Cross-Calibration of FDs Sean R. Stratton TA-All Meeting – June 2010.

Slides:



Advertisements
Similar presentations
PMT Calibration Results and the MC simulation Shigeru Yoshida, Chiba University
Advertisements

APS-DPP-2005-LeBlanc-1 Update on MPTS B.P. LeBlanc Princeton Plasma Physics Laboratory NSTX Results Review July 26-27, 2006 Princeton, NJ.
ABRF meeting 09 Light Microscopy Research Group. Why are there no standards? Imaging was largely an ultrastructure tool Digital imaging only common in.
CRAYS and TA telescope calibration ICRR N. Sakurai, M. Fukushima Utah University L. Wiencke.
1 29 th March 2007 C.P. Ward Pat Ward University of Cambridge Status of Far Detector Linearity Calibrations.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Circadian Rhythms / Biological Luminescence Detection Eitan Novotny Sean Dang Philip Tran Yu Kun Zhang.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
October 1 -10, 2014JEM-EUSO Workshop - Toulouse1 Balloon – EUSO Xenon / UV LED Flasher Calibration Evgeny Kuznetsov for UAH / MSFC GLS team University.
Signal vs Noise: Image Calibration First… some terminology:  Light Frame: The individual pictures you take of your target.  Dark Frame: An image taken.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Results from the PMT test bench in BCN (10-Oct-03) J.Garra, R.Graciani, E.Graugés, X.Xirgu.
Atmospheric Monitoring in the TA experiment
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
Sphere Standards and Standard Spheres Dr. Richard Young Optronic Laboratories, Inc.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Performance of CRTNT for Sub-EeV Cosmoc Ray Measurement Zhen Cao IHEP, Beijing & Univ. of Utah, SLC Aspen, CO, 04/2005.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
SLAC, HiRes T-461: “FLASH” part 1 Justin Findlay.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
The Absolute Calibration of the HiRes Detectors J.N. Matthews, S.B. Thomas, N. Manago, L. Perera, G. Burt, and R. Snow For the HiRes Collaboration.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Standard Candle, Flasher, and Cascade Simulations in IceCube Michelangelo D’Agostino UC Berkeley PSU Analysis Meeting June 21-24, 2006.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
DOM Two Dimensional Scanning using testDAQ Hiroko Miyamoto T. Noda Faculty of Science Department of Physics Chiba University.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
AS ICT.  Have an understanding of how organizations use ICT.  Be able to describe a number of uses, giving the hardware and software requirements 
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
IceCube Calibration Overview Kurt Woschnagg University of California, Berkeley MANTS 2009 Berlin, 25 September identical sensors in ultraclean,
Gain stability and the LYSO beam radiation monitor measurements
Atmospheric Monitoring at HiRes Status Enhancements Lawrence Wiencke HiRes NSF Review Nov Washington DC.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe.
Microfluidic Glucose Sensor Senior Design Group 4
Studies of Electroweak Interactions and Searches for New Physics Using Photonic Events with Missing Energy at the Large Electron-Positron Collider Marat.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Digital Light Sources First introduced in 2001.
Control Systems in Medical Applications
Ultra High Energy Cosmic Ray Spectrum Measured by HiRes Experiment
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Absolute energy calibration of
Yuxi Pan University of California, Los Angeles
Announcements HR Diagram lab will be extended for one week. I’ll talk about it today. Homework: Chapter 9 # 1, 2 & 3 Next week is a Dark Sky Night. If.
Image calibration Geoff Smith, September 2018.
Control Systems in Medical Applications
Presentation transcript:

Cross-Calibration of FDs Sean R. Stratton TA-All Meeting – June 2010

Motivation We’re still trying to understand the relative energy scale differences between our FDs. The UVLED was used to cross-calibrate all three FD sites. Although RXF tests have been done in the past, we needed a longer, more thorough test to be done.

BRM/LR Calibration Method Get absolute calibration for selected tubes. ◦ CRAYS. Gain-match remaining PMTs by adjusting individual HV. Correct tube gains in each camera according to: ◦ Camera temperature. ◦ HV supply. ◦ Relative gain from XF data. Gains relevant for 1 hour periods.

BRM/LR Calibration Method Get absolute calibration for selected tubes. ◦ CRAYS. Gain-match remaining PMTs by adjusting individual HV. Correct tube gains in each camera according to: ◦ Camera temperature. ◦ HV supply. ◦ Relative gain of center PMT (0x77). Gains relevant for 1 hour periods. Hardware Level

BRM/LR Calibration Method Get absolute calibration for selected tubes. ◦ CRAYS. Gain-match remaining PMTs by adjusting individual HV. Correct tube gains in each camera according to: ◦ Camera temperature. ◦ HV supply. ◦ Relative gain of center PMT (0x77). Gains relevant for 1 hour periods. Software Level

The Calibration Constants G0G0 Absolute Calibration Constant – Only applies to specific subset of tubes (channels 0x33 & 0x77 of every camera and 0xB3 in cameras 0&6). Measured with CRAYS, has units of FADC/photon. G1G1 XF Non-Uniformity Correction – The HV levels in each camera are adjusted to get a flat response across all channels using the XF. This factor accounts for the non- uniformity of the Xenon source. G2G2 Xenon Flasher Correction – Tube gains are corrected using run-time Xenon flasher data. Mirror splash-back effects are accounted for by using data taken during HV adjustment. G3G3 YAP Correction – YAP source is used to monitor PMT aging effect. This value is currently unity (?). G4G4 Temperature Correction – Each camera’s temperature is monitored, and gains are corrected using a typical dependence of -0.72%/°C.

Case Study: BRM Clear CLF run night Lots of data (~10 hr.)

BRM G 0 as of Feb. 08

BRM G total for

G 0 = T 0 = 24.55

Camera 08

Camera 07 When/Why was HV Changed?

Camera 10

Camera 05 Camera 07 Camera 10

4 5

6 7

8 6 7

10 11

25 Feb Sep 2008

Camera Temp. Correction Corrected % Change % % % % % % % % % % % %

Camera 05

Question 1 Are the built-in XF used as an absolute light source or is it used to check uniformity and relative gains? In other words, do we know or care exactly how many photons are produced by each XF per flash?

Question 2 It is our understanding that the HV supplied to each tube is adjusted to match the output signal of the absolutely calibrated tubes (0x77, 0x33, & sometimes 0xB3), using covered mirrors and the built-in Xenon flasher apparatus. How is this done? In software? Low-level analysis?

Question 3 If each tube’s HV is adjusted to gain-match the absolutely calibrated PMT’s, then why would we need to adjust the HV of an absolutely calibrated PMT (from CRAYS)?