MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert.

Slides:



Advertisements
Similar presentations
Sustainable Low Cost Shelter Design Shelter Options By Prakash M Apte Urban Development Consultant.
Advertisements

ERU EMERGENCY RESPONSE UNITS
E8 WASH Cluster – Emergency Training E 1 Excreta Disposal in Emergencies Session 8 Operation & Maintenance.
SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT.
Health Care Society Achievements in Pictures
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Farmworker Housing Inspections Unit 3: Conducting the Inspection.
E9 WASH Cluster – Emergency Training E 1 Excreta Disposal in Emergencies Session 9 Institutional Sanitation and Sewerage Systems.
Images and text from HKT Architects – Project Architects.
SPEAKERS: Dr Deane Marchbein, MSF-USA President of the Board of Directors MSF missions: Ya-Ching Lin, Project Coordinator and Epidemiologist MSF missions:
Class Day Seventeen.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
5/21/20151 Using the Minimum Standards in Shelter, Settlement and Non-food Items (NFI) 3.2 People standing amid the rubble of collapsed houses in Port-
Infrastructure Development, Energy, WASH and Shelter program.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
UNHCR/e-Centre/InterWorks - Emergency Management Training Session 7.1. Assessment 3: Working with Sectoral Indicators - Water & Sanitation International.
TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
NOT FOR PUBLIC DISTRIBUTION HABITAT FOR HUMANITY’S Santo Development – Léogâne, Haiti.
Constructing Homes and Other Buildings
Building the Houses Sri Lanka Tsunami Reconstruction Project in
U.S. Chamber of Commerce: Post Tsunami Reconstruction- Sri Lanka Country Assessment Tuesday January 18 th 2005 by H.E. Devinda R. Subasinghe Ambassador.
Design Features Structure Concrete slab floor (27’x25’x3”, 6.25 cu yards) Walls created with mud bricks (dry season) or concrete blocks (wet season) Aluminum.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Issues of Sanitation Definition and the MDGs. Coverage Figures According to the 2008 Ghana Demographic Health Survey (GDHS) report Only 12.4 percent of.
H umanitarian R esponse in S indh Update as of: 9 March 2011.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
2.01 Housing Options Sherry Brooks David W. Butler April 28, 2009.
IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.
FORMS, SCAFFOLDING and STAGING
Emergency WASH trainers MHM toolkit Laminated cards.
HOUSING. Specification Housing generally secures some basic human needs, such as shelter, safety and privacy. Permanent housing is also a condition for.
Key Response…… RELIEF & CP 10,500 families received shelter and relief item (NFI-6000 & 4500 emergency shelter) 500 transitional shelter More 7376 families.
NFI and shade booklet 1 South Asia earthquake Some exemple of MSF response 2 NFI Why NFI in MSF ? Working group New kits 3 Shade net Booklet The process.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
South Sudan Emergency Response 2014 Robust Shelter Construction.
Shelter Cluster Meeting Bangladesh 4 September 2014.
17 Nov 2006.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
Water Logging in Keshabpur: A Focus to the Coping Strategies of the People by Neelopal Adri Royal Holloway, University of London.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
WASH Cluster Update 7/12/11 WASH CLUSTER PAKISTAN.
MODULAR CONTAINERS OF SANDWICH PANELS. At the present, more and more increasing significance of modular construction. Every year modular houses from sandwich.
South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE.
Emergency Items WFP Logistics, We Deliver.
A HOUSE.
every one deserves a decent place to live.
Sherry Brooks David W. Butler April 28, 2009
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Emergency Cycle – Exercise Materials
Shelter and WASH Working Group Meeting Thursday 13 July, 10AM
Temporary Works – P8 Project Practice.
Shyamaghat Rainwater Model Project
AR-315 BUILDING CODES & BYE LAWS
National Statistics on housing in vanuatu
FLOATING STUDENT RESIDENCE
HOUSING Khizar Nabeel Ali.
DO’s and DON’Ts of toilet construction
International Building Materials and components
Designing the tiny house
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
Refugee Housing Unit PROJECT PRESENTATION IN SHELTER CENTRE
Transit and influx management
REFUGEE HOUSING UNIT RESEARCH AND DEVELOPMENT PROJECT
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.
Presentation transcript:

MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert

BEFORE

Therapeutic feeding centre

Construction of a sleeping room shelter Dimensions: 2 x (6x12)m Dimensions: 2 x (6x12)m Capacity: 2 x 24 beneficiaries Capacity: 2 x 24 beneficiaries Shading area for consultation Shading area for consultation Construction time: 2 days with 2 teams of 11 workers Construction time: 2 days with 2 teams of 11 workers

Chainsaw work Preparation of wooden poles kits. Preparation of wooden poles kits. Fenced working area Fenced working area Maximum 3 to 4 persons in this area Maximum 3 to 4 persons in this area

