Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012.

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

Market Integration & SoS Updated proposals for SJWS #6 ENTSOG offices – Brussels Stakeholder Joint Working Session – 26 April 2012.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
Course: e-Governance Project Lifecycle Day 1
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
CBA Results Files Filling in the templates. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
CBA Results Files Getting started. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
CBA Results Files Analysing the results. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
The EU internal energy market
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
TYNDP SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP st SJWS 24 January 2012 ENTSOG offices -- Brussels.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Presented to: By: Date: Federal Aviation Administration Automating Project Data Submittals Setting Expectations FAA Airports (AEA) Conference Cameron Bryan,
TYNDP concept SJWS #7 – conclusion on TYNDP concept TYNDP Stakeholder Joint Working Session – 29 May 2012.
TYNDP SJWS #5 Demand & Supply – Infrastructure Projects TYNDP – 5 th SJWS 20 April 2012 ENTSOG offices -- Brussels.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The U.S. natural gas revolution: will Europe be ready in time?
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
Standardisation in the European Statistical System inventory of normative documents and the standard-setting process – results of the ESSnet on Standardisation.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.
European Developments Transmission Workgroup 1 st December 2011.
Production Status Portal -- Confirmation of Concept by David Hill 01 July 2013 Production Status Portal 1.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
European Developments Transmission Workgroup 3 rd May 2012.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
How the PCIs are developed Céline Heidrecheid System Development Business Area Manager TYNDP perspective on project progress Copenhagen – 24 June 2016.
South Region Second Edition
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Gas Regional Investment Plans
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Monitoring of the 3rd PCI list in view of the PCI selection
Enhancing North American Air Quality Management
Work plan of GRI NW for 2011 Three out of four projects are started
Project Manager, EA, the REC
Update on WS3 Activities
Presentation transcript:

Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012

Online questionnaire Streamlined process > For every project submitted to ENTSOG for TYNDP , online questionnaire will be set with previous values as a default setting > Even if answer will remain the same, promoter will have to click-submit the questionnaire > Online form will ease the data process and make it more robust Updated questionnaire > Given past experience, questionnaire will be fine-tuned in order to avoid misunderstanding and lack of clarity 2

Main evolution 3 Project capacity for modelling purpose > Key information required for modelling purpose > Intermediate entry/exit capacity is a requirement for long-haul projects > In case of different options, project promoter should identify the one to be modeled by ENTSOG Project benefits > Questions could be based on Annex IV of the EIP proposal > Promoters could be asked if they will apply for PCI status Project timeline > Mode detailed questions in order to help reader to monitor the evolution of projects from one edition to the other

Project stage outlook 4 Synthetic information on project timeframe > As there is no single timeline for projects and challenging steps often differ, a robust clustering can only be based on FID status > Additional proposal is to provide a synthetic outlook of project steps highlighting: Last completed step Main challenge (is it possible to anticipate such difficulty?) Remaining steps Step 1Step 2Step 3Step 4Step 5Step 6Step 7 Project APlannedFEEDPermittingMarket testFIDConstruction Project BPlannedFEEDPermittingMarket testFIDConstruction Project CPlannedFEEDPermittingFIDConstruction Project DPlannedFEEDPermitting Supply contract FIDConstruction Project EPlannedFEED Supply contract FIDPermittingConstruction

Expected construction load 5 Graphical representation of the effort > Aggregated figures on a 10-year range are not sufficient to express the expected load in term of works > Using the same data as Annex A (Infra. Projects) it is possible to give more visibility based on the construction phase of transmission lines, UGS and LNG Equivalent km

6 Thank You for Your Attention Olivier Lebois, Adviser, System Development ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels T: WWW: