 Lecture 10: Programmable Logic Controllers.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
File/ 1 Primary colours Secondary colours Remember to change file name 28pt Ariel bold 18pt Ariel bold l Distributed PID Control and I/O What is.
An Introduction to SCADA Fundamentals and Implementation Supervisory Control And Data Acquisition.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
DP Cabinet.
Slide 1 / 35 P&T - GPS - Training PhB - 01_TECH_TeSys_U_controller_ en 06/2004 Presentation of the range Composition of the controller  Control base 
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
EL SCADA Components Rad Tests EL SCADA components Radiation Resistance Tests Typical US/RE system components.
Substation Automation
An Introduction to SCADA Fundamentals and Implementation
SCADA and Telemetry Presented By:.
G4 Control and Management Solution for Data- Centers and Computer Rooms.
Mini8 Multi-loop Controller. 2 Eurotherm Business Group Mini 8 – What is it? Multi-loop(4,8,16) PID controller 8-32 Channel data acquisition Design targeted.
G650 Generator Protection & Control System
Arctic Control Introduction V 1.0. Arctic Control The Arctic Control is a device with integrated wireless communications for controlling medium-voltage.
Looking for a more powerful circuit monitor?
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
POWER PLANT USED IN TELECOM
Smart transmitters.
Confidential / Property of Danfoss Drives A/S DKDD-SMC 1 Drives Division Danfoss presents - VLT ® 2800 Series.
Schutzvermerk nach DIN 34 beachten XC200 Hardware Overview.
DUAL POWER SUPPLY MODULE
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
December 2002 Endos DC has been designed from scratch. Every component of the system is completely new: –new generator –new tubehead –new arm –new timer.
Modular Inverter.
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
Hardware Training Product: ITMS2.
Excom ® Remote I/O in Zone 1. excom ® excom ® One system for all requirements in Zone 1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Programmable Logic Controller (PLC)
Photovoltaic Power System Monitor Josh Stone Ryan Mann Art Barnes Austin Fisher.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
DIGITAL MULTIMETER DMG
Electrical Configuration and System Protection
IP-based 8-port Switched Power Manager
Maintain, Manage And Monitor Outdoor Systems Remotely
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
Programmable Logic Controllers: I/O
SCADA for Remote Industrial Plant
2500 Series® Compact System Components
EN/EL Tests in H4IRRAD October to 7 November
2500 Series® Compact System Components
ACOE347 – Data Acquisition and Automation Systems
PM9, PM9P and PM9C Power Meter
Presentation transcript:

EL SCADA Components Rad Tests Radiation Resistance Tests of EL SCADA components typically installed in US/UJ/RE G. Burdet, EN/EL/CO, 24 August 2010

Typical US/UJ/RE installation: RTU (Remote Terminal Unit, 30 units underground) DAU (Data Acquisition Unit, 56 units underground) Adapters/Converters RS232/RS485 Ethernet Switch (30 units underground) 48/24VDC Power Converter Pt100/20mA Converter Frequency/20mA Converter From Electrical Equipment: IED (Intelligent Electrical Devices) Electrical Measurement module from Low Voltage Switchboards Voltage Monitoring Relay Not included: UPS, Battery Chargers, Inverters, Breakers, etc. EL SCADA Components Rad Tests G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests RTU Composition –URT500 from EFACEC –Based on an Advantech SBC (Single Board Computer) –Processor, Dynamic RAM, etc. –Compact Flash Memory –Power Supply module –Switch mode converter –From 48VDC –(Power cycle by Remote Reboot ) G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests DAU Boards G. Burdet, EN/EL/CO, 24 August 2010 MAP3200 DAU processor & Communication MAP Inputs 48VDC Isolated 1mS time stamping MAP outputs Double relays Pulse mode MAP analogues inputs 0/20mA isolated 12 bits ADC Prometheus Processor Board

EL SCADA Components Rad Tests Converters –Power Supply converter –48/24VDC, 2A from ELECDAN –Media converter/adapter –Ethernet switch, MOXA EDS308 (some EDS316) –RS232/485 adapter, ADAM4520 from Advantech –Signal converter –Pt100 sensor, ADAM3013 from Advantech –Frequency converter, from ELECDAN G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests External components Electrical Measurement Units: DIRIS CM V2 from SOCOMEC Used in UA/RR Switchboards DIRIS Ap from SOCOMEC General Services switchboards Discontinued DIRIS A40/41 from SOCOMEC New model, replaces model Ap Voltage Monitoring Relay Monitors 3 phases presence, order, balance G. Burdet, EN/EL/CO, 24 August 2010

