U.S. Department of the Interior U.S. Geological Survey Intergraph User Group ASPRS 2006 Annual Conference Reno, Nevada Overview of the USGS Plan for Quality.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Data Services Task Team Proposal Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
U.S. Department of the Interior U.S. Geological Survey GeoData Archiving and Long-Term Preservation Presented by John Faundeen at 20th International CODATA.
Course: e-Governance Project Lifecycle Day 1
Systems Analysis and Design in a Changing World
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
U.S. Department of the Interior U.S. Geological Survey USGS Digital Aerial Mapping Camera Status CRSS/ASPRS Specialty Conference October 2007 USGS Remote.
Stepan Potiyenko ISS Sr.SW Developer.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Considering an Enterprise Architecture for the NSDI
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
The Technical Community Understanding the Procurement Cycle LaShawn Davis Professional Intern Program Level II Presentation.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group Mapping the Path to Digital Sensor.
Chapter 19 OPERATIONS AND VALUE CHAIN MANAGEMENT © 2003 Pearson Education Canada Inc.19.1.
How ISO 9001 Fits Into The Software World? Management of Software Projects and Personnel CIS 6516 March 6, 2006 Prepared by Olgu Yilmaz Swapna Mekala.
Guiding principles for the Federal acquisition system
5-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10.
U.S. Department of the Interior U.S. Geological Survey ASPRS 2006 Annual Conference Reno, Nevada Overview of the USGS Plan for Quality Assurance of Digital.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
U.S. Department of the Interior U.S. Geological Survey ASPRS Panel on USGS Progress on Remote Sensing Calibration and Quality The National Map Quality.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group The Proposed USGS Plan for Digital.
U.S. Department of the Interior U.S. Geological Survey USGS GIS 2006 Workshop Denver, Colorado Overview of the USGS Plan for Quality Assurance of Digital.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Overview Lifting the Curtain - Debriefings FAI Acquisition Seminar.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Radiometric and Geometric Calibration Workshop Camera calibration program in the United States: past, present, and future U.S. Department of the Interior.
IntroductionUnderstanding the IOOS ProjectThe SAIC Team OverviewSummaryPast PerformanceThe SAIC Team Approach 1 Agenda  Introduction  The SAIC Team.
University of Sunderland CIFM03Lecture 2 1 Quality Management of IT CIFM03 Lecture 2.
U.S. Department of the Interior U.S. Geological Survey Intergraph DOT Meeting ASPRS 2006 Annual Conference Reno, Nevada In-Situ Calibration Challenge to.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group Mapping the Path to Digital Sensor.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
ASPRS 2005 Annual Conference, Baltimore, Maryland Overview of USGS Calibration Activities U.S. Department of the Interior U.S. Geological Survey.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group NOAA March 2005 Greg Stensaas USGS.
ASPRS Panel on Digital Sensor Calibration/Evaluation
U.S. Department of the Interior U.S. Geological Survey U.S. Geological Survey Scientific Records Appraisal Tool Presented at the Ensuring the Long-Term.
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
U.S. Department of the Interior U.S. Geological Survey Steve Helterbrand, USGS Bryan Christensen, SAIC at USGS EROS Digital Aerial Data Provider Certification.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Joint Agency Commercial Imagery Evaluation (JACIE) 7 th Annual Workshop held March 25-27, 2008  USGS, NGA, USDA, and NASA Collaboration Next Workshop.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
ASPRS 2005 Annual Conference, Baltimore, Maryland Overview of USGS Calibration Activities U.S. Department of the Interior U.S. Geological Survey.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
U.S. Department of the Interior U.S. Geological Survey Archiving Geospatial Data John Faundeen, Archivist Presentation to Map & Geographic Information.
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
Communities of Practice & L ESSONS L EARNED Budget, Finance, and Award Management Large Facilities Office May 2016 Large Facilities Workshop 2016 S. Dillon.
U.S. Department of the Interior U.S. Geological Survey Commercial Remote Sensing Data for Federal Users and Partners The Commercial Remote Sensing Space.
Beyond the BACoE: Developing Business Analysis Maturity.
U.S. Department of the Interior U.S. Geological Survey Jon Christopherson SGT, Inc. at USGS EROS Sioux Falls, SD Work performed under.
BLM Decision Making Process
W. Geoffrey Gabbott USDA FSA Contracting Officer
TechStambha PMP Certification Training
Enterprise Content Management Owners Representative Contract Approval
CMMI – Staged Representation
Mapping the Path to Digital Sensor Calibration
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Software Reviews.
Mapping the Path to Digital Sensor Calibration
Fundamental Science Practices (FSP) of the U.S. Geological Survey
Presentation transcript:

U.S. Department of the Interior U.S. Geological Survey Intergraph User Group ASPRS 2006 Annual Conference Reno, Nevada Overview of the USGS Plan for Quality Assurance of Digital Aerial Imagery

2 The major players: Manufacturers Data Providers Procurement officials End-users Introduction

3 Outline Background ASPRS Panel recommendations USGS Plan for Quality Assurance of Digital Aerial Imagery Status and schedule Summary

4 Why calibration at USGS? Photogrammetric methods for map generation Map production primarily done in-house Quality assurance measure for aerial photography from aerial contractors Leadership role in standards development Unbiased, independent agency with technical expertise Quality assurance for The National Map Background

5 USGS Camera Calibration History USGS responsible for calibration services for film camera in United States since 1973 USGS operates Optical Sciences Lab (OSL) in Reston, VA with a custom-built calibration instrument Current policy requires current (within 3 years) camera calibration report on file before award of contract The “Catch-22” problem for digital sensors

6 Continue to provide analog calibration services Develop and implement digital calibration capabilities Develop standards for camera and sensor calibrations Develop and implement in-situ calibration methods ASPRS Recommendations

7 Stage 1: Initiation Stage 2: Contagion Stage 3: Control Stage 4: Integration Stages of New Technology

8 Initiation:Research and pilot projects Contagion:Wild enthusiasm and demand Control:Refined standards and format Integration:DOQs critical to enterprise operation Example: DOQs

9 Lack of information: What, where, why, and how? The unknown: Does it perform as claimed? Business decision: Does it make business sense? Lack of experience: What I can or can not do? Operational changes: What are the best practices? Lack of standards: What are the specifications? Overcoming inertia: Acceptance by clients? The Barriers to New Technology

10 An independent validation of manufacturer’s specifications Development and monitoring of “best practices” Standardized procurement specifications Uniform quality assurance measures The Formula for Quality

11 Development and of a comprehensive quality plan Acceptance and use by Inter-Agency Digital Image Working Group agencies Requirement by other agencies and contracting offices Acceptance by general user community What the USGS Proposes

12 The major players: Manufacturers Data Providers Procurement officials End-users Your Perspective

13 The USGS Perspective Image products and services for customers Contracts with Data Providers Occasional procurement of sensor systems Specialized geospatial data for research projects End products for The National Map

14 USGS Plan for Quality Assurance Four major parts covering two major processes:  Data Production: Manufacturers Certification Data Providers (flyers) Certification  Data Purchasing & Acceptance Contracting Guidelines Data Acceptance Standards

15 The USGS Plan Data Procurement: Contracting Guidelines & Boilerplate Tool Data Users and Inspectors: Acceptance Standards Sensor Manufacturers: Manufacturers Certification Data Providers: Data Providers Certification User Needs Data Procurement Domain Data Generation Domain Final Product

16 Manufacturers Certification Aerial Digital Imaging is in its “Wild West” phase  Anything & everything being tried  Some metric-quality systems  Many “other” systems How does the customer know which can produce mapping-quality data? USGS to offer “type certification” of mapping-quality digital aerial sensors  Must be stable, well-quantified, repeatable  Able to routinely generate mapping-quality data When operated properly!

17 Communicates specifications Provides evidence of system performance Independent certification helps to promote sensor systems Supports verification of Data Provider’s system Type certification eliminates burden of calibration for each sensor sold in the United States (1 time vs. n times) Eliminates need for USGS to have custom-built calibration instrument for calibration purposes Benefits of Manufacturers Certification

18 Data Providers Certification Second half of data generation is the flyers/Data Providers’ data processing USGS to provide Data Providers Certification Focused on processes and process control  Ensures that Data Providers are operating sensors in accordance with manufacturer’s instructions and limitations  Ensures that Data Providers follow quality procedures Desire to ensure reliability, repeatability, and trust

