© Joint Commission Resources Module 2 The Re-designed Discharge Process: Patient Admission and Care/Treatment Education Faculty from Joint Commission Resources.

Slides:



Advertisements
Similar presentations
Real Time Abstraction A Multidisciplinary Approach
Advertisements

Module 2 The Re-Designed Discharge Process: Patient Admission and Care and Treatment Education Module 2 The Re-Designed Discharge Process: Patient.
Health Literacy and use of Teach-Back for patient education
+ HEALTH INSURANCE: UNDERSTANDING YOUR COVERAGE Navigator Name Blank County Extension UGA Health Navigators.
Re-Engineered Discharge
Palliative Care Clinical Care Programme
©2013 MFMER | slide-1 Advancing Health Literacy of Transplant Patients and Caregivers Julia G Behrenbeck, MS, MPH, RN, Rachel F Carroll MAE, BAS, William.
Learn. Act. Improve. Spread. Keep the Drum Beat Going. 1 Preventing Avoidable Readmission Together Using Project Re-engineering Discharge PROJECT RED.
PAVE Project Status Report November 16, Innovative Regional Solutions Reduce Readmission Rates by 10% Increase Patient & Family Engagement Improve.
©2011 Walgreen Co. All rights reserved. Georgia Hospital Association Reducing Readmission Learning Collaborative November 7, 2012.
Faculty from Joint Commission Resources Deborah M. Nadzam, PhD, FAAN
2.11 Conduct Medication Management University Medical Center Health System Lubbock, TX Jason Mills, PharmD, RPh Assistant Director of Pharmacy.
Care Coordination Program for Heart Failure Susan Levine RN Director Clinical Resource Management Carolyn Timmons BSN,RN Lead Clinical Care Coordinator.
Questions or comments on this presentation can be addressed to You can pick and choose the elements.
Heal Teach Discover Serve Geisinger Value 1 Transitions of Care/Personal Health Navigator January 31, 2009.
Documentation To Write or Not to Write That Is The Question!
A Model to Reduce Acute Care Readmissions Susan Weber, RN Chief Nursing Officer Angela Venditte, LPN, CMCO Assurance HealthCare.
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Hospital Patient Safety Initiatives: Discharge Planning
Barriers to Care Transitions Each health plan has different forms and different requirements for authorizations Multiple health plan formularies Providers.
Medication History: Keeping our patients safe. How do we get all of the correct details?
Medication Reconciliation : MSNU. Origins of Medication Reconciliation as a Patient Safety strategy The Institute for Healthcare Improvement (IHI) introduced.
Medication Reconciliation Veterans Affairs North Texas Health Care System March 2008.
The Big Puzzle Evolving the Continuum of Care. Agenda Goal Pre Acute Care Intra Hospital Care Post Hospital Care Grading the Value of Post Acute Providers.
Sutter Care Coordination Program (SCCP) Supporting Patients and Practitioners in Optimizing Health.
Quality Improvement Prepeared By Dr: Manal Moussa.
Wentworth-Douglass Hospital Story Kimberly Chapman, RN, MS, CNL, PCCN Discharge Advocate for Project RED Wentworth-Douglass Hospital Dover, NH Monique.
Care Coordination What is it? How Do We Get Started?
Discharge planning – reducing admissions/re- admissions Jo Clarke, CPPE tutor 1.
Heart Failure Core Measures GMEC QI Presentation.
This product was developed by Florida’s Positive Behavior Support Project through University of South Florida, Louis de la Parte Florida Mental Health.
Safe Transitions Of Care STOC 2011 MHA Pilot- 4Q 2010 Transition responsibility belongs to the sending clinician/organization, until the receiving practitioners.
Preparing to Redesign Your Discharge Program
Community-Based Care Transitions Program
© Joint Commission Resources Reducing Hospital Readmissions Deborah Morris Nadzam, PhD, BB, FAAN Project Director AHRQ and CMS Contracts Joint Commission.
