Solve the equation. ANSWER 62.4 ANSWER 17 ANSWER 11 Warm-Up Exercises 1. = 780 12.5r 2. 178 = 25+ 9x9x 3. 28+40g = 636 () g – 18.

Slides:



Advertisements
Similar presentations
EXAMPLE 2 Look for a pattern Paramotoring A paramotor is a parachute propelled by a fan-like motor. The table shows the height h of a paramotorist t minutes.
Advertisements

This word equation is called a verbal model. U SING A P ROBLEM S OLVING P LAN The verbal model is then used to write a mathematical statement, which is.
EXAMPLE 2 Look for a pattern Paramotoring A paramotor is a parachute propelled by a fan-like motor. The table shows the height h of a paramotorist t minutes.
1.5 Problem Solving Using Algebraic Models p. 33.
1.5 Problem Solving Using Algebraic Models Algebra 2.
1: (A.1)(B) 1. Which equation best represents the relationship between x and y in the table at the right? A y = –6x – 10 B y = x2 – 5 C y = x + 25.
Copyright © Cengage Learning. All rights reserved. Fundamentals.
1.5 Problem Solving Using Algebraic Models Algebra 2 Mrs. Spitz Fall 2008.
Solving equations that involve formulas.
EXAMPLE 4 Solve a multi-step problem FOUNTAINS
Standardized Test Practice EXAMPLE 4 ANSWER The correct answer is B. DCBA Simplify the expression 4(n + 9) – 3(2 + n). 4(n + 9) – 3(2 + n) = Distributive.
Standardized Test Practice
Standardized Test Practice
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3-Develop Solutions Unit 4-Implement a Solution Unit 5-Test and Evaluate.
Holt CA Course Equations in Two Variables Preparation for AF1.0 Students write verbal expressions and sentences as algebraic expressions and equations;
The Transcontinental Railroad The Idea The Construction The People Involved.
S ECTION 1.6: P ROBLEM S OLVING U SING A LGEBRAIC M ODELS Goal: Use problem solving strategies to solve real- life problems.
1.5 Problem Solving Using Algebraic Models. Rates: the key word is per time– get some examples: mph, gallon per minute, doughnuts made per hour Be able.
Students will make Connections to Algebra  Variable:  A letter used to represent a range of numbers.
ANSWER = 12.5r 2.9x + 25 = 178 ANSWER ANSWER = 40g + 28(18 – g) 4. A balloon is released from a height of 5 feet above the ground.
Chapter 1. Chapter 1.1 Variables Age Activity Start with your age Step 1: Add 5 to the age Step 2: Multiply the result of Step 1 by 2 Step 3: Subtract.
You have learned to use a verbal model to solve real-life problems. Verbal models can be used with other problem solving strategies, such as drawing a.
Find the product. 0.4” (height) Warm-Up Exercises () 8 – m () 9m – ANSWER m 2m 2 17m72 + –z 2z 2 4z4z60 –– ANSWER y 2y – ANSWER d 2d 2 18d+81+ ANSWER.
Warm-Up Exercises Find the x -intercept and y -intercept x3x 5y5y = – 5 ; 3 – ANSWER y 2x2x = ANSWER ; 7 – 2 7.
243 = 81 • 3 81 is a perfect square and a factor of 243.
Warm-Up Exercises Find the exact value. ANSWER – 144 ANSWER 12 – Use a calculator to approximate the value of to the nearest tenth
1.5 PROBLEM SOLVING USING ALGEBRAIC MODELS Algebra 2.
EXAMPLE 1 Use a formula High-speed Train The Acela train travels between Boston and Washington, a distance of 457 miles. The trip takes 6.5 hours. What.
Sections 1. 4: Rewriting Equations and Formulas Section 1
1. Solve x2 = 100. ANSWER 10, –10 2. Solve x2 + 9 = 25. ANSWER 4, –4
Do Now You work 8 hours and earn $60. What is your earning rate? (Important to include units.) You buy 14 gallons of gasoline at $ 3.65 per gallon. What.
Chapter 1 Section 5: Problem solving Using Algebraic Models.