19 Provides evidence of performance of products Independent certification helps to promote product specifications and Data Provider’s capabilities Documents Data Provider’s quality assurance plan and “best practices” One certification for Data Provider and not for each camera Data Providers no longer have to send cameras to OSL for calibration, reducing down-time and shipping expenses Benefits of Data Providers Certification

20 Contracting Guidelines User community is not sure how to contract for digital imagery  New terms, capabilities, standards, lexicon  Inhibits digital contracting  Addresses boilerplate requiring “USGS Certificate”  Goal is to remove barriers to digital aerial contracts  Encourage digital imaging Created Federal Digital Imagery General Contract Guideline

21 Standardized terms and descriptions make the contracting process easier and more uniform among agencies Guidelines help acceptance of digital sensors and educate end-users on benefits of digital technology Standardized terms and guidelines help contracting officers describe their users needs Standardized performance measures USGS certifications provide a priori acceptance of systems and Data Provider’s “best practices” Manufacturer and Data Providers Certification reduces necessary documentation in the RFP process Benefits of Contracting Guidelines

22 Digital Data Acceptance Standards End-users unsure of how to judge digital aerial data quality  New terms & capabilities (resolution, spectral, etc.)  Each customer understands things differently There is a need for common, uniform definitions and methods for evaluating quality of image data USGS to work with Inter-Agency Digital Image Working Group to develop these standards Goal is a Web-based tool illustrating quality problems, measurement techniques, and standards

23 Data consumers have common standards to evaluate data products More consistent acceptance/rejection criteria among contracting agencies Clearer standards and guidelines helps to eliminate false expectations Ensures high quality products Increases customer satisfaction Benefits of Acceptance Standards

24 Manufacturers Certification (Cost-shared by USGS and manufacturers) Data Providers Certification (100% by Data Providers) Contracting Guidelines (100% USGS and IADIWG funded) Acceptance standards (100% USGS and IADIWG funded) Funding Strategy

25 Manufacturers Certification Guidelines in work now Up to 4 manufacturers to be certified this fiscal year Two factory visits completed; reports pending Four Data Providers have expressed interest working on the initial round of Data Providers Certification First draft of Digital Imagery Contracting Guideline completed and reviewed by limited group  A Web-based tool to help generate contracting language is being developed Status

26 My personal opinion Thanks for the cooperation Cost-benefit Taking the high ground Factory visit completed, report in-progress Another opinion (Suppliers, testing, and quality control) A few details, but no issues Type certification on DMC will be issued Intergraph Manufacturers Certification

27 USGS Plan for Quality Assurance of Digital Aerial Imagery briefed during ASPRS panel session Invite comment from broader community Finalize and obtain ASPRS approval Begin initial Data Providers Certifications Provide briefings to geospatial community Participate in international forum to communicate plans in United States Next Steps

28 Four Phases of Technology Assimilation: Phase 1: Identification and investment Phase 2: Learning and adaptation Phase 3: Rationalization and management control Phase 4: Maturity and widespread acceptance Closing Thought

29 To implement a comprehensive, meaningful process that ensures the quality of data products and services To cooperatively develop the plan with all elements of the geospatial community Education and training also a major component Good for one is good for all To establish a model to support new technologies Summary

30 IADIWG Web site at: For more information

31 Contact: Gregory L. Stensaas Remote Sensing Systems Characterization Manager USGS EROS Data Center nd Street Sioux Falls, SD For issues or comments

32 USGS Manufacturers Review Team Review Team Lead - Gregory L. Stensaas Remote Sensing Technologies Project Manager USGS Earth Resources Observation and Science Center, Sioux Falls, SD Systems Engineering Team Member - Jon Christopherson Science Applications International Corporation (SAIC) Contractor to the USGS EROS, Sioux Falls, SD Photogrammetric Engineering Team Member - Dr. George Y. G. Lee U.S. Geological Survey, Menlo Park, CA Geo-Spatial and Software Engineering Team Member - Donald Moe Science Applications International Corporation (SAIC) Contractor to the USGS EROS, Sioux Falls, SD Radiometric and Physics Team Member - Dr. Robert Ryan Science Systems and Applications, Inc. Contractor to NASA Stennis Space Center, MS

33 Questions or comments? The USGS Plan