Real-Time Orbit And Clock Estimation Using PANDA Software Shi C, Lou YD, Zhao QL, Liu JN GNSS Research Center, Wuhan University, China IGS Analysis Center.

Slides:



Advertisements
Similar presentations
2013 Western Australia Surveying Conference
Advertisements

Moscow Aviation Institute (State University of Aerospace Technologies) Ambiguity Resolution of Phase Measurements in Precise Point Positioning working.
June 12-14, 2013, Ottawa, Canada From dual- to triple-frequency PPP: method, problems and application in California Jianghui Geng, Yehuda Bock Scripps.
FIX_8 (High Accuracy Positioning using EGNOS and Galileo Products) Galileo SME Workshop 5 th & 6 th April 2006.
A Novel Real-Time Precise Positioning Service System: Global Precise Positioning With Regional Augmentation Maorong Xingxing Li,
Solar Disturbance of GPS Satellite Orbits Merita Halili Orhan Veliu 06 june 2008.
© GMV, 2008 Property of GMV Aerospace and Defence S.A.; all rights reserved USE OF SLR OBSERVATIONS TO IMPROVE GALILEO GIOVE-B ORBIT AND CLOCK DETERMINATION.
ESOC Navigation Support Office ILRS Workshop 2008 Poznan, Poland ESOC IGS, IDS, ILRS (Re-) processing T. Springer, M. Otten, I. Romero, J. Dow.
Assessment of SLR observation performance using LAGEOS data Gang ZHAO, You ZHAO, Mingguo Sun, Huanhuan YU Changchun Observatory, NAOC, CAS, China 16 th.
April, 3-5, 2006 J.L. Halbwachs : VIM0 1 The VIMO software : What are VIMOs ? VIMO: “Variability-Induced Mover with Orbit” = astrometric binary with a.
13/06/13 H. Rho Slide 1 Geodetic Research Laboratory Department of Geodesy and Geomatics Engineering University of New Brunswick Evaluation of Precise.
Geodetic Survey Division EARTH SCIENCES SECTOR Slide 1 Real-Time and Near Real-Time GPS Products and Services from Canada Y. Mireault, P. Tétreault, F.
AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, GNSS.
Status of Multi-GNSS Monitoring Network Establishment Japan Aerospace Exploration Agency Satoshi Kogure APEC GIT/15 June 14, 2011.
Estimating COMPASS Orbits And Clocks And Applying To Real-Time Precise Positioning Services Maorong Hongping Zhang, Xiaolin Jia,
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC New Developments and Innovations T.A. Springer, F. Dilssner, E. Schoenemann, M. Otten, I. Romero,
1 First Results of the CMONOC GNSS Network Junping Chen Bin Wu, Shuhua Ye, Shanghai Astronomical Observatory
October 8, session 2REFAG2010 Paris1 Distributed processing systems for large geodetic solutions IAG WG “Comparison and combination of precise.
VRS Network The Magic Behind the Scene
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Titelmaster Geometrical and Kinematical Precise Orbit Determination of GOCE Akbar Shabanloui Institute of Geodesy and Geoinformation, University of Bonn.
IGS Workshop 2008 The Galileo Ground Mission Segment Performances Francisco Amarillo-Fernandez, Massimo Crisci, Alexandre Ballereau John Dow, Martin Hollreiser,
Real-time IGS Network Management and Data Exchange Interfaces Georg Weber, BKG, Germany IGS Analysis Center Workshop, Miami Beach, Florida, 2-6 June 2008.
SVY 207: Lecture 13 Ambiguity Resolution
IGS Workshop, June 02, Validation of GNSS Satellite Orbits C. Flohrer, G. Beutler, R. Dach, W. Gurtner, U. Hugentobler 1, S. Schaer, T. Springer.
EUREF Symposium, Paris, 6-8 June 2012 Impact of Individual GNSS Antenna Calibration Used in the EPN on Positioning Q. Baire, E. Pottiaux, C. Bruyninx,
GOCE Workshop at ESA LP Symposium, Bergen, 29./30.June, 2010 Precise Science Orbits for the GOCE Satellite – Aiming at the cm-level H. Bock 1, A. Jäggi.
Case study for the IGS ultra-rapid orbit requirements Jan Douša Miami Beach, June 2-6, 2008.
1 Tropospheric Signal Delay Corrections Seth I. Gutman NOAA Earth System Research Laboratory Boulder, CO USA NOAA/LSU Workshop on Benefits to the.
ESOC Navigation Support Office EGU Vienna, , 1/18 Ground support network for the Metop GRAS atmospheric sounding mission R.Zandbergen, A.Ballereau,
Latest GNSS results of the CMONOC network and its application in earthquake monitoring Junping Chen, Yize Zhang, Yibing Xie, Weijie Tan, Sainan Yang, Bin.
