13/12/2013Group 4
Multi-storey building with large spaces Crow’s nest experience Transparent enclosure providing an air-conditioned weather-proof environment 13/12/2013Group 4
The Great Wave off Kanagawa 13/12/2013Group 4 Waves created by bow of a ship Ship in condition of being titled by waves
13/12/2013Group 4 Progress 1Progress 2 Progress 4 Progress 3
13/12/2013Group 4
Similar to Corporation Street Footbridge, Manchester 13/12/2013Group 4
13/12/2013Group 4
13/12/2013Group 4
13/12/2013Group 4
13/12/2013Group 4
Side view 13/12/2013Group 4
13/12/2013Group 4
13/12/2013Group 4 A section of Crow’s nest
13/12/2013Group 4 Wind Foundation
13/12/2013Group 4 Wind Foundation
13/12/2013Group 4 Composite Slabs Easy to design Little restrictions compared to alternatives Glass Cladding – Hybrid Series 3 curtain wall system High insulation timber/aluminium composite system Designed to meet current and future building regulations Steel members Using an electric arc furnace achieving up to 100% recyclable
13/12/2013Group 4
Structural Steel Frame : 80% recycle Electric arc furnace reusable Stimulate Local Economy Social Benefit 13/12/2013Group 4
13/12/2013Group 4