1 Capacity Planning in a General Supply Chain with Multiple Contract Types Stephen C. Graves and Xin Huang May 2008.

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

Capacity Planning For Products and Services
Infor Integrated Business Planning
Strategic Decisions (Part II)
Determining the Optimal Level of Product Availability
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Aggregate Planning in a Supply Chain
Aggregate Planning in a Supply Chain
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Asset Optimization & Decision Support Services. 1 Overview of Service Program Proprietary service platform that marries 30+ years of Engineering & Subject.
Decision and Risk Analysis Financial Modelling & Risk Analysis II Kiriakos Vlahos Spring 2000.
Pricing and Revenue Management in a Supply Chain
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Supply Chain Operations: Planning and Sourcing
Production Systems Chapter 9.
Operations Management
Responsibility Accounting and Transfer Pricing
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
Outline Introduction What is a supply chain?
Supply Contract Allocation Gyana R. Parija Bala Ramachandran IBM T.J. Watson Research Center INFORMS Miami 2001.
Pricing and Revenue Management in a Supply Chain
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Contents Introduction Managing supply Managing demand
IE 475 Advanced Manufacturing Costing Techniques
Supply Chain Management
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Strategic Production Planning Now showing at your local university.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Demand Planning: Forecasting and Demand Management CHAPTER TWELVE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.1-1 Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
Introduction to Operations Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
INVESTIGATORS R. King S. Fang J. Joines H. Nuttle STUDENTS N. Arefi Y. Dai S. Lertworasirikul Industrial Engineering Textiles Engineering, Chem. and Science.
© 2007 Pearson Education 9-1 Chapter 9 Planning Supply and Demand in a Supply Chain: Managing Predictable Variability Supply Chain Management (3rd Edition)
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Contents Introduction Aggregate planning problem
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
© 2004 Prentice-Hall, Inc. 9-1 Chapter 9 Planning Supply and Demand in a Supply Chain: Managing Predictable Variability Supply Chain Management (2nd Edition)
CHAPTER FIVE Responsibility Accounting and Transfer Pricing.
1 Chapter 16 Relevant Costs and Benefits for Decision Making.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Responsibility Accounting and Transfer Pricing Chapter Five Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introduction to Operations Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Market Research on Global Digital Signage Industry Trends Survey and Opportunities Report Published: Dec 2015 Single User License: US $2800 Corporate.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Pertemuan 11.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Chapter 9 Sales and Operations Planning
Operations Management
Chapter 3 Supply Chain Drivers and Obstacles
15 Monopoly.
UNIT –V SUPPLY CHAIN MANAGEMENT
Supply Chain Management
Supply Chain Management
Operations Management
Chapter 15 Pricing and Revenue Management in the Supply Chain
WARM-UP Over the weekend, what type of decision(s) did you have to make? explain the decision(s) you made, what were the other options you had to choose.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Supply Chain Management Lecture 3
Capacity Planning.
Supply Chain Management (3rd Edition)
Firms in Competitive Markets
Perfectly Competitive Markets
Chapter 15 Pricing and Revenue Management in the Supply Chain
Capacity Planning For Products and Services
Presentation transcript:

1 Capacity Planning in a General Supply Chain with Multiple Contract Types Stephen C. Graves and Xin Huang May 2008

Copyright Stephen C. Graves 2008 All Rights Reserved 2 Motivation Prior research has developed algorithms and software for modeling and optimizing the inventory across a supply chain – “strategic inventory placement model” Impetus for current research – develop and deploy a tactical model to provide decision support for determining capacity levels across a supply chain

Copyright Stephen C. Graves 2008 All Rights Reserved 3 Intent Develop a framework to support capacity planning decisions in a supply chain with −Multiple products −Each product requires multiple processes (or components) −Each resource provides capacity for one or more processes Need to determine the right level and type of capacity investments Need to account for network interrelationships, demand uncertainty, multiple time periods, & different capacity contracts.

Copyright Stephen C. Graves 2008 All Rights Reserved 4 Work to Date Developed framework for structuring models Developed and tested algorithms for determining the amount, type and timing of capacity investments across a complex multi-product supply chain Implementation of user-friendly software is underway

Copyright Stephen C. Graves 2008 All Rights Reserved 5 Model assumptions Given demand forecast and contract prices, we first make capacity decisions: −For each resource how much capacity to reserve and with what type of contract Then we learn what the actual demand is and decide how to allocate capacity to meet demand as best as possible Objective is to maximize revenue net of capacity costs

Copyright Stephen C. Graves 2008 All Rights Reserved 6 Example 1 Laptop A Chip Set A Foundry 1 Display A A & T Foundry 3CM 1

Copyright Stephen C. Graves 2008 All Rights Reserved 7 Example 1: Sample Input Data Laptop A Mean2200 STD200 Sales price$700 Table 1: Table of Product Information Fixed Unit PriceUnit Reservation PriceUnit Exercise Price Foundry Foundry CM Table 2: Table of Resource Price Inputs

Copyright Stephen C. Graves 2008 All Rights Reserved 8 Example 1: Model Outputs Fixed-price CapacityOption CapacityTotal Foundry Foundry CM The Expected Total Profit: $ 601,623 Mean – Laptop A: 2200