Wooden poles set-up Ground levelling Ground levelling Same length wooden poles Same length wooden poles Poles alignment with ropes Poles alignment with ropes

Truss Pre-cut poles Pre-cut poles Alignment with rope Alignment with rope Installation of rafters Installation of rafters

Front waiting area

Interior Ventilations Ventilations Floor to be installed Floor to be installed

Rain water drainage

Overall view

Other constructions Latrines Latrines Dinning room Dinning room Kitchen Kitchen Stock Stock Registration area Registration area Water tank area Water tank area

Latrines

Dinning room

Kitchen

Stock

Registration area

Water tank area

Some close-up Oven Oven Brick floor Brick floor Natural lighting Natural lighting Plastic sheeting fixation Plastic sheeting fixation

Oven

Brick floor

Natural lighting

Plastic sheeting fixation

Towards permanent building MSF-CH, Ryad refugee camp, Darfur, Sudan

Metallic truss Dimension 6 x 10 m = 60 m2, Dimension 6 x 10 m = 60 m2, Price 5’750 usd (95 usd / m2) Price 5’750 usd (95 usd / m2) Brick floor + cement plastering Brick floor + cement plastering Brick wall up to 140 cm / RoofingIron sheet Brick wall up to 140 cm / RoofingIron sheet Delay: 10 structures achieved in 3 month Delay: 10 structures achieved in 3 month

Brick walls

Interior IN PATIENT Kerenek (west Darfur) IN PATIENT Kerenek (west Darfur)

Interior Maternity (Ryad camp, El geneina) Maternity (Ryad camp, El geneina)

Final result Feeding Center (Ryad camp, El geneina) Feeding Center (Ryad camp, El geneina)

Post-Tsunami emergency shelters MSF-CH Sri Lanka 2005

The project Construction program of 66 semi-permanent houses consisting of a 28m2 living space, situated in Rekawa, Wellodaya and Rana (Division of Tagalla, province of Hambantota). Construction program of 66 semi-permanent houses consisting of a 28m2 living space, situated in Rekawa, Wellodaya and Rana (Division of Tagalla, province of Hambantota). 44 were established on government provided lands whilst the remaining where established on private lands in a accordance to the preference of the beneficiaries. 44 were established on government provided lands whilst the remaining where established on private lands in a accordance to the preference of the beneficiaries.

Sanitation Permanent showers and toilets were constructed per each semi-permanent house for better hygiene and family privacy. Permanent showers and toilets were constructed per each semi-permanent house for better hygiene and family privacy. The families also received NFI kits for replacing some of their lost items, which ranged from beds to cooking facilities. The families also received NFI kits for replacing some of their lost items, which ranged from beds to cooking facilities.

Construction materials One semi-permanent structure consisted of: A wooden structure poles and trusses A wooden structure poles and trusses A cemented metal mesh reinforced slab A cemented metal mesh reinforced slab An iron sheet roof and iron sheeting around the kitchen. An iron sheet roof and iron sheeting around the kitchen. Temporary walls of plastic sheeting Temporary walls of plastic sheeting

Design

3’ ¼ (aprox. 100 cm) 8’ ½ (aprox. 255 cm) 3’ ¼ (aprox. 100 cm) 10’ (aprox. 300 cm) 1’ ½ (aprox. 45 cm) Roof Truss 13’ ( 396 cm) 26’5” ( cm) Roof Truss Poles 7’ ( 213 cm) 6’ ( 183 cm) 10’ ( aprox 400 cm) Cement Block 23’ ( 701 cm) KITCHEN (8 m2) LIVING ( 20 m2) SEMI PERMANENT FAMILY SHELTER ( HAMBATOTA DISTRICT SRI LANKA)

Wooden truss

Final result

Prefabricated modules for health structures

Some data: Modular structure (3 to 5 containers of 20 feet, or more…) Modular structure (3 to 5 containers of 20 feet, or more…) Very high response for hygiene conditions (possibility of operating theatre) Very high response for hygiene conditions (possibility of operating theatre) Cost: +/ € for a 5 containers (ready to ship) = +/- 400 €/m² Cost: +/ € for a 5 containers (ready to ship) = +/- 400 €/m² Logistic constraints: 4 weeks delay for manufacture, need a crane, 6 days to setup the structure Logistic constraints: 4 weeks delay for manufacture, need a crane, 6 days to setup the structure

Prefabricated modules for health structures Different uses: After earthquakes: dialyse activities After earthquakes: dialyse activities When long term building not allowed ex: AIDS treatment for sex workers, culturally not accepted… When long term building not allowed ex: AIDS treatment for sex workers, culturally not accepted… Operating theatre, … Operating theatre, …