Intro to our Dexter Valley Team Andy Desmarais- Operations Manager Colin MacKinlay - Chief Estimator Kevin Bezanson – General Superintendent Matthew McLaren.

Slides:



Advertisements
Similar presentations
HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
Advertisements

A County of Los Angeles Case Study Fixing Faults With Limited Funds.
Sub-Grade Preparation-Equipment Caterpillar Paving Products
1 Cold planers Prestudy Jan 2009 / Jürgen Seemann.
2014 Chip Seal Training ODOT Specifications
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Highway Engineering Pavement Types
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Low Volume Road Solutions By: Jason Panter. Seal Coats What is a Seal Coat? – Thin surface treatments – Binder & Aggregates.
California Chip Seal Association 2007 Award of Excellence in Contracting Innovative Process Category International Surfacing Systems City of Antioch 2007.
Greening the Blacktop Going Green with Sustainable Asphalt RAP, Recycling, Energy and the Carbon Footprint.
Perpetual Pavements Concept and History Iowa Open House
Pavement Preservation and Maintenance Private Roads Maintenance Workshop August 18, 2012.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
Intro to our RoadRedi Team Trevor Chisholm- General Manager Patrick Grey- Estimator Steve Flemming- General Superintendant Pat Benoit- Superintendant.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Long-Term Durability of Full-Depth Reclamation using Portland Cement
The Future is Thin: Surface Mix Experience and Performance in the City of Ottawa Steve Goodman, M.Eng., P.Eng. Senior Pavement Engineer, City of Ottawa.
Pavement Design Terms and Concepts
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Surface Rehabilitation Treatments
Preventive Maintenance
HMA Pavement Recycling and Reconstruction
Session 3-6 HMA Overlays.
Highway Maintenance & Rehabilitation
Chapter 5 Patching and Edge Repair
Pavement Maintenance II
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Preservation Preventive Maintenance
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
April 19, 2005 PPTG Meeting Education Efforts for the PPTG How to share our knowledge and experience with others.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Pavement Types Dr. TALEB M. Al-ROUSAN.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Ultra Thin Bonded Wearing Coarse Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Full Depth Reclamation
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Pavement Maintenance and Microsurfacing Board of Aldermen Discussion Session January 26, 2010.
Protecting Your Pavement Investment Jeff Stokes. 4 R’s for Paving Success 1 Risk Management Identifying and minimizing your risk factors 2 Right Repair.
Extending Performance with Proper Asphalt Compaction
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Alabama Asphalt Pavement Association
Pavement Preservation Techniques Used in Virginia
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Pavement Maintenance and Microsurfacing
NanoSoil Nanotech Construction Products Limited.
Prime Factors for Successful Preservation Treatments
NRRA Pavement Workshop 2019
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Intro to our Dexter Valley Team Andy Desmarais- Operations Manager Colin MacKinlay - Chief Estimator Kevin Bezanson – General Superintendent Matthew McLaren – Projects Superintendent Andrew Mackintosh – Concrete/Special Projects George Spencer - Superintendent / QC Nick Greenough – Job Supervisor Christopher White – Projects Coordinator

Valley Division

DEXTER VALLEY DIVISION Services - Grading- Experience/Expertise - Paving/Asphalt- Excavation - Processing of Aggregates (Blasting/Crushing/Screening) - Concrete Work (Sidewalk/Curbs’ etc) - Quality Control- Trucking - Budgets- Pipe Work - Estimating- Material Supply - Traffic Control - Internal Engineering Team

Intro to our RoadRedi Team Trevor Chisholm- General Manager Patrick Grey- Estimator Steve Flemming- Superintendant Pat Benoit- Superintendant Carter Reilly- Superintendant Jeff Huntley- Project Manager

Intro to our GLC Team Simon Pianarosa - General Manager Chris Campbell- Operations Manager Shawn Gould – Customer Liaison Trevor Wheaton - Accounts Manager Bill O’Leary - Senior Advisor, Market and Product Development

The Right Treatment, to the Right Pavement, at the Right Time!

Why Preserve?

Pavement Preservation Allows you to change your approach: –Look for and correct small problems before they become big ones –Eliminate the "worst first" Practice

Pavement Preservation Pavement Preservation is efficient, effective and economical. Save money Improve safety Reduce delays Help pavement last longer Improve the performance of the entire road network

Doing It Right! The Right Pavement Relying on public complaints is to probably to late. Up to date pavement condition surveys are key

Doing It Right! The Right Time Preventative Maintenance needs to be completed in the early stages of the pavement’s Life. Move preventative maintenance up on the priority list.

