Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

DISCLAIMER & INSTRUCTIONS to Class A/B Operators The slide presentation was developed to assist Class A/B Operators with providing Class C training. There.
Presented by: Yasra Adowar Petroleum Industry Regulatory Team
Florida Department of Environmental Protection Hospital/Medical/Infectious Waste Incinerators (HMIWI) Tiffany Miesel & John Glunn Florida DEP, Division.
By Yasra Adowar Petroleum industry Regulatory Team.
Petroleum Equipment Institute
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
ACCA Legislative Conference Underground Storage Tank Compliance
Overview of Meter Proving and Calibration for The influence of vapor on calibration.
SB 490 Amendments to the Kansas Underground Utility Damage Prevention Act Effective January 1, 2003.
Quality Assurance/Quality Control Policy
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Sean O’Brien Associate General Counsel Illinois Criminal Justice Information Authority ICJIA Monthly ARRA Report Webinar.
North American Emission Control Area
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
MassDEP Stage I Vapor Recovery Program
Massachusetts Department of Environmental Protection Drinking Water Program Anita Wolovick MassDEP, Environmental Analyst 2011 Spring Training Information.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
The Color Wheel Claire Heider The Primary Colors.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
Also known as the Storage Tank Act of Which of the following tanks is not a regulated tank? a. An farm underground storage tank (UST) that contains.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
11 Going Above & Beyond in Above Ground Storage Tank Equipment Solutions.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
Enhanced Vapor Recovery Workshop November 9, 1999 Enhanced Vapor Recovery Workshop November 9, 1999 FNew and/or Revised Test Procedures Volumetric Phase.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Overview of 3 rd Party Inspection Program for USTs.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING April 17, 2002.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM NEW OWNERS: HOW TO UPDATE YOUR UST INFORMATION MassDEP, Bureau of Air and Waste.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Edward S. Kubinsky Jr. CROMPCO, LLC
Sump Water Management and Disposal ASTSWMO UST Workshop
UST Inspection Program
RLF-ED Program Webinar
Major Changes Additional Updates
Excess Liability Trust Fund Claims Section (ELTF)
Petroleum Storage Tanks – Program Updates
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Alabama Tools Seminars
2015 Federal UST Regulation Changes
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
Georgia Update Jeff Cown Land Protection Branch
Mike Adhanom, Section Chief, Division of Air Quality
Common Control Self-Declaration form
Temporary Rulemaking for 15A NCAC 02L Section .0400
Julie Woosley, Division of Waste Management
NEW COMPLIANCE REGULATIONS
Periodic Review Reports for 15A NCAC 02N, 02O, and 02P
North American Emission Control Area
Air and Water Management Association Regulatory Conference Symposium
RCRA Updates Larry L. Lamberth Enforcement and Compliance Branch
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Petroleum Storage Tanks – Program Updates
GTEC UST Management & Compliance Assistance Seminar
Presentation transcript:

Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures

Test Notifications and Protocols -Enhanced Vapor Recovery Stage I (State Rule) is required in blue, purple, and red counties (23 counties) -Stage II – red counties -EPA Stage I Rule covers all other counties

Test Notification - Decommissioning Notification using appropriate form – Form has been updated Supply all the information required on the form Test Notifications – Must be submitted Five (5) or more work days prior to the test (Holidays and weekends do not count as work days) – Tests cannot be scheduled during non-working hours - which includes holidays, weekends, and times where the tests that cannot be completed by 4:30 p.m. Bad Test Schedules – Two tests with same start time, one testing crew – Late tests: anything after 1:30 p.m. (Later tests can be scheduled, however, tests must be completed by 4:30 p.m.)

Test Notification - Decommissioning Facility Information Section Date Stage II system is disconnected

Test Notification - Decommissioning Indicate type of test – EVR and Decommissioning tests can be done on the same date.

Test Equipment Accurate and calibrated test equipment Complete test equipment – Readable Flow meter (should note units of measurement) – Readable Pressure Gage (with units of measurement) – Accessible to inspector Pressure Decay – Gauge must be on 2.0” w.c. and nothing more – Count starts when the gauge is on 2.0” w.c. – Readable from the same angle

Test Reports Test Reports must be submitted 30 days after the test. Owners are responsible for report submission. – If submitting the report is not a part of your contract, please make sure the owner knows that they are responsible for submitting it to EPD within 30 days. – EPD will not send a “friendly reminder”. Notice of Violation for not submitting test report within 30 days. Yasra will cover more details on the report form.

Decommissioning Tests Two tests are required – TP-201.3: “Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities” (adopted April 12, 1996) – TP-201.3C: “Determination of Vapor Piping Connections to Underground Storage Tanks (Tie- Tank Test)” (adopted March 17, 1999) Other Stage I Enhanced Vapor Recovery tests can be conducted if facility desires to combine the Decommissioning and EVR tests.

Pressure Decay Test – TP201.3 Pressure Decay test must be conducted first Ensures that the Stage I EVR system has no major leaks Conduct tests per CARB Test Procedure

Tie Tank Test – TP201.3C Primary purpose of test – Ensure that all vent lines are still connected to USTs Secondary purposes – Determine if all gasoline underground storage tanks ullage spaces are manifolded – Ensure that diesel tanks are not manifolded to gasoline tanks