Copyright Stephen C. Graves 2008 All Rights Reserved 9 Example 1: Performance Statistics Fixed-price Capacity UtilizationOption Capacity Utilization Foundry 12131/2211 = 96.4%-- Foundry 32018/2040 = 98.9%112/171 = 65.5% CM 11945/1954 = 99.5%185/257 = 72.0% Units soldLost sales Average # of213075

Copyright Stephen C. Graves 2008 All Rights Reserved 10 Example 3 Laptop ALaptop B Chip Set A Foundry 1 Display A A & TChip Set BDisplay BA & T Foundry 3 Foundry 4CM 1CM 2 Foundry 3 CM 1 Foundry 2

Copyright Stephen C. Graves 2008 All Rights Reserved 11 Example 3: Sample Input Data Laptop ALaptop B Mean STD Sales price$700$1000 Table 5: Table of Product Information Fixed Unit PriceUnit Reservation Price Unit Exercise Price Foundry 1CS -A Foundry 2CS A/B Foundry 3Display Foundry 4CS - B CM 1A&T – A/B CM 2A&T - B Table 6: Table of Resource Price Inputs

Copyright Stephen C. Graves 2008 All Rights Reserved 12 Questions of Interest Which suppliers should the manufacturer choose? What types of contract should we use for each supplier? Only fixed-price contract? Only option contract? Or Both. How much capacity should we buy?

Copyright Stephen C. Graves 2008 All Rights Reserved 13 Example 3: Model Outputs Fixed-price Capacity Option Capacity Total Foundry 1CS -A20090 Foundry 2CS A/B3650 Foundry 4CS - B Foundry 3Display CM 1A&T – A/B CM 2A&T - B The Expected Total Profit: $ 1,183,981 Mean – Laptop A: 2200 Mean – Laptop B: 1000

Copyright Stephen C. Graves 2008 All Rights Reserved 14 Example a Compare the following four strategies 1.Plan the capacity as given in the figure without option capacity 2.Use a common process to replace process 2a and 2b 3.Add option capacity to process 2a and 2b 4.Combine strategy S2 and S3 12a 2 2b3 3 S S2 1 12a 1 2 2b3 3 S S4

Copyright Stephen C. Graves 2008 All Rights Reserved 15 Example 4: Data Both products have the same price: changes from 66 to 150 Demand information: −E[D_1] = 500, STD(D_1) = 100, E[D_2] = 500, STD(D_2) = 100 Fixed price contracts: −[p_1, p_2a, p_2b, p_3] = [10, 50, 50, 10] Option contracts: −Reservation Price = 5, Exercise Price = 50

Copyright Stephen C. Graves 2008 All Rights Reserved 16 Example 4 Profit Margin Extra Profit (%) S2/S1 S3/S1 (S2+S3)/S1 S4/S1

Copyright Stephen C. Graves 2008 All Rights Reserved 17 Example 5: Multi-period Planning A Supply Chain Network −2 Products, 3 Processes, and 12 Periods. Each process has 4 different types of contract −1 period, 3 periods, 6 periods, and 12 periods Each contract has 4 terms −Duration, Fixed-price, Option reservation price, and Option exercise price

Copyright Stephen C. Graves 2008 All Rights Reserved 18 Sample Demands E [ D 1 ] E [ D 2 ]

Copyright Stephen C. Graves 2008 All Rights Reserved 19 Sample Prices Prices: −Product 1: 65; Product 2: 65. Costs: −All processes have the same price structure. Duration13612 Fixed Price Reservation Price Exercise Price

Copyright Stephen C. Graves 2008 All Rights Reserved 20 Results Process Process Process 3325

Copyright Stephen C. Graves 2008 All Rights Reserved 21 Results (cont.) Process 1Process 2 Process 3

Copyright Stephen C. Graves 2008 All Rights Reserved 22 Summary Have developed a framework to support capacity planning decisions for supply chain Have developed solution algorithms for single period and multi-period problems To do − develop a case study to test and validate approach −finalize prototype software with user friendly interface

Copyright Stephen C. Graves 2008 All Rights Reserved 23 Collaboration Opportunities Need a test case(s) to validate and refine framework −Are we looking at problem in right way? −Does the data exist to test model? −Can our algorithms result in better decisions? −What’s critical/non-critical in how we are viewing problem ? Interest in internships for LFM or SDM students for “beta testing” Contact Steve Graves or Xin Huang

Copyright Stephen C. Graves 2008 All Rights Reserved 24 Example 2 Laptop B Chip Set B Foundry 4 Display B A & T Foundry 3CM 2

Copyright Stephen C. Graves 2008 All Rights Reserved 25 Example 2: Sample Input Data Laptop A Mean1000 STD100 Sales price$1000 Table 3: Table of Product Information Fixed Unit PriceUnit Reservation PriceUnit Exercise Price Foundry Foundry CM Table 4: Table of Resource Price Inputs

Copyright Stephen C. Graves 2008 All Rights Reserved 26 Example 2: Model Outputs Fixed-price CapacityOption CapacityTotal Foundry Foundry CM The Expected Total Profit: $ 556,320 Mean – Laptop B: 1000

Copyright Stephen C. Graves 2008 All Rights Reserved 27 Example 2: Performance Statistics Fixed-price Capacity UtilizationOption Capacity Utilization Foundry 4920/937 = 98.2%55/104 = 52.9% Foundry 3900/910 = 98.9%75/131 = 57.3% CM 2866/870 = 99.5%109/171 = 63.7% Units soldLost sales Average # of97523