P. Wielgosz and A. Krankowski IGS AC Workshop Miami Beach, June 2-6, 2008 University of Warmia and Mazury in Olsztyn, Poland
IGS Analysis Center Workshop, 4 June 2008 Recommendations from “RT/NRT user requirements” 1.E-GVAP recommends IGS to support PPP strategy with high quality.
Joint International GRACE Science Team Meeting and DFG SPP 1257 Symposium, Oct. 2007, GFZ Potsdam Folie 1 Retrieval of electron density profiles.
A Geodesist’s View of the Ionosphere Gerald L. Mader National Geodetic Survey Silver Spring, MD.
Data centre support for the IGS-RT PP W. Söhne, H. Habrich, G. Weber Federal Agency for Cartography and Geodesy, Frankfurt am Main, Germany.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
SP Swedish National Testing and Research Institute Real-Time GPS Processing with Carrier Phase FILTER PARAMETER INFLUENCE ON GPS CARRIER PHASE REAL-TIME.
Meeting the Needs of the IGS Real-Time PPP User Community
Presented by: Technical contributions from: THE INTERNATIONAL ASSOCIATION OF GEODESY AND PRECISE POINT POSITIONING.
EUM/OPS/VWG/11 Issue /06/2011 Yoke Yoon Yago Andres Christian Marquardt COSMIC GPS Data Processing Slide: 1.
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
Status of Reference Network Simulations John Dale ILC-CLIC LET Beam Dynamics Workshop 23 June 2009.
SHA: the GNSS Analysis Center at SHAO Junping Chen, Bin Wu, Xiaogong Hu Haojun Li, Xiao Pei, Yize Zhang Shanghai Astronomical Observatory (SHAO)
Real Time Stream Editor for PPP  Conventional approaches to Real Time Precise Point Position use ionosphere- free combination of code and phase observables.
Real Time Stream Editor for PPP  Conventional approaches to Real Time Precise Point Position use ionosphere-free combination of code and phase observables.
Kenneth Johnston US Naval Observatory Presented by Jules McNeff International Committee on GNSS Provider’s Forum Bangalore, India 4 September 2007 GPS.
On the Way to Full PPP Potential Pierre Héroux Geodetic Survey Division, Natural Resources Canada.
Armasuisse Swiss Federal Office of Topography swisstopo Determination of Tectonic Movements in the Swiss Alps using GNSS and Levelling E. Brockmann, D.
NAPEOS: The ESA/ESOC Tool for Space Geodesy
Insensitivity of GNSS to geocenter motion through the network shift approach Paul Rebischung, Zuheir Altamimi, Tim Springer AGU Fall Meeting 2013, San.
ESOC Navigation Support Office IGS Workshop 2008 Miami IGS Real Time Pilot Project: Analysis Centre Activities Loukis Agrotis 4 June 2008.
Formosat-3/COSMIC WorkshopNov 28 - Dec 1, 2006Taipei, Taiwan Estimates of the precision of LEO orbit determination and GPS radio occultations from the.
IGS Workshop 2008, Miami Beach IGN activities as IGS data center The IGN Global Data Centre (GDC) has been designed and implemented in answer to both the.
Investigations on (radial) offsets between different Swarm orbit solutions 8 September th Swarm Data Quality Workshop, IPGP, Paris Heike Peter (PosiTim),
Control Methods Workshop 2010 campaign, Ispra April / 37 GNSS: how should we measure parcels in 2010 ? Cozmin LUCAU, Krasimira GANISHEVA,
Astronomical Institute University of Bern 1 Astronomical Institute, University of Bern, Switzerland * now at PosiTim, Germany 5th International GOCE User.
Recent GNSS activities in Germany for COST
Optimizing high-resolution troposphere estimates using PPP method and Benchmark data set Václavovic P., Douša J. Geodetic Observatory Pecný, RIGTC, Czech.
Real-Time Working Group
Appliance of IceCORS network 2017 by Dalia Prizginiene
GNSS-meteorology situation
Troposphere delay stochastic modelling in precise real-time GNSS applications Tomasz Hadaś1, Norman Teferle2, Wenwu Ding2, Kamil Kaźmierski1, Nicolas Hadjidemetriou2,
Presentation of Public ESA Multi-GNSS Products
CNES Real-time Analysis center Status
New Features of the GNSS Data Center
ESOC IGS Reprocessing T. Springer, F. Dilssner, E. Schoenemann,
Agenda Background and Motivation
CNES-CLS Dynamical modelling of GPS orbits
Presentation transcript:

Real-Time Orbit And Clock Estimation Using PANDA Software Shi C, Lou YD, Zhao QL, Liu JN GNSS Research Center, Wuhan University, China IGS Analysis Center Workshop , June 2008, Miami, Florida, USA

Contents Introduction of PANDA software Strategy for Real-time POD Strategy for Real-time Clock Preliminary Results Summary

Introduction of PANDA PANDA : Positioning And Navigation Data Analyst To derive possible information from GNSS/SLR/ VLBI data in real-time and post-mission Developed at Wuhan University since 2001 Current Applications –POD of GNSS&GEO (COMPASS, GPS) –POD of LEOs, CHAMP GRACE (Delft University), COSMIC (JiaoTong Uni. Taiwan) –Huge Network (NEIS) –PPP+Ambiguity-Fixing(GFZ, Nottingham Uni) –…..

PANDA System Structure

New Development: Real-Time PPP Based Positioning Service System –Real-time GPS orbits –Real-time GPS Satellite Clock Offsets –Precise Point Positioning Funded by –the Program 973 (No:2006CB701301) –Real-time Precise Positioning Service Prototype System (863) –Real-time POD for LEOs (863)

The Strategy For RT-POD Two Steps: Generate NEQs of short ARCs Combine NEQs to estiamte orbits Key Issues: Ambiguity-Fixing Weight of predicted orbits Constrained Parameter: Orbit boundaries Ambiguities ZTD, ERP

Parallel Combination Combine hourly NEQs Time-Consuming 1.Save the combined NEQs of the last n-1,n-2, …,1 hours 2.Combined the last hourly NEQ with the saved combined NEQs 3.Only one combination (red) must be done in real-time Time-Saving Fast restart with saved (combined) NEQ

Orbital Boundary Constraints Juncture Connected Not connected Osculating orbital elements

NEQs: Juncture constraint: Solution with the Constraints

Stratgy For RT Clocks Two approaches are developed: Estimate SatClock Epoch-by- Epoch(1hz) Estimate SatClock Difference between Epoch

Preliminary Results The distribution of the 70 IGS stations for Real time satellite orbit determination (70stations) Rinex data are inputted as stream through simulated real-time model Test Network

Result of RT-POD vs IGS Finals Max ( cm ) Min ( cm ) Mean ( cm ) Radial Cross Along Mean

Result of RT-POD Difference between calculated real-time orbits (Hourly predicted orbits) and IGS final products

Result of RT-CLK vs IGS Finals Statistics of the RMS values max(ns)min(ns)mean(ns) mean0.18 CPUT per epoch on IBM T60 notebook RMS values of the difference between the calculated SatClock and IGS final products over the period day of year 2006

Performance of the RT Production Quality of the Real-time SatClock and SatOrbit for the day of year 2006

PPP Based on the RT Production Epoch by Epoch WUHN Station RMS: N: 2.87cm E: 3.23cm U: 7.96cm

Real-time POD, 5cm Real-time Clock, 0.18ns PPP with the Products, 5, 10 cm Summary

Thanks For Your Attention !