Finding a Linear Model Section 2.4. Lehmann, Intermediate Algebra, 4ed Section 2.4 A company’s profit was $10 million in 2005 and has increased by $3.
Lesson 2-5 Warm-Up.
Warm-Up Exercises Find the value of when 1. = x x ANSWER 10 2.
1.5 Use a Problem Solving Plan Objective: To be able to use a problem solving plan to solve problems Warm-up: 1.Mr. Lu is planting trees around.
1.5 Use a Problem Solving Plan You will use a problem solving plan to solve problems. Essential Question How can you use a problem solving plan to solve.
1. Mr. Lu is planting trees around the perimeter of a rectangular park
2.6 Write Ratios and Proportions
EXAMPLE 1 Use a formula High-speed Train The Acela train travels between Boston and Washington, a distance of 457 miles. The trip takes 6.5 hours. What.
Example 3 Solving an Equation Using Addition The solution is ANSWER Original equation 13=4.5c– Add 4.5 to each side. (Addition property of equality)
Example 1 Find the Area of a Right Triangle Find the area of the right triangle. SOLUTION Use the formula for the area of a triangle. Substitute 10 for.
3.5 Warm Up Warm Up Lesson Quiz Lesson Quiz Lesson Presentation Lesson Presentation Write Ratios and Proportions.
Chapter 1: Expressions, Equations, and Functions.
Holt Algebra The Quadratic Formula. Holt Algebra The Quadratic Formula.
California Nevada Utah Wyoming Nebraska Kansas Oklahoma Texas New Mexico Arizona Colorado South Dakota North Dakota Montana Idaho Oregon Washington It.
Twenty Questions Algebra 2012 EOC Review Twenty Questions
1.5 Problem Solving Using Algebraic Models. In this lesson you will: Use a general problem solving plan to solve real-life problems. Use other problem.
1.1 Using Problem Solving Strategies and Models Goal : Solve problems using verbal models Note Taking Guide Pg. 1.
ALGEBRA II: CHAPTER 1 SECTION 5: USE PROBLEM SOLVING STRATEGIES AND MODELS OBJ: SOLVE PROBLEMS USING VERBAL MODELS.
CAN USE THEM ON YOUR TESTS! HELPS YOU WITH YOUR ASSIGNMENT!
2.6 Write Ratios and Proportions You will find ratios and write and solve proportions. Essential Question: How do you find ratios and write and solve proportions?
1 Copyright © Cengage Learning. All rights reserved.
1.5 “Using Formulas”  A formula is an algebraic equation that relates two or more variables.
Learning Target: I can analyze primary sources to determine the importance of the Transcontinental Railroad for the United States. Do Now: Analyze the.
Algebra II Review of Algebra. Real Numbers and Number Operations (1.1) Real numbers can be pictured as points on the real number line. { }
WRITE AN ALGEBRAIC MODEL.
ESSENTIAL QUESTION: How do you calculate the area of trapezoids?
Solving equations that involve formulas.
Topic 3 – Linear Functions, Equations, and Inequalities Class 4 – Slope-Intercept Form Mr. Solórzano – Algebra 1.
6-2 Solving Systems Using Substitution
1.5 Use Problem Solving Strategies and Models
Railroad Expansion.
Complete each equation. 1. a 3 = a2 • a 2. b 7 = b6 • b
Learn to combine like terms in an expression.
1.1 Variables Objective: Students will be able to substitute numbers in for variables and evaluate problems. Students must demonstrate they know how to.
1.1 Using Problem Solving Strategies and Models
2.1 Using Problem Solving Strategies and Models
2.1 Using Problem Solving Strategies and Models
A rational equation is an equation that contains one or more rational expressions. The time t in hours that it takes to travel d miles can be determined.
Presentation transcript:

