Deryck Williams – Chairman Rick Lukay – WG Lead. Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry.

Slides:



Advertisements
Similar presentations
W ORK G ROUP ON E VALUATION OF NAF R EMOVAL AND W ATER - W ETTING BY S PACERS – S UMMER 2013, W ASHINGTON, DC Deryck Williams – Chairman.
Advertisements

Objectives of IWG CRS Improve child safety by improved protocol and validated tools IWG CRS take care of protocol Needs advice from WG12 on the tools,
Dynamic Settling/Stability Workgroup – Summer 2013
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
> delete the picture and insert your chosen picture using the “insert/image/from file…” menu. Once the image is inserted, resize and “Send to back” using.
May, Bit Round Robin Scheduling t t t. May, Bit Round Robin Scheduling t t t.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
API Dynamic Settling June 11-15, Project Goals Design four systems for cooperative testing. System 1 Pass API Sedimentation Test Fail Dynamic Modified.
R OLES AND R ESPONSIBILITIES Your Role as Area President  Represent the area on the KEHA Board of Directors  Preside at all area meetings.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
Roles & Responsibilities
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
EARTHKIND ® WATER CONSERVATION PROGRAM EAST REGION.
+ sysSTEM Orientation AUGUST 23, 2013 Maryland Science Center.
To Conduct FlexPLI Round Robin Car Test Smoothly and Effectively We had 10 organizations offering to join the FlexPLI Round Robin Car Tests. To conduct.
API Cooperative Testing Program Hyatt on Capitol Hill Washington, DC June 25th, 2013.
ITS Contract An Overview of the Instructional Telecommunications Services Contract.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Technical Track Work Group Report Out August 22, 2012.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Laboratories Energy Efficiency Research Activities March, 2006.
Query Health Distributed Population Queries Implementation Group Meeting November 8, 2011.
Task Group Study of Extended Time PEI Tests on an Oil Matrix ESCIT Meeting 2007 August 9 Midland, Michigan Presented by: Ted Selby Task Group Chair.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
Transportation, Handling, and Testing Standards Update 12/3/14 Bryan Williams Adeola Akinola IOPP Transport Packaging Committee.
WG on Composite Cements: Composite cement Annex for API Spec 10A - Ballot Result and Analysis Washington DC, June 2016, Heiko Plack.
Doc.: IEEE /0185r0 Submission September 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – September 2006 IEEE P
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
Conducting Marketing Research
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Winter Meeting Progress Report.
Winning with KEHA Roles and Responsibilities
Objectives All to explain what features are in a good chart
API SC 10, Work Group 13 Update:
THE GLOBAL HEALTH SERVICE PARTNERSHIP
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
WG on HTHP Rheology Winter 2016, austin, tx
Conducting Marketing Research
API SC 10, Work Group 3 Update:
Analysis by: Kevin Gallagher (PPG Industries) Sept 26, 2017
Moving Companies in VA Moving Companies in Washington DC.
مراجعة عامة.
2017 Exploration & Production Winter Standards Meeting
U. S. Department of Housing and Urban Development Database Adjustment (DBA) and Technical Reviews (TR) Birmingham Field Office April 18, 2018.
2016 Exploration & Production Standards Conference Subcommittee 10
Task Group on Mechanical Behavior of Cement
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
What causes weather? Weather is caused by differences in Temperature
Title: Heating Differences Lab
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Washington County System Review Project Overview
API RP 59 June 2017 Recommended Practice for Well Control Operations
STUDENT RESEARCH ASSISTANTS NEEDED!
Reading: ‘Washington, DC’
WG on Composite Cements: Calgary Meeting 2017
Patrick Lowe and Jyotishka Biswas
Roles & Responsibilities
Conducting Marketing Research
SC 18 Liaison Report Winter 2012
Unit 1 The importance of cells
Conducting Marketing Research
API SC6 Valves and Wellhead Equipment
Today Members Workgroup charge/ Current Status Discussion.
doc.: IEEE <doc#>
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
National level Objective:
Today Members Workgroup charge/ Current Status Discussion.
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

Deryck Williams – Chairman Rick Lukay – WG Lead

Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry (temperatures greater than 190F and/or pressures greater than atmospheric pressure) with the intention of the report serving as the basis for a NWI.

 Re-do round robin testing.  Collect and compile all test data for Washington DC.  Conduct another cement slurry round robin testing if required.

 Due to the Chairman’s work/travel schedule Rick Lukay has been assisting and has volunteered to lead the WG.  The cement slurry design developed by Chevron (Ronnie Williams – ETC, Cement Lab) was shipped and tested.