Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools Status for Analog and Digital parts  Tools to test.

Slides:



Advertisements
Similar presentations
Chiche Ronic Caceres Thierry Duarte Olivier
Advertisements

S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France 6 February 2003 Status of SPECS  SPECS-SLAVE architecture I2C implementation JTAG implementation.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France 24 February 2003 News about SPECS system  SPECS system  SPECS-SLAVE chip  SPECS-SLAVE.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
Analog-to-Digital Converters Lecture L11.2 Section 11.3.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools for Analog and Digital parts  Typical acquisition sequence.
David Nelson STAVE Test Electronics July 1, ATLAS STAVE Test Electronics Preliminary V3 Presented by David Nelson.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Preliminary Design of FONT4 Digital ILC Feedback System Hamid Dabiri khah Queen Mary, University of London 30/05/2005.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
December 14, 2006Anuj K. Purwar1 Design proposal for Read Out Card (ROC) Anuj K. Purwar December 14, 2006 Nevis Meeting.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Domino Ring Sampler (DRS) Readout Shift Register
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
09/02/20121 Delay Chip Prototype & SPI interface Joan Mauricio La Salle (URL) 15/02/2013.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 6 Report Wednesday 6 th August 2008 Jack Hickish.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 Lab. 11 Modulation/demodulation with RF module  The system: Digital Analog  a(n)a(n) Filter Digital Digital filter (SRRC) Digital Analog  Filter Digital.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
ZHULANOV Vladimir Budker Institute of Nuclear Physics Novosibirsk, Russia Beijing
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Common Readout Unit (CRU) workshop CERN Mars 2016
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Test Boards Design for LTDB
ETD meeting Electronic design for the barrel : Front end chip and TDC
KRB proposal (Read Board of Kyiv group)
Christophe Beigbeder PID meeting
Status of the Beam Phase and Intensity Monitor for LHCb
Front-end digital Status
Calorimeter Upgrade Meeting - News
Muon Recording Studies and Progress for the MICE Tracker
Christophe Beigbeder/ PID meeting
VELO readout On detector electronics Off detector electronics to DAQ
Analog-to-Digital Converters
Commodity Flash ADC-FPGA Based Electronics for an
Tests Front-end card Status
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools Status for Analog and Digital parts  Tools to test Analog part  Tools to test A3PE FPGA (SSO & SSI)  Conclusion : next steps Caceres Thierry Duarte Olivier

Olivier Duarte / Thierry Caceres Tools to test Analog part LHCb upgrade meeting 2 SPY_FIFO ANALOG_PULSE_ FIFO ClkUSB PATTERN_ FIFO setup_ register[8 ] setup_ register[9 ] setup_register[9] {Add 0x1C} 96 A3PE RDWR RDWR RDWR (96 x 512) (8 x 512) (96 x 512) {Add 0x1F} {Add 0x06} Buffer_FIFOs (12x8) USB wr 0 1 USB_data 8 8 USB data x 12bits 96 8 USB_data bit ADC data from Analog Mezzanine (x8) Analog Pulse ( 1 per ADC Channels) Clk 40 Mhz Wr : USB Rd : USB or 40 Mhz Wr : USB or 40 Mhz Rd : USB Wr : USB Rd : USB or 40 Mhz ADC emulationSPY data Trigger for Analog  FIFO pattern  Generate digital signals  Check FPGA computations  SPY FIFO storage of processing results  ANALOG PULSE FIFO generate trigger of analog pulses February 17th 2011

Olivier Duarte / Thierry Caceres Tools to test A3PE FPGA (SSO & SSI) LHCb upgrade meeting 3 Idea : RAM pattern to test the A3PE IOs functioning by exchanging data between the 2 FPGA (SSO and SSI)  USB Rd / Wr the RAM (To_AX and From_AX).  Start / Stop and latency (implemented !) Sequence:  To_AX _RAM Rd/Wr by USB  Start commande  Loop on to AX_RAM until stop command  Programmable latency to capture data from To_AX_RAM to FROM_AX_RAM February 17th 2011 From_AX_ RAM A3PE CLK_1 ClkUSB To_AX_RAM setup_register[10 ] 32 setup_register[11 ] RegUSB 32 _q3 AX500 setup_register[11 ] 32 BUSLSB AXTOA3PE BUSMSB AXTOA3PE 32 _q2 _q_q1 {Add 0x1D} (32 x 512) {Add 0x1E} (32 x 512 ) Rd Wr Buffer_FIFOs USB_data 32 8 USB_data 8 32 USB_data 8 32 Wr Rd Wr : USB Rd : USB or Clk_1 Wr : USB or Clk_1 Rd : USB From Delay Chip Ctrl. Wr / Rd pattern

Olivier Duarte / Thierry Caceres Start Stop Latency sequence LHCb upgrade meeting 4 February 17th 2011 Tunable latency START SEQ LATENCY Rd To AX RAM 512 words writed Wr From AX RAM STOP SEQ START / STOP / LATENCY SEQUENCE From_AX_ RAM A3PE CLK_1 ClkUSB To_AX_RAM setup_register[10 ] 32 setup_register[11 ] RegUSB 32 _q3 AX500 setup_register[11 ] 32 BUSLSB AXTOA3PE BUSMSB AXTOA3PE 32 _q2 _q_q1 {Add 0x1D} (32 x 512) {Add 0x1E} (32 x 512 ) Rd Wr Buffer_FIFOs USB_data 32 8 USB_data 8 32 USB_data 8 32 Wr Rd Wr : USB Rd : USB or Clk_1 Wr : USB or Clk_1 Rd : USB From Delay Chip Ctrl. Wr / Rd pattern Status:  Firmware implemented  Cycle ok  To debug :  Rd / Wr RAM  FPGA Download  Started tests of the third board Loop

Olivier Duarte / Thierry Caceres Conclusion LHCb upgrade meeting 5  Digital electronic is ok, several adjustment have been done.  Last adjustment of the tools to test A3PE FPGA (SSO & SSI).  Started tests of third mother digital board.  Should we considered a 8 channels prototype FEB for the beginning of 2013 with GBT (availability of the first GBT samples) ?  Common tests in Barcelona ? February 17th 2011

Olivier Duarte / Thierry Caceres LHCb upgrade meeting 6 SPARE February 17th 2011

Olivier Duarte / Thierry Caceres Reminder : Typical acquisition sequence LHCb upgrade meeting 7 February 17th 2011 Write Acq Register (PC) Beginning L0 sequence Time Discret Time Beginning latency delay End of latency delay 123 Recording data in RAM (512 points) FIFO full Data readout by USB 25 ns to 65,5µs Trigger Generator  PC write start sequence bit of Acquisition (Acq) Register.  Beginning of L0 sequence.  Each trigger pulse involve pulse shape.  At the end of the latency delay recording 512 points of data (Max).  At the end of the record the system write one “end of acquisition”bit in the Acq_Register.  The PC scrutinize the Acq_Register, when the “end of acquisition” is high the PC download data with the USB interface. Write Data Ctrl

Olivier Duarte / Thierry Caceres Clock tree LHCb upgrade meeting 8 February 17th 2011