Solve the equation. ANSWER 62.4 ANSWER 17 ANSWER 11 Warm-Up Exercises 1. = r = 25+ 9x9x g = 636 () g – 18

ANSWER 497 ft Warm-Up Exercises 4. A balloon is released from a height of 5 feet above the ground. Its altitude (in feet) after t minutes is given by the expression. What is the altitude of the balloon after 6 minutes? 82t + 5

Example 1 Write and Use a Formula Chairlifts Chairlifts transport snowboarders and skiers to the tops of the ski runs. The Iron Horse Quad Chairlift in Montana carries skiers a distance of 3250 feet. The chairlift moves at a speed of 450 feet per minute. Find the time it takes the chairlift to travel the entire distance. SOLUTION You can use the formula to write a verbal model. rtd = VERBAL MODEL Time Rate = Distance

Example 1 Write and Use a Formula LABELSDistance(feet) Rate(feet per minute) Time(minutes) = = = t ALGEBRAIC MODEL = t Write algebraic model = t Divide each side by t ≈ Use a calculator. ANSWER It takes the chairlift about 7 minutes to travel the entire distance.

Checkpoint 1.Find the time it takes the chairlift in Example 1 to travel 1800 feet. ANSWER 4 min Write and Use a Formula

Write and Use an Algebraic Model Example 2 Conservation Low-flow faucets help conserve water. They have a flow rate of at most 2.5 gallons per minute. To test whether a faucet meets this standard, you time how long the faucet takes to fill a 1 -gallon container. The result is 0.3 minute. Find the flow rate for the faucet. Is it a low-flow faucet? SOLUTION VERBAL MODEL Volume of container Time needed to fill container Flow rate of faucet =

Write and Use an Algebraic Model Example 2 Volume of container 1 = (gallon) Flow rate of faucet r = (gallons per minute) Time needed to fill container 0.3 = (minute) LABELS 3.3r ≈ Divide each side by 0.3 ; use a calculator. ANSWER The flow rate is about 3.3 gallons per minute, which is greater than the standard for low-flow faucets. This is not a low-flow faucet. ALGEBRAIC MODEL Write algebraic model. () 0.31 = r

Look for a Pattern Example 3 Skyscrapers The table below gives the heights from the ground to the top of the first few stories of the Republic Plaza in Denver, Colorado. Determine the height from the ground to the top of the 9th story. SOLUTION Look at the difference in the heights given in the table. After the lobby, the height increases by 12.5 feet per story. You can use the observed pattern to write a model for the height. Height to top of story (ft) StoryLobby 36 2

Look for a Pattern Example 3 VERBAL MODEL Height of lobby Height of story Number of stories above lobby Height to top of a story =+ (feet) (feet per story) (stories) LABELS Height to top of a story h = Height of story 12.5 = Number of stories above lobby n = Height of lobby 36 = (feet)

Look for a Pattern Example 3 ANSWER The height to the top of the 9th story is about 136 feet. ALGEBRAIC MODEL 12.5n = 36h + Write algebraic model = 36h + () 8 Substitute for n. = – = 136h Simplify.

Draw a Diagram Example 4 Railroads In 1862, two companies were given the rights to build a railroad from Omaha, Nebraska, to Sacramento, California. The Central Pacific Railroad began from Sacramento in late Twenty months later, the Union Pacific Railroad began from Omaha. The Central Pacific Railroad averaged 10.5 miles of track per month. The Union Pacific Railroad averaged 23.6 miles of track per month. The illustration shows the two companies meeting in Promontory Summit, Utah, as the 1780 miles of track were completed. When did the companies meet? How many miles of track did each company build?

Draw a Diagram Example 4 SOLUTION Begin by drawing and labeling a diagram, as shown. SacramentoPromontory SummitOmaha VERBAL MODEL Total miles of track Union Pacific rate Central Pacific time Union Pacific time =+ Central Pacific rate

Draw a Diagram Example 4 LABELS Total miles of track 1780 = (miles) (months) Central Pacific time t = Central Pacific rate 10.5 = (miles per month) Union Pacific rate 23.6 = (miles per month) Union Pacific time t 20 = – (months) ALGEBRAIC MODEL Write algebraic model. 10.5t = () 20t – Simplify. 34.1t = t = t – Distributive property 34.1t = – Combine like terms.

Draw a Diagram Example 4 66t ≈ Divide each side by ANSWER The construction took 66 months from the time the Central Pacific Railroad began in So, the companies met in early The number of miles of track built by each company is: years Central Pacific: = 10.5 miles month 66 months 693 miles 23.6 miles month months 1086 miles () 2066 – ≈ Union Pacific:

2.You borrow $195 from your aunt. Your aunt is not charging you any interest, but you want to repay her as soon as possible. You can afford to pay her $15 per week. Use the problem solving plan to find how long it will take you to repay your aunt. Checkpoint ANSWER 13 wk Write and Use a Simple Model