Power Supply 230/48VDC 6Amp EN/EL Power Supply 230/48VDC 6Amp EN/EL Ethernet TN IT/CS Ethernet TN IT/CS Remote Reboot BE/CO Remote Reboot BE/CO RR 230VAC 48VDC Jbus/RS485 Win3200/RS /TCP/IP Remote Desktop Connexion Power Cycle 24VDC RTU CLP500E DAU MAP3200 MAP3020/50/80 DAU MAP3200 MAP3020/50/80 ADAM 4520 RS232/RS485 ADAM 4520 RS232/RS485 ELECDAN Counters ELECDAN Counters ELECDAN Pt100 ELECDAN Pt100 ELECDAN Converter 48/24VDC ELECDAN Converter 48/24VDC Switch SPHINX EDS308 Switch SPHINX EDS308 Power Supply 400VAC Voltage & 1Amp Current Power Supply 400VAC Voltage & 1Amp Current 34kHz Generator EN/EL 34kHz Generator EN/EL 230VAC Web Browser to Embedded Web Server (HMI500) Integrated to EL SCADA IEC EL/CO EL/BT G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests ACKERMAN Pt100 LAN Ethernet LAN Serial MAP3200 Serial RS232 Câbles MAP3020/3050/ VDC Supply Ethernet TN 48/24VDC Remote Reboot Relay Cycle Power via DAU Relay Remote Reboot Relay Signals cabling Powering cabling G. Burdet, EN/EL/CO, 24 August 2010 ADAM4520 ADAM3013 ELECDAN DAU EFACEC with MAP3200 CPU/Communication MAP inputs 48V, Time stamping 1mS MAP outputs, double relays, pulse MAP analogues inputs, 20mA isolated Cycle Power via DAU Relay RTU DAU

EL SCADA Components Rad Tests Signals System A System B System C Each system has 3 Dig Out, read by 3 Systems 3 Temperature sensors acquired by the 3 systems Ackerman Battery measurements (voltage & current) simulated by 2 LF Generator (34,125kHz nominal) Frequency acquired by the 3 systems BE/Co Remote Reboot to each RTU & DAU Internal Power Cycle through DAU for 24VDC - Switch - ADAM ADAM3013 & Frequency converter - Cycle DIRIS supply to be added Each System communicates with 3 IED (DIRIS) - collect 400V voltages (3 phases) - external 1 Amp/3 phases current generator - collect the Voltage Relay signals - collect the Auxiliary Relay status - controlled via DAU, generates single Phase Failure Extra fan, controlled by each RTU System G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests Logic System A System B System C RTU Level: Embedded FUNG SW, permitting logic, timers, calculation, connection - Cyclic activation of 3 output relays, collected back by inputs -Cyclic activation of Auxiliary Relay within DIRIS crates: - Generates phase missing - Detected by the Voltage Relay - Transmitted by Communication - Activate fans in case of over-temperature from sensors SCADA Level: Permanent monitoring with Alarms generation in case of: - Loss of RTU communication (plus & SMS) - Loss of DAU communication - Measurements out of range - Loss of IED communication - Measurements out of range - Cyclically activated Inputs frozen G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests Remote Access RTU Level: Remote Desktop Connection: Windows service, one session - Events & System logs - Entity viewer (mode list) - Activate Controls Web Server: maximum 4 sessions - Alarm list - Event logs - System logs - Trends - Controls SCADA Level: - Alarms - Real Time trends - Historical Trends - Events - Controls - Derived program - & SMS G. Burdet, EN/EL/CO, 24 August 2010

Bay with Supervision elements: #100cm High, #55cm Wide, #75cm Depth #80 kg Crates with LV Switchboards monitoring elements, 19” 3U G. Burdet, EN/EL/CO, 24 August 2010

EL SCADA Components Rad Tests Mechanical design –No extra shielding, Light rack mounting Statistics –3 systems in // –Permanent monitoring via SCADA –Human daily check Costs –Components: 25kEuro –Work: 2000CHF Conditions –Activated material –Not repairable (?) –Not re-usable (?) Schedule –CNGS TSG46 –LHC TS End August 2010 (11 weeks run) G. Burdet, EN/EL/CO, 24 August 2010

HW: RTU URT500E 12 ports, Diskless, Win XP Embedded, 48VDC DAU with MAP3200, MAP3020, MAP3050 & MAP3080 Switch EDS308 from MOXA, dual power supply 24VDC ADAM4520, ADAM3013 from Advantech Frequency converter from ELECDAN 48/24VDC, 2A from ELECDAN SW CLP500 Version HMI500 Web Server FUNG500 for Automatism Win3200 for MAP3200 configuration Access Data Base (RTU & FUNG) Reaction in case of failure (SEE) Remote Reboot RTU level (if RDC & ping failure) DAU level (if IEC-Down & Win 3200 failure) 24VDC convertor (Switch, ADAM4520, ELECDAN convertors) DIRIS module (if Communication or measurements lost) EL SCADA Components Rad Tests

TCV4 230/48V DC TSG46 Station 1Station 2Station 3 48V TSG45 Remote Reboot 7,9m11,4m 8,2m 4,4m 9,2m 11,4m Station 4 17,4 m 6m 2*2,5mm2 RTU Efecngs-1 RTU Efecngs-2 RTU Efecngs-3 DAU ETW001A/CNGS DAU ETW001B/CNGS DAU ETW001C/CNGS LF1 Generator LF2 Generator 6m Coaxial 50Ohm

Ch1 CH2 CH 3 CH4 CH5 CH6 24V Switch A 24V 4520 A 24V 3013 A CH7 CH8 24V Switch B 24V Switch C 24V 4520 B 24V 4520 C 24V 3013 B 24V 3013 C Ch1 CH2 CH 3 CH4 CH5 CH6 CH7 CH8 Ch1 CH2 CH 3 CH4 CH5 CH6 CH7 CH8

R S T E1/E2 E3/E4 E1/E2 E3/E4 E1/E2 E3/E4 Control Aux. Relay 48V Diris Status Volt Relay Jbus/RS485 From/To RTU400V AC