EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.

Slides:



Advertisements
Similar presentations
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
Advertisements

ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
Operational applications enabled by ADS-B
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Imbedded SSR Mode-S Logic Control Unit University of Stellenbosch Department of Electrical & Electronic Engineering K. Gastrow 4 December 2009.
Enabling technologies Pierre GAYRAUD THALES Avionics ASAS-TN Seminar Brighton October 2004.
ASAS TN Third Workshop, April 2004, Toulouse 1 ASAS Implementation in Avionics Pierre GAYRAUD Thales Avionics in collaboration with ACSS.
Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Bob.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Automatic Dependent Surveillance – Broadcast (ADS-B) What is it, and how can it help improve operations in Micronesia? Captain Rocky Stone Chief Surveillance.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Sense & Avoid for UAV Systems
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
Air Traffic Control System Team #3. Introduction The purpose of air-traffic control is to assure safe separation between en-route aircraft and the safe.
ADS-B Update As of 6 April 2015 EAA Chapter 1457.
Stand August 2007 ADS-B Avionics for General Aviation Euro Telematik AG Riedweg 5, D Ulm Tel. +49 (0)731/
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
GNSS Aviation Applications
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Lecture 3: Air Traffic Control Tower
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
ADS-B Technology Overview
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OSED CARE-ASAS Activity 3: ASM Time-Based Sequencing OSED.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
© 2015 Noblis, Inc. Jonathan Hammer Modeling for Verification and Validation Workshop, FAA WJHTC Monte Carlo Modeling Techniques in FAA Systems Development.
Christos Rekkas ADS Programme Manager EUROCONTROL
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
ADS-B Out, In and GNSS Requirements Update
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Unit-3 FLIGHT INFORMATION SYSTEMS
Workshop on preparations for ANConf/12 − ASBU methodology
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
Workshop on preparations for ANConf/12 − ASBU methodology
Capabilities of TIS-B for Supporting ASAS
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
ICAO ACP WG-N meeting Use of IP in ARTAS
Presentation transcript:

eDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme

Contents  Introduction to ADS-B  ADS-B Validation/Trials  AVT (ADS-B Validation Test Platform)  eDEP in AVT  eDEP at local validation sites

Introduction to ADS-B Automatic Dependent Surveillance – Broadcast ADS-B Ground Stations Position Velocity Identity Altitude Heading Vertical Rate Accuracy/Integrity ACAS data Emergency Status and SPI Selected altitude

Distinctive ADS-B Features Radar TypeCo- operative (Needs on- board equipment) Dependent (Depends on on-board equipment for position) Primary  SSR (Mode- C)  Mode-S  ADS-B Price Ease of Installation Low Maintenance High Position Accuracy Depends on aircraft equipment  Security issues  Air-borne Surveillance

ADS-B Applications  Ground Surveillance Applications (ADS-B-out) ADS-B Receiver  In a non-radar environment (NRA)  In a radar environment (RAD)  On the airport surface (APT)  Airborne Derived Data (ADD)  Airborne Surveillance Applications (ADS-B-in)  Situational awareness on the surface (SURF)  Airborne situational awareness (AIRB)  Visual separation on approach (VSA)  In Trail Procedure (ITP)  Sequencing & Merging (S+M)

ADS-B Implementation Roadmap NRA: In Non-Radar Airspace RAD: In Radar Airspace VSA: Visual Separation in Approach ITP: In Trail Procedure APT or SURF: On the Airport Surface ADD: Aircraft Derived Data for ground tools AIRB: During flight operations S+M: Sequencing and Merging ADS-B-NRA ADS-B-RAD ATSAW-VSA ATSAW-ITP ADS-B-APT ADS-B-ADD ATSAW-AIRB ATSAW-SURF ASAS-S+M Pre-Ops Validation Implementation Pre-Ops Validation Implementation Pre-Ops Validation Implementation Initial Validation

Trials 12 ANSPs 400+ aircraft 500,000 flights/year + GA

ADS-B in Europe

AVT Introduction – What is AVT ?  ADS-B/TIS-B Validation Test  A surveillance platform modeling the future European ATC surveillance system  Real-Time Surveillance Data Processing  Data Analysis Tools  Standard Interfaces (ASTERIX) to:  Air Traffic Simulators  ATC Systems  External Surveillance sensors  In order to support CASCADE in:  ADS-B/TIS-B Technology verification  ADS-B/TIS-B Application validation

AVT Technical Capabilities Surveillance Simulator + TG ADS-B equipped aircraft AVT Core External Aircraft Simulators External Surveillance Systems FDPS/CWP Systems eDEP

eDEP in AVT CWP  Live Surveillance Data Processing  ASTERIX CAT062 (System Tracks / Tracker Output))  ASTERIX CAT021 (ADS-B data / Ground Station Output)  Multi-stream display  Simultaneous display of multiple sources  Independent track stores  Flight Search and Highlight Function  Search criteria : Callsign, SSR Code, Mode-S Address

eDEP in AVT Pilot Manager  ASTERIX CAT244 Output to Surveillance Sensor Simulator  For each simulated aircraft  De-coupling of Pilot position and CWP

eDEP in AVT eCockpit  ASTERIX CAT244 Output to Surveillance Sensor Simulator  ASTERIX CAT021 Input for display on Navigation Display  To simulate ADS-B Reception  ASTERIX CAT062 Input for display on Navigation Display  To simulate TIS-B Reception

eDEP in AVT eCockpit

eDEP at local validation sites  Validation Infrastructure based on AVT is installed at local validation sites  eDEP currently installed and used for pre-operational validation  Rhodes (Greece)  Trabzon (Turkey)  eDEP planned to be used  Faial (Azores) and Lisbon

eDEP at Rhodes APP Positions

eDEP in Trabzon Tower

Future Development  ADS/B APT Validation  Need for Airport maps and HMI.  Seek synergy with airport eDEP HMI implementations.  Process ASTERIX A-SMGCS data  Process ASTERIX Multi-Lat Data

Thanks for your attention