Development & Implementation of Strata Control Practices

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Government Industry R&D Forum March 2005 Pipeline Design & Construction Near Term Focus Future Gaps & Opportunities.
Type your name in Footer Type file name in Footer Annotating Course Work – A PowerPoint Application Year 8, Unit 5 Use this set of PowerPoint slides to.
The Process of Interaction Design. Overview What is Interaction Design? —Four basic activities —Three key characteristics Some practical issues —Who are.
Computer Science Department Program Improvement Plan December 3, 2004.
Highwall Mining. Presentation outline l Highwall mining systems l Geotechnical issues & rating l Guidance Control l Failures and causes l Conclusions.
SCT Operations Investigation into Abnormal Subsidence above a Longwall Panel in the Southern Coalfield, Australia Winton Gale Managing Director SCT Operations.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Lifts and Machinery Rescues Service Delivery 2 Aim To provide students with information to enable them to deal with lift incidents.
Risk Assessment – An Essential Standard
Financial Assessment and
09.35 Task 1: Overall monitoring objectives. Andy Chadwick, BGS (10 mins) 1.
Daniel W.H. Su, Sr. geomechanical engineer Greg J. Hasenfus, Sr. geomechanical engineer Luke Stull, geologist Jun Lu, geomechanical engineer Mark Van Dyke,
Basics of OHSAS Occupational Health & Safety Management System
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
PErforM introduction for managers. Aims of the session Introduce how to use PErforM to identify and control hazardous manual tasks. Outline workplace.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
Information Systems Security Risk Management. © G. Dhillon All Rights Reserved Alignment Glenmeade Vision To provide a personalized experience to our.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Induced Slip on a Large-Scale Frictional Discontinuity: Coupled Flow and Geomechanics Antonio Bobet Purdue University, West Lafayette, IN Virginia Tech,
Department of Civil and Environmental Engineering, The University of Melbourne Finite Element Modelling Applications (Notes prepared by A. Hira – modified.
Introduction Time Quality Cost Project Constraints Success Introduction.
Analyze Opportunity Part 1
“Coal Sector Policy Support Programme” This project is funded by the European Union Implemented by Human Dynamics Consortium TACIS Project: “Coal Sector.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Elements of Effective Behavior Based Safety Programs
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
GEOS 348 Environmental Geology. ENVIRONMENTAL GEOLOGY LINKAGES BETWEEN SOUND SCIENCE AND POLICY INTERDISCIPLINARY APPROACH WITHIN THE SCIENCES MULTIDISCIPLINARY.
MNM Fatal Fall of Roof Accident Fall of Roof Accident April 15, 2011 (Idaho) April 15, 2011 (Idaho) Underground Silver Operation Underground Silver.
Positive Behavior Intervention and Supports: A Brief Introduction.
“A Truthful Evaluation Of Yourself Gives Feedback For Growth and Success” Brenda Johnson Padgett Brenda Johnson Padgett.
Screen 1 of 20 Vulnerability Vulnerability Assessment LEARNING OBJECTIVES Define the purpose and scope of vulnerability assessment. Understand how vulnerability.
David Mitchell, Professional Services Manager Baseline Risk and Vulnerabilities Indicator Tool.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
TRENCHING & EXCAVATION
Excavation.
2.7 Risk Management Otama Adventure 3 Credits. 3 Aims for the unit 1. Life Long Learners: Informed decision makers To be aware of risks in outdoor settings.
PURPOSES OF CONTINUOUS ASSESSMENT Assessment is an integral part of teaching. Observation is your key assessment tool in the primary and junior grades.
Community-Based Coastal Adaptation Planning Presenter Name Date.
New Zealand Standard Health and Disability Services (Restraint Minimisation and Safe Practice) Standards Foreward –Least restrictive environment Legal.
OHSAS Occupational health and safety management system.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
CPNZ Basic Training 011 – Vehicle Accident ‘Crash Plan’
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Industrial Emergency Response for Municipal-Based Responders.
Human Error Reduction – A Systems Approach.
International Safety Rating System
PST Human Factors Jan Shaw Manchester Royal Infirmary CMFT.
Process engineering Quality controls.
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
Engineering Geology William Shehata.
Coaching.
Safety Accountabilities
HSE Case: Risk Based Approach.
Contents Introduction Identification of the knowledge gap
Communities of Practice for the eager Adoption of a Leading Practice Andre van Zyl CoM MOSH Learning Hub.
Benchmarking GEOP 4316.
Fall of Ground Strategy
Roadmap to COR.
Dynamic Risk Assessing in an emergency environment
Fall of Ground Strategy
Chapter 7 Process Management.
Numerical Analysis of slopes
Presentation transcript:

