Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
3D Micromanufacturing Lab. School of Mechatronics Gwangju Institute of Science and Technology 3D Micromanufacturing Lab. School of Mechatronics Gwangju.
Camera Link Communication Interface for Vision Applications J. Egri 6/7/05.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
R&D on pixel sensors at ILC ILC Workshop - November 2006 – Valencia.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Servo Motor Control Demonstration.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Servo Motor Control Demonstration. EML 2023 Department of Mechanical and Aerospace Engineering motor with gear reducer flex coupling incremental optical.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Hardware Introduction – Standard vs Q.i
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
09/02/20121 Delay Chip Prototype & Delay Chip Test Board Joan Mauricio – Xavier Ondoño La Salle (URL) 12/04/2013.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
1 Test Setups for the FE-I4 Integrated Circuit Stewart Koppell 8/1/2010.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Control for CTP and LTU boards in Run
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Digital Acquisition: State of the Art and future prospects
LHCb Outer Tracker Electronics 40MHz Upgrade
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Calorimeter Mu2e Development electronics Front-end Review
Production Firmware - status Components TOTFED - status
Baby MIND Collaboration Meeting #2
Front-end digital Status
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
PERSPECTIVE ON MICROWAVE MONITOR AND CONTROL INTERFACES
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production, testing and reliability

Integrated test environment for a part of the LHCb calorimeter P RESENTATION O UTLINE Introduction Real environment Former test boards Final test board –Test capabilities –Features Conclusions 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 2

Introduction LHCb calorimeter Future testing needs –Reparation needs –Non expert tests –Integration –Usability No need of full laboratory Stability (Software but also Mechanical, loose wires,...) –Kaizen (Continued Improvement) –Product continuity (FPGA) 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 3

Real Environment LHCb calorimeter: –Power Supply –Clock distribution –Trigger data flow –DAQ data flow 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 4 Scintillator Pads VFE Clock & Control Regulator Board Power Preshower F.E. Board Data Control Control Board Selection Board Multiplicity SPECS Clock Data Ch-B Charged Particle

Real Environment Data from VFE to PSFEB is composed by 4 LVDS serializers of 21b at 840Mbps each one. Data from 7 PSFEB to a single CB is 7*840Mbps. Data from CB to SB is about 1,2Gbps of payload with an optical link. Control has I2C bidirectional control as well as a serial synchronous 40MHz channel for time sensitive controls. Huge amount of data flows through the system 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 5

Former test boards FPGA Baseline –Originally Parallax Board with Stratix EP1S25F672C6 Nice solution for prototyping & tests (Discontinued by vendor) Good form factor –Extended design done by our group Same philosophy USB instead of RS232, usable not only for programming. Aprox. Double of pins Backwards compatible More powerful Stratix II EP2S60F484C5 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 6

Former test boards Control Board Data from the backplane (PSFEB -> CB) SPECS from the backplane Optical Link Receiver USB interface with a mezzanine by Bitwise Systems 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 7

Former test boards Very Front End –Digital Part PreShower Front End Board reception Control of the VFE can be driven from the Control Board or from test board Connection through real LDVS cable ensures maximum realism USB interface with a mezzanine by Bitwise Systems Can also work with the Photo Multiplier test environment to test the analogical part 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 8

Former test boards Very Front End –Analogical Part High voltage power supply for the PMTs Dark box to test with controlled light Motorized optical fiber emits pulsed light on the desired channel of the PMT Also diffuse pulsed light is available Motor control is done by a computer while triggering of light pulses is done by the VFE’s test board that also collects the resulting data 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 9

Former test boards Link supervision –Clock distribution very important for our system, it defines integration time. Must be easily checkable. –Communication between the VFE/RB and the CB is done by an ad-hoc I2C with only two pairs. Focus of doubts, also tested. –Able to supervise signal shapes and communications. –Able to substitute a VFE and view what would it receive. –Able to check relative phases of the 8 clocks available on a CB. 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 10

Former test boards Mixing real detector with “emulated” parts –Test for the data cabling with LVDS pattern With real datapath With test board instead of PSFEB –Test for analogical noise and offset With real datapath With test board instead of PSFEB –Test for the control cabling With real datapath With test board instead of CB With scope –All of them very useful to isolate problems and try to solve them. 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 11

Final test board USB Ethernet WiFi LVDS Data Control Cables Optical Power PMTs env. Spy 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 12

Final test board –Test capabilities 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 13 Test Control Board VFE PMT Test

Final test board Features –Mechanical resistance One must not expect careful manipulation by an average user. Old one had clear mechanical flaws. Common in systems designed during prototyping tests. (Loose wires,...) 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 14

Final test board Mechanical resistance 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 15 −21 screws, 10mm aluminium plate −Good fixation of optical link −Good fixation of LVDS cable

Final test board Less laboratory dependant –Power –Clock –Scope –Special SW on PC Now: –Clock generator –Power Regulator –No SW needed* 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 16

Final test board Better interface: – USB –Ethernet/WiFi (compatible with various models with integrated web server) Portable: –O.S. Independent (No drivers) –No applications –Always Updated software Usable: –Remotely operated (expert at home, ALARA reasons, etc) 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 17

Conclusions –Ready for future tests and reparations –System suitable for average user Usable Stable Intended for average user –Better interface Ethernet is a great advantage –More test possibilities New data paths not available before –Less lab dependant –Solved problems learned by using testing boards 22/9/2009Parallel session B2a - Production, testing and reliabilitySlide 18