Thomas A. Crane – 2009 Proactive Quality Management System 1 Proactive Quality Management System “A goal without a plan is just a wish.” Thomas A. Crane.

Slides:



Advertisements
Similar presentations
Demystifying 6.
Advertisements

Quality Improvement Level Up Program December 17, 2008.
CI Basics Super Sponsor DMAIC The Value Stream 6σ6σ.
6 SIGMA VS. KAIZEN/LEAN Manufacturing Systems Analysis.
Thomas A. Crane 2010Page 1 Product and/or Process Transfers The goal is uninterrupted customer service.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
Certified Business Process Professional (CBPP®)
Process Mapping. Why Flow Chart? To understand a process or system To (visually) depict all key steps in a process or system To compare existing and ‘ideal’
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
Thomas A. Crane 2010Supplier Quality 1 Supplier Quality 1. Choose the Right Supplier Audit the Supplier’s Business Verify the Supplier’s Capability 2.
Supplier Development Kaizen Implementation Kit
Baldrige National Quality Program 2009 Baldrige National Quality Program The Path to Excellence and Some Path-Building Tools Baldrige National Quality.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
Baldrige Performance Excellence Program | 2015
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
Balanced Scorecard as a Performance Management Tool
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Lean Coaching Principles: using Lean Six Sigma and Coaching to Improve the Quality of Outputs Gail Rowles Alison Pattimore UK Office for National Statistics.
 Backdrop – JIT foundation  Understanding your Business … KPI’s  Value Streams … ‘True North’  Lean Partnerships to drive cost improvement  Design.
Total Quality Management By: Zaipul Anwar Manager, R & D Dept. Business & Advanced Technology Centre UTM.
Overview of Lean Six Sigma
LeanSigma ® Facilitator Training Module 13 – Continuous Improvement.
Barry Murash MBBit Nortel 2007
Lean Training through IMPLEMENTATION THE WORKSmart! DIFFERENCE.
Managing Project Quality
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
ISO9001:2000 & AS9100 System Implementation SENIOR OPERATIONS SSP INC
© 2007 Pearson Education Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 12 Statistically-Based Quality Improvement for Variables.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
 Why is it desirable  Cars Cars  Cars 2 Cars 2  What does quality mean in your organisation?
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Introduction: Throughout history and especially in today’s global economy, companies and agencies are constantly looking for ways to do more and more with.
Cost of Quality - COQ MGMT-5060 Operations Management.
Roberts Tool Company, Inc Strategic Planning Presented at SEA Webex January 10, 2011.
HOW CAN PROFICY SERVE THE ENERGY ISSUE? by Coleman Easterly Feb 2008.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Value Stream Management
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
Nyttige implementeringsværktøjer Praktiske eksempler fra Lean Six Sigma Bo Maach-Møller.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Practical Assessment Project Template
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
The Value Driven Approach
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Project Proposal February, 2012 KRYTERION. Background Kryterion provides world class online Proctoring services through its proprietary software: – WebAssessor.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Chapter 5 Value Stream Mapping. IT-465 Lean Manufacturing2 What is VSM? It is a method of creating a “one page picture” of all of the processes that occur.
UNIT 5.
QUALITY MANAGEMENT SYSTEMS GROUP 7. QUALITY customer’s perceptions of a product/service’s design and how well the design matches the original specifications.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OWNER BY MFG OUTPUTS Incoming Supplier Quality Audits ( Supplier feedback System) Continuous Improvement plans Yields Cycle Time Problems solving as needed.
Product & Process Working Group February 26, 2002.
Quality Management Checklist An essential guide to assist you, the quality expert, in enforcing the standards you expect on a daily basis across the whole.
LESSON 4 Process Improvement – Lean
Practical Assessment Project Template
The DMAIC Method
LEAN SIX SIGMA PROJECT TEMPLATE
Six-Sigma : DMAIC Cycle & Application
Practical Assessment Project Template
Continuous Process Improvement
LEAN SIX SIGMA PROJECT TEMPLATE
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Thomas A. Crane – 2009 Proactive Quality Management System 1 Proactive Quality Management System “A goal without a plan is just a wish.” Thomas A. Crane 612 Orr’s Camp Road Hendersonville, NC Phone: Implementing a Proactive Quality Strategy

Thomas A. Crane – 2009 Proactive Quality Management System 2 Proactive Quality Management System First, make sure the basics are strong. Where you start building an effective Proactive Quality Management System depends on how much you already have in place. If you are just beginning, keep in mind that you will not be able to accomplish everything at once, so you need to concentrate on the essentials. If you have been at it for a while then evaluate where you are and decide which elements of your QMS need strengthening and which elements of a Proactive QMS need to be added. Evaluate your present system for the following and establish or strengthen these elements. Basic key elements:  Well defined quality goals and objectives, communicated to all levels of personnel, and with defined metrics that are reviewed to determine the effectiveness of the QMS.  Quality goals and objectives that are measureable and based on customer requirements, regulatory requirements and internal company requirements.  Corrective/Preventive action system that provides real root cause analysis and methods for evaluating corrective/preventive action’s effectiveness.  An effective method of auditing the QMS at all levels of the organization to determine effectiveness.  Management review of effectiveness of QMS and supporting appropriate actions needed for continuous improvement. These basic elements are enablers for the rest of the QMS. With out these being strong, you will always struggle with the effectiveness of your QMS.

Thomas A. Crane – 2009 Proactive Quality Management System 3 Proactive Quality Management System Next, measure yourself and your suppliers. Make sure that you have a robust Product Design Rationalization process that clearly identifies the customer’s needs and expectations. Begin CTQ flowdown of the critical few CTQs. Technology design reviews with Quality and Manufacturing are essential for successful CTQ flowdown. Measure the Cost of Quality (scrap, material inefficiency, warranty/complaints). PPM and pareto of defects will help identify the areas or processes that cause the greatest issues. This data will help drive continuous improvement. Evaluate your suppliers. Begin with requesting certifications and data for critical CTQs. Track the vendor’s PPM for received materials and measure their responsiveness to corrective action requests. Develop good working relationships with key vendors to encourage use of SPC. These basic measurements will start to identify the sources of your quality issues.

Thomas A. Crane – 2009 Proactive Quality Management System 4 Proactive Quality Management System Use you data to identify where to start continuous improvement projects.. Measure OEE on key equipment/process and pareto the causes of availability, performance, and quality issues. Begin with one or two pieces of equipment as a learning tool and then translate to others. Use Lean value stream maps to begin evaluating non-value added steps and waste in your overall processes. Identifying where you are is essential to developing an effective plan to get where you want to be. Use Six Sigma tools, like DOE and capability studies, to establish your present equipment/process performance. Value added processes can be improved by using Six Sigma to reduce the variation in the process. Establish a change management process with at least basic project tracking. Remember that you can’t change everything at once. If you spread your resources to thin then solutions will come slowly and be less effective.

Thomas A. Crane – 2009 Proactive Quality Management System 5 Proactive Quality Management System Continue to strengthen the basics and expand the use of good Lean/Sigma tools. Continue learning and growing in the use of Lean and Six Sigma tools. Look for opportunities to translate lessons learned and best practices. Give yourself time to get these basics rooted in the daily operation of your business. Once these are well established you can begin expanding their use, improving their effectiveness. Finally, add or improve the other elements of a proactive Quality Management System. (reference: Proactive Quality Strategy)