LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.

Slides:



Advertisements
Similar presentations
Module N° 3 – ICAO SARPs related to safety management
Advertisements

May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
1 Levee Board Consolidation Legislation Southeast Louisiana and Greater New Orleans.
DOTD Red River Valley Assoc Louisiana Levee Meeting Larry Ardoin DOTD Division of Public Works.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
Before Katrina, you had a 1% chance every year of flooding this deep from Hurricanes Notes: The depth map tool is a relative indicator of progress, over.
S:\Child Welfare\2010 Lesson Plans\CPA FC PSI\Course Powerpoints Foster Care Service Planning & Structured Decision Making FOM
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Reporting Results for Pesticide Programs Robin Powell, EM Pyramid Lake Paiute Tribe Environmental Department.
Salt Water Intrusion Mapping Update Akintunde Owosina Chief, Hydrology and Hydraulics Bureau Operations, Engineering & Construction Division Akintunde.
Welcome Environmental Envisioning Committee… please sign in and have refreshments…. FACILITIES CURRICULUM COMMUNITY SCHOOLS.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
What is Software Engineering?. Software engineering Multi-person construction of multi-version software (David Parnas) An engineering discipline whose.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
U.S. Department of the Interior U.S. Geological Survey The NGGDPP's Best Practices in Data Preservation Project Brian Buczkowski U.S. Geological Survey.
Watershed Planning: Current Status and Next Steps
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Technology Use Plan Bighorn County School District #4 Basin / Manderson, Wyoming “Life-long learning through attitude, academics, and accountability.”
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
EU Water Policy Sustainable water management for generations to come.
BUILDING STRONG ® Fort Worth District Carolyn Staten USACE-SWF-Fort Worth, Texas Deputy Office of Small Business Programs 5 th Annual Business Conference.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
National Association of Flood & Stormwater Management Agencies May 18, 2011 Managing Flood Risk – Local Tools & Challenges.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
On Site Review Overview. 2 The On Site Review Process.
House Concurrent Resolution 171 (2010) Levee District Oversight Planning Study Report to the Senate and House Committees on Transportation, Highways, and.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
John Castilia, PMP Service Management Office CIT CIT/OCIO Pilot Implementation of HSPD-12: A PM’s Insights.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers New Orleans District 75 th Annual Association of Levee Boards of Louisiana COL.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Introduction to School-wide Positive Behavior Support.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
1 Hydraulic and Hydrologic Considerations in Planning.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
2017 Coastal Master Plan Overview Karim Belhadjali
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
Reduce Total Ownership Cost (R-TOC) PURPOSE: The R-TOC program is to achieve readiness improvements in systems by improving the reliability of the system.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Goals and ObjectivesFeb. 20, 2014 TEXAS FREIGHT MOBILITY PLAN: FACILITATING TEXAS’ ECONOMIC GROWTH AND GLOBAL COMPETIVENESS Regional Freight Advisory Council.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Shawn D. Wilson, Ph.D. Secretary
Coastal Working Group Meeting Report Lynn M. Bocamazo,
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Achieving an Operational Office of Water Enterprise Architecture: FY Roadmap November 23, 2005 Achieving an Operational Office of Water Enterprise.
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Revolutionize USACE Civil Works
Maryland’s Draft Phase III WIP for the Chesapeake Bay
Presentation transcript:

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Agenda HSDRRS Purpose and Need Structural Protection Projects Overview Of Guideline Needs Guideline Approach Phase I Guidelines What’s Next? Closing

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES HSDRRS What is HSDRRS? What was achieved by implementing HSDRRS? What are the lessons learned?

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Purpose and Need Purpose Necessary tool to fulfill CPRA’s mission statement Charged with coordinating local, state and federal efforts to achieve Coastal Protection or Flood Risk Reduction Master Plan developed based on a systems approach

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Purpose and Need Need Maintain existing Hurricane Protection System Existing Levees >800 miles across 15 parishes with 15 levee districts $10.9 billion set aside for Structural Protection (2012 Master Plan) Consistent cost efficient process to implement levee design and construction Stand alone agency/regionally specific guidelines, focused on coastal environment

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Structural Protection Projects

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Overview of Guideline Needs Guideline Components Civil / Surveying Hydraulic / Coastal / Water Resources Geotechnical Structural Construction / Specifications Technology – GIS / Data Management Levee Inspection / Operations and Maintenance

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Guidelines Phased Approach Allows early implementation Target items/topics which may yield the most efficient designs Guidelines are a living document and will require regular reviews and updates

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Phase I Guidelines Geotechnical Field Investigation and Laboratory Testing Spacing, samplers, test methods Design Software, factor of safety, staged construction

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES What’s Next? Phase II Guidelines Geotechnical Guidelines - Working Draft Sampling Depth and Intervals Existing Data Reviews Field Study/Laboratory Investigation Geotechnical Design Parameters Civil / Survey Guidelines

LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Closing Questions?