Project RED The Re-Engineered Discharge JCR’s AHRQ-funded Project Florida Hospital Association June 4, 2010 Deborah M. Nadzam, PhD, FAAN Project Director.
CMS National Conference on Care Transitions December 3,
Module 3 The Re-Designed Discharge Process: Patient Discharge and Follow-up Care.
Transitions in Care Program
© Joint Commission Resources Module 4 Re-Engineering Patient Discharge: The Hospital Launch! Faculty from Joint Commission Resources Deborah M. Nadzam,
Copyright © 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 9 Continuity of Care.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Project RED The Re-Engineered Discharge JCR’s AHRQ-funded Project August 2010 Deborah Nadzam Susan Whitehurst.
A partnership of the Healthcare Association of New York State and the Greater New York Hospital Association NYSPFP Preventable Readmissions Pilot Project.
Care Management 101 Governor's Office of Health Care Reform October 28, 2010 Cathy Gorski, RN, BS, CCM.
Hospital Story Kristen van Bergen-Buteau, CPHQ Assistant Director, Quality Services Littleton Regional Hospital New Hampshire.
School of Health Sciences Week 4! AHIMA Practice Brief Fundamentals of Health Information HI 140 Instructor: Alisa Hayes, MSA, RHIA, CCRC.
Chapter 17 Documenting, Reporting, and Conferring.
Communicating the value of the work and the role of caregiver is essential. A caring team works together to promote harmony and healing among themselves.
Quality Improvement and Care Transitions in a Medical Home Maryland Learning Collaborative May 21, 2014 Stephanie Garrity, M.S., Cecil County Health Officer.
MiPCT Embedded Case management Barriers to developing an embedded Case Management program.
Learning Outcomes Discuss current trends and issues in health care and nursing. Describe the essential elements of quality and safety in nursing and their.
Best Practices in Readmissions Susie Payne, RN MSHA Director Resource Management Clearview Regional Medical Center.
MiPCT Launch Tier 1 and Tier 2 Mary Ellen Benzik,MD Associate Medical Director MiPCT.
The Implementation of Medication Reconciliation in PAC Enhancing Patient Safety The Implementation of Medication Reconciliation in PAC Enhancing Patient.
Discharge Summaries.  Discharge Summaries –Can be challenging  What happens during a hospital course is now more complex and more detailed than in the.
Readmissions Driver Diagram OHA HEN 2.0. Readmissions AIMPrimary Drivers Secondary DriversChange Ideas Reduce Readmissions Identify patients at high-risk.
Transforming Care in Patient Centered Medical Home and Accountable Care Organization Hae Mi Choe, PharmD Director, Pharmacy Innovations & Partnerships.
© Joint Commission Resources Project RED Re-Engineering Discharge Faculty from Joint Commission Resources Deborah M. Nadzam, PhD, BB, FAAN Susan Whitehurst,
NSTEMI Pathway Education for Nurses. Objectives Demonstrate an understanding of the NSTEMI clinical pathway. Understand the importance of early and consistent.
Michela C.C. Fiori, Pharm.D. PGY1 Pharmacy Resident, Penobscot Community Health Care Outcomes of a Pharmacist-Driven Education Program For Residents Discharged.
Teach-back Method for Patient Education Tracy Grant Viterbo University.
1 A Collaborative Approach to Transition Management.
Documentation in Practice Dept. of Clinical Pharmacy.
Partnership for Patients: Readmission Reduction Presented by: Rachel Cicerchi, MPH Program Manager, Texas Center for Quality & Patient Safety Texas Hospital.
MHA Immersion Pilot Project
Medication Reconciliation ROP Compliance
Cook Children’s Medical Center Readmissions Update
Investing in good health at work
Optum’s Role in Mycare Ohio
Presentation transcript:

© Joint Commission Resources Module 2 The Re-designed Discharge Process: Patient Admission and Care/Treatment Education Faculty from Joint Commission Resources Deborah M. Nadzam, PhD, FAAN Project Director And Kathleen Lauwers, RN, MSN Consultant

© Joint Commission Resources Accomplishments to Date  Project Charter initiated  Primary Care Practitioner referral base defined  Process map of current discharge process completed  Care plan structure is finalized: template, location, how Discharge Advocate (D.A.) will access it  Dates for training frontline staff set

© Joint Commission Resources Objectives of Module 2  Review discharge planning activities that begin on admission  Develop plan for identifying targeted patients on admission  Review D.A.’s initial contact with patient  Define role of multidisciplinary team members in discharge planning  Confirm process for creating patient care plan

© Joint Commission Resources Module 2 Outline  Principles and Components of Project RED  Current Discharge Process and Suggested Project Metrics  Patient Admission  Care and Treatment Education  Patient Care Plan: Structure and Process for Completing

© Joint Commission Resources Let’s Review the Principles of Project RED...

© Joint Commission Resources Principles of the Re-Engineered Hospital Discharge 1.Explicit delineation of roles and responsibilities 2.Discharge process initiation upon admission 3.Patient education throughout hospitalization 4.Timely accurate information flow: From PCP ► Among Hospital team ► Back to PCP 5.Complete patient discharge summary prior to discharge

© Joint Commission Resources Principles of the Re-Engineered Hospital Discharge (continued) 6.Comprehensive written discharge plan provided to patient prior to discharge 7.Discharge information in patient’s language and literacy level 8.Reinforcement of plan with patient after discharge 9.Availability of case management staff outside of limited daytime hours 10.Continuous quality improvement of discharge processes

© Joint Commission Resources Module 2

© Joint Commission Resources Discharge Planning Patient Admission H & P Rx Plan PATIENT EDUCATION Discharge Order Written Discharge Process Dischar ge Event DISCHARGE INSTRUCTIONS Post-D/C Follow- up

© Joint Commission Resources RED Checklist: Admission and Care/Treatment Education Eleven mutually reinforcing components: 1. Medication reconciliation 2. Reconcile discharge plan with national guidelines 3. Follow-up appointments 4. Outstanding tests 5. Post-discharge services 6. Written discharge plan 7. What to do if problem arises 8. Patient education 9. Assess patient understanding 10. Discharge summary sent to PCP 11.Telephone reinforcement Adopted by National Quality Forum as one of 30 US "Safe Practices" (SP-15)

© Joint Commission Resources

Outcome metrics for target population  Average length of stay  30 day unplanned ‘all cause’ readmission rate  Pre and post data -Patient experience related to discharge preparation  Pre and Post data -Front line staff survey related to discharge preparation  Pre and Post data – PCP survey related to discharge preparation

© Joint Commission Resources Financial Metrics  The cost of second LOS (readmission)  Project costs  Discharge process costs (current and redesigned)

© Joint Commission Resources Process Metrics  Average time to notify DA about new admission  Average time from admission to first patient visit by DA (initiation of care plan) – only for patients who meet all criteria  Percent of patients PCP notified within 24 hours discharge  Percent of Follow-Up phone calls made within 48 hours

© Joint Commission Resources Process Metrics  Percent of Follow-up calls requiring second call by pharmacist (if non-pharmacist makes first call).  Percent of patients completing post- discharge survey (30 days after discharge)

© Joint Commission Resources Process Metrics  Completion of care plan details: –% of care plans with medication list included –% of care plans with care needs included (e.g., exercise, diet, main problem, when do I call doctor) –% of care plans with follow up appointments listed –% of care plans with pre-arranged discharge resources identified (e.g., home care, DME) –% of care plans with pending tests listed

© Joint Commission Resources Let us pause now… As a team, answer the following questions:  What metrics do the project team want to use to assess the impact of the re-engineered discharge process?  If you decide to collect the process measure associate with time- related activities, how will that happen?  Will you use the patient phone survey? How?  Will you use the frontline staff survey? How?  Will you use the PCP survey? How?  Will you measure the completeness of the patient care plan?  Who will be responsible for overseeing the measurement activities?

© Joint Commission Resources 11 RED Components Enable Discharge Advocates (D.A.) to:  Prepare patients for hospital discharge  Help patients safely transition from hospital to home  Promote patient self-health management  Support patients after discharge through follow-up phone call

© Joint Commission Resources Identify the Patient  By admission unit  By admitting diagnosis –Heart Failure: How do you identify these patients for core measure processes?  By physician

© Joint Commission Resources Identify the Patient (2)  Who will notify the D.A. of the patient’s admission?  How is the D.A. notified? –Pager? –Phone?  D.A. should be notified within 12 hours, to be able to see patient within 24 hrs of admission

© Joint Commission Resources Secondary Screening by D.A.  D. A. reviews patient’s admission notes  Consider: –Working diagnosis –Language –Likely disposition –Is there a home or cell phone number?  Is patient a candidate for Project RED intervention?

© Joint Commission Resources Sample Log for Tracking Key Dates and Times Red SkeldoniPatient Name Date/Time of Admission 05-05;1300 Date/Time D.A. notified 05-05; 1700 Date/Time of initial D.A. visit with patient 05-06; 1100 Date/Time of daily D.A. visits with patient (note all) 05-07; ; ; 1200 Date/time of discharge 05-09;1400 Date/time care plan faxed to PCP 05-09;1500 Date/time of post-D/C call 05-11; 1600

© Joint Commission Resources Let us pause now… As a team, answer the following questions:  How will you first identify that a newly admitted patient is in the targeted population for this project?  How will the D.A. be notified that a potential Project RED patient has been admitted?  What secondary screening criteria for patient inclusion will the D.A. use to confirm the use of the Project RED intervention with the patient?  How will the D.A. track activities with new patients?

© Joint Commission Resources Meeting the Patient  Review the patient’s admission notes –History and Physical –Medication reconciliation –Preliminary plan of care  Meet the patient and family –Describe D.A. role –Assess concerns, including potential post-D/C needs  Initiate care plan and checklist

© Joint Commission Resources Daily Work of the D.A.  Review progress and nursing notes  Clarify any concerns with health care team  Visit the patient –Review treatment plan (as related to discharge) –Begin educating as appropriate (condition, meds) –Discuss patient’s concerns re: discharge  Continue development of care plan

© Joint Commission Resources Discharge Planning Rounds

© Joint Commission Resources Multidisciplinary Team  Consider daily ‘discharge rounds’ –Medical staff, nursing staff, pharmacy, case mgmt and D.A. –Who will be supportive? –Where might resistance come from?  When is discharge order written? –Was it expected? –Weekend discharge? –Is there a timing expectation (i.e., time from order to ‘out-the-door’)?

© Joint Commission Resources Patient’s Physician  Initiates patient plan of care based on critical pathway  Leads and/or participates in discharge planning rounds  Communicates potential date of discharge  Supports the performance improvement process

© Joint Commission Resources  Provide nursing care as planned  Educate patient/family as usual  Communicate with each other, per usual  Communicate with other members of the health care team, including D.A.  Participate in multidisciplinary rounds, including those that may be specifically focused on discharge planning Nursing Staff

© Joint Commission Resources Pharmacist  Verify physician orders  Reconcile admission meds with meds from home  Collaborate with care team specific to discharge needs  Reconcile meds upon discharge  Assist with patient medication questions

© Joint Commission Resources Case Managers  Post-discharge services  Social work  Utilization review  Financial support

© Joint Commission Resources Other Key Staff  Therapists  Disease management

© Joint Commission Resources Let us pause now… As a team, answer the following questions:  Do you currently address discharge planning in multidisciplinary rounds? –What works well? –What could be improved? –Who participates?  If you do not do the above, why not? –What will it take to implement such rounds? –Who will be supportive? –Where might resistance be encountered?  What are the roles and responsibilities of members of the health care team, as related to discharge planning?