Development & Implementation of Strata Control Practices Management through Understanding Stuart MacGregor B.E Principal Geotechnical Engineer Director SCT Istanbul 2014

Theme “Unforeseen" or "unpredictable" ground conditions are often put forward as the causal factor resulting in loss of life or closure of mines. Often the responsibility is placed on front line personnel with little or no training to recognise and respond to changing conditions.

Theme The ability to manage strata control hazards, following a risk based approach, is achieved by: undertaking systematic and thorough site investigations prior, and during, mining to identify and quantify geotechnical hazards and through the systematic application of measurement, observation and design to understand the interaction of mine openings, ground conditions and application of controls. Elimination of geotechnical hazards – notably poor mine design and practices – is a powerful tool available to the geotechnical engineer early in the planning process.

We have control over this, enabling management of conditions. Mining changes the nature of the ground. How we mine and how we respond will change the outcome. We have control over this, enabling management of conditions.

Methodology The basis for a geotechnical program is a recognition that defining the variability in strata conditions is the key to minimising unforseen problems. This is achieved by the systematic and ongoing evaluation of strata control hazards, which minimises their unexpectedness.

Methodology In practice we are defining a range of geotechnical domains that have similar characteristics (rock types, defects, strength, stress conditions) that respond in a predictable manner during mining. Defining key characteristics of the strata, reinforcement and roadway behaviour for each domain enables an expected range of mining conditions to be determined. For these mining conditions appropriate mine layouts and reinforcement designs can be implemented.

Strata Control Workflow Geotechnical Characterisation Strata Control Workflow Geotechnical Design Systematic & Ongoing Evaluation

Geotechnical Characterisation Provide a base level of geotechnical data on which to conduct mine design Quantify geotechnical environment Identify specific geotechnical hazards impacting mine design Provide plans showing geotechnical domains - define the variation using maps - to assist with prediction, planning and design.

Quality & Type of Data

Geotechnical Data Synthesis

H  h Pw  = 3H - h - Pw Engineers Deal with Stress and Load Understand the source and magnitude of ground stress on your design H  h Pw Determine rock strength Constrain h Solve for H  = 3H - h - Pw

Underground & Surface SITE INVESTIGATIONS Note mining impacts on multiple systems including groundwater/inrush.

Be Aware of Hazards Posed by Caving, Fracturing & Interconnection

HAVE A DESIGN APPROACH SUITABLE FOR YOUR CONDITIONS – UNDERSTAND WHAT IS GOING ON

TYPICAL EXAMPLE OF ROOF BEHAVIOUR FOR DIFFERENT MINING STAGES Industry Training Programs

INCREASING STRESS

Longwall Support Mechanics POOR Ground Control Horizontal Stress and Displacement Indicators Vertical Stress and Displacement Indicators Longwall Support Mechanics POOR Ground Control

Geotechnical Input into Equipment Configuration & Implementation

Systematic and Ongoing Evaluation

Routine Monitoring & TARP’s Forms the basis for operational assessment A set of pre-determined triggers coupled with guidelines on the implementation of controls and responses. Needs a context.

ROUTINTE MONITORING IN ISOLATION IS NOT A MANAGEMENT SYSTEM Trigger -10mm Trigger -30mm

Implementing & Managing Change Incorrect and uncontrolled application = high risk of failure Greatest concern is uncontrolled and unsupervised application Inappropriate designs and consumables Applying the technology under inappropriate geological and mining conditions and mining layouts

Summary Mining is dynamic – with rapid changes in mining geometries and associated ground stress and displacement. Ground response is not typically linear – step changes can occur and it is important to identify and quantify. Understanding these processes enables rational and safe introduction of new mining systems and/or new mining areas. Management of strata control hazards requires systematic and ongoing integration into mining operations. Ground conditions can be managed.