From Island Estates Parkway to St. Johns County Line
Gene Varano FDOT District S. Woodland Blvd., M/S 542 Deland, FL (386)
Length = 8.4 miles Existing = 2 to 4 lanes Milling and resurfacing No additional travel lanes Marked bicycle lanes throughout project limits on existing shoulders Proposed sidewalk in Marineland Implement Marineland Traffic Study Construction Cost Estimate ≈ $5 million Begin Project End Project North
Provide 5’ bike lanes Correct roadway cross slopes
Provide 5’ bike lanes Correct roadway cross slopes
Keep 5’ bike lanes Provide sidewalk from UF lab to Marineland entrance
Traffic Operational and Speed Zone Study Findings: 1. Pedestrian traffic signal at Marineland Entrance will be removed. 2. The pedestrian cross signs and crosswalk will be updated to meet current design standards. 3. Revise speed limit from 30 mph to 35 mph.
The non-functioning traffic signal at the Marineland Entrance will be removed. Remove the flashers from the advance pedestrian warning signs.
Reconstruct existing sidewalk Extend sidewalk to Marineland entrance Tie into existing pedestrian features and walkways Special emphasis crosswalk at entrance North Marineland Entrance UF Lab
During Construction: Minimize Impacts to the Traveling Public. Minimize Noise. Minimum lane width shall be 10 feet. Existing speed limits shall remain during construction. Access to be maintained to all Developments during construction.
Plans Completed Date March 1, 2012 Contract Letting Date July 25, 2012 Construction Start Late Summer/Fall 2012