© Joint Commission Resources Teaching the Patient  Assess understanding of reason for admission, condition/diagnosis, and current medications  Begin teaching medications and condition  Use teach-back methods (to be discussed in Module III) –Health literacy –Language –Culture

© Joint Commission Resources A True Story* Public health nurse: “Jill, I see you are taking birth control pills. Tell me how you are taking them” Jill: “Well, some days I take three; some days I don’t take any. On weekends I usually take more.” Public health nurse: “How did your doctor tell you to take them? Jill: “He said these pills were to keep me from getting pregnant when I have sex, so I take them anytime I have sex.” * Graham S and Brookey J

© Joint Commission Resources Ask Me 3*  Created by the Partnership for Clear Health Communication (NPSF)  Three essential questions for patients: –What is my main problem? –What do I need to do? –Why is it important for me to do this? *National Patient Safety Foundation

© Joint Commission Resources Teaching – Tips*  Elicit from patient their symptoms and understanding  Be aware of when teaching new concepts and ensure understanding  Eliminate jargon  System level support using technology: –Provide more robust health education vehicles to help the patient remember –Be proactive during time between visits * Schillinger interview

© Joint Commission Resources Literacy Issues*  Clues that patient has general literacy issues: –Incompletely filled out forms –Frequently missed appointments –Poor compliance –Inability to identify the name, purpose or timing of medication –Not asking any questions –Reaction to written materials “Forgot my glasses- can you read it to me?” “ I will read it at home” * Graham and Brookey

© Joint Commission Resources Health Literacy – Tips*  Avoid medical jargon  Speak slowly  Simple pictures when helpful  Emphasize what the patient should do  Avoid unnecessary information  Welcome questions  Written materials: simple words, short sentences in bulleted format, lots of white space * Graham and Brookey

© Joint Commission Resources Additional Teaching Tips* 1.Use visual aids and illustrations 2.Beware of words with multiple meanings 3.Avoid acronyms and other new words 4.Use idioms carefully 5.Provide a health context for numbers and mathematical concepts 6.Take a pause 7.Be an active listener 8.Address quizzical looks 9.Create a welcoming and supportive environment *

© Joint Commission Resources  Accessing the care plan template  Accessing information for the care plan  Saving individual patient’s care plan  Printing the care plan  Storing the care plan –Permanent part of the patient record? Developing the Patient’s Care Plan

© Joint Commission Resources Accessing the Care Plan Template  IT department involvement –Any interfaces built?  Written instructions for how to access the care plan template  Written description of template sections, including what is entered manually, and what is linked to other hospital systems  Written instructions for how and where to save the patient’s care plan

© Joint Commission Resources Gathering Care Plan Content  Start the care plan on admission and add to it daily –Secure education material about patient’s primary condition –Can begin medication section, based on daily discussions with medical team –Can begin post discharge services section –Identify PCP and add name to care plan

© Joint Commission Resources Module 2: Summary Expected Outcomes  Identify patients who are members of the project’s targeted population  Alert the D.A. about new patient  Screen for final acceptance into project  Initiate discharge planning on admission  Meet the patient (thru team, admission notes and in person!)  Initiate care plan and maintain log of activities  Daily rounds with health care team to plan patient education and post- discharge services  Daily visits to patient  Educate throughout  Continue to add to care plan

© Joint Commission Resources Progression to Module 3 Checklist  Metrics you will use to assess impact ___  Process for identifying candidate patients and notifying D.A. ___  Secondary screening criteria for including patient are confirmed ___  Process for multidisciplinary ‘rounds’ and/or updates on targeted patients ___  Process for accessing care plan ___  Team evaluation of Module 2 ___