BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.

Slides:



Advertisements
Similar presentations
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
Advertisements

Business and Legal Issues in Developing Vacant Land and Underutilized Existing Buildings Jeffrey G. Wright Nixon Peabody LLP June 28, 2007.
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Commercial Bank Operations
($ billion) Engineering Regulatory Compliance Land Use Finance Project Development.
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Navigating your entitlement to buy and/or sell a residence under Permanent Change of Station orders.
Renewable Energy Facilities for North Carolina What needs to be filed with the N. C. Utilities Commission? Jay Lucas, PE Public Staff – NC Utilities Commission.
Initial Joint Proposal of Constellation Energy, the Solar Alliance, and RESA to Improve Pipeline Transparency November 2, 2011.
University of Pittsburgh School of Law 2013 Energy Law & Policy Institute October 14, 2012 Citizens for Pennsylvania’s Future (PennFuture). A statewide.
South Boston Energy Project South Boston, VA
Carbon Footprint / Life Cycle Analysis September 29, 2009.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Net Metering and Interconnection Requirements IMUA 2015 Annual Conference May 8, 2015 Delia Patterson General Counsel, APPA.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Taxation & Other Revenue at the State & Local Level J. Worley Civics.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Small Farm Profitability: Is Wind Energy the Answer? 1
Genesis Solar Module Brochure ™
Topics to Cover Interconnection Process Overview
Citizens’ Academy Kathy Viehe GRU Interim General Manager April 15, 2015.
Negotiating Wind Park Easements and Analyzing Comparable Sales presented by Justin Bierschwale Bierschwale Appraisals PO Box College Street Junction,
2011 PK Mwangi Global Consulting Financing your business The key to acquiring funding will depend on the structuring and presentation of the business plan.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Faisal Vellani Austin Berliner Sharda Sharma Mariana Nardon Sinan Pismisoglu July 20, 2009.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
California’s Renewable Energy Credits (REC) Market Update
Pasadena Water and Power APPROVE A PROJECT CONTINGENCY AMOUNT OF $2,500,000 FOR EXISTING CONTRACTS RELATED TO THE LOCAL GENERATION REPOWERING PROJECT -
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
Overcoming Barriers Expanding the Market for Small Wind Energy Systems Small Wind 102: Economics Making the numbers work Small Wind 103: Siting Issues.
12/5/2003Global Energy Concepts, LLC1 of 11 Characteristics of Financeable Wind Energy Projects Northwest Power and Conservation Council Workshop on Wind.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
Cost of Going Solar in DC 4 Ways to Save! 1.DC Rebate $3/watt up to 3KW…. 2.Federal Tax Credit 30% of Total 3.Savings on your energy Bill (Net Metering.
Leasing. Leasing is a process by which a firm can obtain the use of a certain fixed assets for which it must pay a series of contractual, periodic, tax.
Michigan Public Service Commission Renewable Energy Overview 2011 GLREA Energy Fair Jesse Harlow Engineer, Renewable Energy Section Michigan Public Service.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
Application for New or Different Service South San Joaquin Irrigation District (SSJID) Case Study San Joaquin LAFCo CALAFCO 2010 Annual Conference October.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
Leasing and Rental Program For Pion Equipment Pion Financial Services “Making Equipment Acquisition Easy” Financial Services.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Merchandise Inventory Account  A merchandising business  buys goods and then sells them to customers (retailers and/or wholesalers) for a profit  Retailer.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Philippine Feed-In Tariff System Implementation 1.
1. »Are vital because a business cannot exist without cash flow »Focus on the following: –creating up-to-date, accurate financial statements –making a.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
State of Solar in North Carolina Amy Heinemann March 7,
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Property Assessed Clean Energy (PACE): Overview & Tax Assessments
33 South Sixth Street, Suite 4200
Key risks and challenges of VAT
Commercial Bank Operations
Financing Land Development Projects
PEPCO Energy here Used there
Solar Energy Commercialization Session 11
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Renewable Power to Fuels Symposium - May
Presentation transcript:

BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA

Achievability Attainable Feasible Possible Profitable

Regulation / Financing Financial Models – discussed later Regulatory Documents Needed – Local / County – State – Federal – Utility

Regulation Local / County Community Acceptance Noise Zoning Water / Air (some counties) Waste Building permits Electrical inspection

Regulation / State Environmental – Air – Water – Utility Commission – Proposed Project Approval – Renewable Energy Registration (REC) –

Regulation / Federal EPA – Water – Air – Environmental Assessment Federal Energy Regulatory Commission – Qualified Facilities – Energy Information Administration

Regulation / Utility Interconnection – Proposed Project – Detail Design – Various Approvals Purchase Power Agreement – Buy all / Sale all – Net Metering – May include REC purchase agreement

Interconnection How-To Complete Attachment 2 of NC Interconnection Request – Application Fee – Electrical One-Line Diagram – identify all equipment size and name – Disconnect switch – Attached proof of insurance (general liability) Certificate of Public Convenience and Necessity for larger than 2 MW – all others file a proposed construction report with NCUC Contact DENR of environmental requirements Project tracked in the NCRETS need to file Registration Document Facilities larger than 1 MW must file with FERC If energy is being sold: Purchase Power Agreement Projects must be inspected by utility and have required electrical inspections

Interconnection Larger than 2MW Will require going through the Study Process – Feasibility Study, – Impact Study, and/or – Facilities Study Once the Interconnection Request has been filed and accepted a Scoping meeting with utility will be called. Customer and Utility agree on the need for one or more Studies. Utility will send the appropriate Study agreement (s) with scope of work and estimated of cost.

Financing Cost Sharing / Grants Tax Credits Revenue – Sale / Trade Renewable Energy Credits – Sale / Trade Carbon Credits – Fertilizer – Feedstock Payments (Tipping Fee) Banks – Land use Agreement with Owner – Regulatory Documents – Cost Analysis / Cash Flow

Renewable Models Electricity – Sale all generated – Used at the facility with excess sold – Used by third party through a lease arrangement Gas – Sold to someone with a generator – Used at a facility – Used for transportation

Profitable Achievability – Compliance with Regulation at all levels City, County, State, Federal – Obtain Revenue Contracts REC, Carbon Credits, Energy, Tax Credits – Meet Investors Requirements

QUESTIONS Ollie Frazier