Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.

Slides:



Advertisements
Similar presentations
PETE 411 Well Drilling Lesson 17 Casing Design.
Advertisements

Caskets Cap Openings.
Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
Pneumatic Components & Systems Team 1640 Clem McKown – mentor November 2008.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
N EXUS T YRE P UMP. L IFE IS FULL OF UNEXPECTED RESULTS.
NC State University Department of Materials Science and Engineering1 MSE 440/540: Processing of Metallic Materials Instructors: Yuntian Zhu Office: 308.
 Air! A pneumatic assembly is one that converts energy stored in compressed air to mechanical energy. Electrical Energy Compressed air Mechanical force.
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
Design of Helical spring.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
Tire Pressure Lab. Goal of the Lab Determine the average tire pressure for a passenger vehicle. Measure the contact patch of the tire. Calculate the aspect.
Engineering Analysis Presentation ME 4182 Team: 5 Guys Engineering + 1 Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
SubsystemCost Tanks and Containment$ Camera Positioning$ Pumping System $2, Common Header$ Pressure Control and Measurement$11,
Front Suspension Greg Habiak, Nicole Simon, Joe Vuto.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 20 Air Compressors and Pumps.
Mechanical Engineering Analysis. Material Selection Process WoodStainless Steel HDPEAluminumPTFE Cost Machinability Strength Durability
CDR October 9, 2008 Mike Oertli Jonathan Karnuth Jason Rancier.
Permanent Housing for a Ceramic Oil Filter MIM U702 Capstone Design reNU Design Team Dale Kochevar Kelly Seitz Marco Solia Barrett Straub Matt Whalen MIM.
Team Wrecked Week 9 Deliverables: Engineering Analysis.
Balcrank Products Inc. Air Operated Pump Training Presentation, 2/2007.
What is Fluid Power? Fluid power is energy transmitted and controlled by means of a pressurized fluid, either liquid or gas. The term fluid power applies.
Team Fuzzy Balls presents: The Ball Stinger Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Bending of Cold Worked Mild Steel Due to Different Welding Processes Josh Kelly and Matt Lewis ENGR 45 SRJC Fall ‘05.
Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that.
Part Drawings October 30, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Warlocks 8/5/05 TMU Pneumatics on Robots u Simplified model Compressed Air Tank Geek Safety Glasses 60 lbs Pneumatic Cylinder Whoa! That’s a lot of force.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Ships Service Air System
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant
CheesePot: Engineering Analysis By: James Weglarz.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Engineering Analysis ME 4182 Submitted 6/28/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
P16452 Active Reciprocating Compressor Valve Assembly Team: Negar Salehi, Bob Osborn, Ian Nanney, Keith Leung, Chris Reynolds.
LOS ALAMOS FIRE DEPARTMENT
Team INASAD Members: Jose Medina Joseph Leone Andrew Merk Alex Sanders Michael Fox.
ME 4182 Final Presentation Manual Trash Compactor December 06, 2006 Team Moondogs From Left Elias Krauklis, Mike Widerquist, Chris Culver, Chris Sampson,
P16221 – FSAE Shock Dynamometer Detailed Design Review December 8, 2015.
Problems 1. A large plate is fabricated from a steel alloy that has a plane strain fracture toughness of 82.4MPa√m. If, during service use, the plate is.
Warlocks 8/5/05 TMU FIRST Robotics 101 u Week 1) Gears, Pulleys, Sprockets, Bearings u Week 2) Motors & Controls u Week 3) Pneumatics u Week 4) Materials.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
AfterSalesTraining Welcome to AfterSalesTraining.
1 AIR COMPRESSORS Auto Collision Repair/Refinishing Year One.
P08042: Smoking Machine with Integrated Lung Cast for Particle Deposition of Smoke in the Human Lung Joe LeittenProject Manager Edward Harding Lead Engineer.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Chicago Pneumatic Compressors Company Presentation
Snag Boat Final Presentation
D Gal, 135 PSI Trim One Compressor D Gal, 150 PSI
2K Cold Box Structural Analysis
Modular R.O.V for Sub-Sea Operations
Lakota CAET Team Capstone Design Presentation
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Cymbal Stand Surface Mount Hinge Light Rail Structure Bracket
Equilibrate System upgrade
P07521 BRDF Imaging Platform
MANUFACTURING SERVICES PRESENTATION
SB Packing Automatic Downpuller Power Unit
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Reinforced Concrete Pipe
2 types of scale factor problems
STEEL PLATES.
Servo Pilot SFP-150 to 1500.
Presentation transcript:

Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud

Overview Engineering Analysis Corrected Values Part Drawings Full Assembly Sub-Assembly Container w/ lid Control System (motor, sensors, valves)

Engineering Analysis Deflection of Lid w/ Corner Supports:Deflection of Lid w/ 8 Supports:

Engineering Analysis (Cont’d) Buckles: Total tensile strength must be greater than 600 lb. for N = 2 d= 1/8 in =.125 in F = 600 lbf Therefore, the yield strength of the material must be approx kpsi. Most low alloy steels have yield strengths greater than 50 kpsi.

Part Drawings: Full Assembly

Full Assembly Latch Handle Compressor Pressure Gauge Latch Hook Bleed Valve Pressure Switch Lid Container Pressure Seal Schrader Valve

Part Drawings: Container

Part Drawings: Lid

Part Drawing: Gasket

Part Drawings: Compressor Specifications 120 Volts 3 Amps 1 cfm

Part Drawings: Pressure Release Specifications 3/8” Pipe Size 2 ½” Height 20 psi $8.93

Part Drawings: Pressure Switch Specifications Setpoint Range 6-30 psi Deadband Pressure 2-4 psi Maximum pressure 250 psi $19.80

Part Drawings: Latch Assembly Specifications Zinc Plated Steel 2”-2-1/2” latch distance Length = 3-3/64” Width = 1-7/64” Projection/Thickness 5/8” Hook Assembly

Part Drawings: Schrader Air Valve, Pressure Gauge Specifications: A= 1-5/8” B=C=3/4” Max Pressure= 200 psi Specifications: Pressure Range = 0-60 psi Intervals = 5 psi Dial size = 29/32”

Deliverables Next Week Prototype Review Ongoing Website completely revamped by the MAN