Doing It Right! The Right Treatment Picking the proper treatment for the right level of distress. Here are some things to consider:

Doing It Right! The type of pavement The type, extent and severity of the pavement distress The age of the pavement (or the time since the last major rehabilitation) The type of the road - its use, volume, and traffic speed The availability of qualified contractors, construction technology; materials and qualified agency staff The time of year for maintenance How long maintenance will take and the impact it will have on drivers The pavement quality needed after the pavement has been treated.

Products for Pavement Preservation

Dust Suppression Ideal Application Dirt roads Dust sensitive areas Life Cycle (Years) 1 to 2

Fog Seal Ideal Application Dust Suppression Surface Oxidation Life Cycle (Years) 1 to 2

Single/Double Chip Seal Ideal Application Low to Med Traffic Volume roads Life Cycle (Years) 3 to 5

Chip Seal Variations Single Chip Seals Existing Pavement Pneumatic- Tired Roller Binder

Chip Seal Variations Double Chip Seals Existing Pavement Binder Pneumatic- Tired Roller Second Binder Application Pneumatic- Tired Roller

Micro Surfacing Ideal Application Town/City streets Highways Parking lot caps Life Cycle (Years) 7 to 8

HMA Thin Lifts (Polymer or standard) Ideal Application High volume roads Intersections Distressed pavement application Life Cycle (Years) 8 to 10

Products for Re-Construction

Double Chip Seal Ideal Application Low to Med volume streets Secondary or connector routes Life Cycle (Years) 5 to 7

Cape Seal Ideal Application Low to Med volume roads Estate or subdivisions streets Life Cycle (Years) 7 to 8

Emulsion Mix (Central Plant) Ideal Application Logistically challenging areas Areas where conventional equipment not available Roads needing full or partial reclamation Life Cycle (Years) 8 to 10

Emulsion Mix – Central Plant Mixing Simple Operation, Quick Set up, Long Shelf Life (weeks) vs hours for Hot Mix

Emulsion Mix –Mixing Blade Laid Dump, Spread and Compact

Emulsion Mix –Paver Lay-down No Fumes Time To Work with Product Simple Operation

Emulsion Mix Pavement provides excellent strength and logistics flexibility where traditional hot mix asphalt is too expensive. Utilize locally available aggregate or RAP Reduce haul rates

Hot Mix Asphalt (Standard or Polymer Modified) Ideal Application High volume roads, Parking Lots Streets Life Cycle (Years) 12 to 14

Types of Treatments/Typical Costs TreatmentsCosts $/M 2 Fog seals1.25 Chip seals4.00 Micro surfacing7.40 Emulsion Mix10.00 Thin hot mix overlays14.75 *Prices accurate at time of presentation, prices vary depending on conditions of work.

Typical Problems Standard Solutions

Cracking Cause: –Asphalt Shrinkage, Cold Temperatures, Shifting Underlaying Solution: –Crack Sealant –And / Or followed by Chip Seal, Slurry or other surface –Partial or full depth reclamation

Rutting Causes: –Traffic and Heat –Weak Subgrade –Mix Type Solutions –Microsurfacing for minor rutting –Milling –Polymer Asphalt for busy intersections

Ravelling Causes: –Aging Pavement –Low Compaction / Placed late in season –Sub-base Issue –Segregated Un-Even Mixtures Solutions: –Fog Seal –Chip Seals –Microsurfacing –Slurry Seals –Emulsion Mix

Complete Failure Causes: - Lack of Maintenance -Poor sub grade -Under designed Solutions: -Mill Back to Gravel -Full-Depth Recycling

Example of a Staged Re-construction 1 km long 6.6m Wide6.6m X 1000= 6600m 2 Scenario: Asphalt street complete failure.

Example of a Staged Re-construction Scenario: Asphalt street complete failure. YearWorkMaintenance 1Pulverize back to granular, re-grade and Compact Dust Suppressant, Re-grade as needed 2Chip SealStandard town maintenance 3Fog SealStandard town maintenance 4NoneFog Re-Applied if necessary 5Micro Seal/Hot MixStandard town maintenance

Example of a Staged Re-construction Scenario: Asphalt street complete failure. Year Price Per M 2 Price Per Year (6600m 2 )Totals 1Pulverize$1.25$8, Grading$1.20$7, Dust Suppressant $1.00$6,600.00$22, Chip Seal$4.00$26,400.00$49, Fog Seal$1.25$8,250.00$57, NothingN/A $57, Micro Seal$7.40$48,840.00$106, or 5Hot Mix$14.75$97,350.00$154,770.00

Total job costs= $106, Over Five years Example of a Staged Re-construction

Real World Examples

Projects MacDonald Bridge – 2011 – Microsurfacing

Projects ChipSeal – Aylesford Rd

Projects Hwy 103 Microsurfacing

Projects Night Work – Slurry Seal – Portland Bridge – Minimizes Disruptions to Traffic Flow

Thank You!