4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.

Slides:



Advertisements
Similar presentations
Potential East Side Homeless Drop-in Center Update March 20, 2012.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Comparative Analysis Two Potential Sites for a New High School.
Employee Services – Space Requirements
Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013.
BEDFORD FACTS: Bedford Development Department: Planning and Zoning Economic Development Tourism Permits and Inspections Code Enforcement Bedford Facts:
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
Tax Increment Financing Town Center Project Midwest City, OK.
Proposal of “Splendora Plaza” in Splendora, Texas Nov acres property in Splendora, Texas, with Beautiful US Route 59/69 frontage, will be developed.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Facilities Management and Design
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
El Cajon Courtyard Excel Hotel Group July 1, 2014.
Finance and Administration Advisory Group June 30, 2010.
Blue Prints.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
St. Albans Guide to the Rewrite Process PUBLIC FORUM: ST. ALBANS BAY DISTRICT & STATE VILLAGE DESIGNATION.
May 24, 2008PalmRidge Park A Mixed-Use Real Estate Property for Sale in McAllen, TX.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
FOR SALE For More Information: 526 North La Cienega Blvd. West Hollywood, CA ,760 square feet of single story improvements constructed in ,992.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Welcome!. Strategic Development and Facility Master Planning Board Approved in October 2010 Hot Springs County Memorial Hospital.
David M. Maroney, AIA/NCARB. 2 BuildingAddition RoadCourse.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Proposal of “Splendora Plaza” in Splendora, Texas Nov acres property in Splendora, Texas, with Beautiful US Route 59/69 frontage, will be developed.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
Public Works/City Hall City Council Workshop Monday, December 23 rd 5:30 p.m. 1.
Speakman Place David Holden The Ingerman Group. Speakman Place Cornerstone West and The Ingerman Group collaborated to redevelop the former Speakman Company.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Ordinance No. 480-GGGG Assisted Living Facilities Item 4B.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Forsyth County 2016 Bond Referendum
CITY OF STOCKTON PLANNING COMMISSION
CFT Gateway Center ( E. Foothill Blvd
Design of a Commercial Shopping Center
Architecture ~ Architectural Plans ~
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Single Family Homes Townhouses Condominiums Mobile Homes Rentals
Silver Lake Regional High School
Valley & Third Streets Redevelopment
Town of Newbury Proposed New Fire Station
INDUSTRIAL / COMMERCIAL Facility For Lease
Call Today for More Details – Make an Appointment to See It!
2007 Bond Issue Capital Improvement Program
Fair Lawn BOE: Concept Planning
PUBLIC HEARING Stockton City Council June 6, 2006
NEW MEDICAL FACILITY BUILDING
254 East Union Street Pre Development Plan Review
Continuing challenges regarding previous “findings” :
         Metro Medical Campus Building III 1630 Campus Drive, Monroe, NC
Creating Streetscapes With Conventional Zoning
Executive Vice President
Town Center at Remington Park
Presentation transcript:

4900 S ROUTE 31 CRYSTAL LAKE 1

AERIAL 2

PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group

PROPERTY HISTORY 4 Originally an 80+ Acre Site Now 10 +/- Acres after Sale of Excess Land to Ryland Homes

PROPERTY FACTS 5 24,000 SF Divided into Two Wings North Wing -- Emergency Care South Wing -- Medical Offices

PROPERTY FACTS 6 Three Lighted Parking Lots Parking Spaces Plus Handicap Front Spaces plus 4 HC Side Spaces Back Spaces plus 4 HC

PARKING LOT LOCATIONS 7

FRONT PARKING LOT 8

SIDE PARKING LOT 9

PROPERTY FACTS 10 Three Parking Lots – 118 Parking Spaces 660 Feet of Frontage on Route 31

PROPERTY FACTS 11 Three Parking Lots Parking Spaces 660 Feet of Frontage on Route 31 New Route 31 Access Constructed by Ryland Homes

PROPERTY FACTS 12 Three Parking Lots Parking Spaces 660 Feet of Frontage on Route 31 New Route 31 Access Constructed by Ryland Homes Traffic Signal Approved by IDOT and Funded by Ryland Homes

AERIAL – ROUTE 31 13

PROPERTY FACTS 14 Three Parking Lots Parking Spaces 660 Feet of Frontage on Route 31 New Route 31 Access Constructed by Ryland Homes Traffic Signal Approved by IDOT and Funded By Ryland Homes City Water and Sanitary Sewer Service

FINANCIAL 15 $3,850, Original Asking Price -- $160 per SF $2,500, Current Asking Price -- $104 per SF For Sale Only / Land Not Divisible

FLOOR PLANS 16 Current Layout as Used by Sherman Hospital Perimeter Dimensions / Bay Sizes / Column Locations Architectural Cut Sheet

CURRENT USE LAYOUT 17

DIMENSIONS AND COLUMNS 18

ARCHITECT CUT SHEET 19

EXTERIOR PICTURES 20 Front of Building Rear of Building

LOBBY 21

LOBBY 22

DOCTOR OFFICES 23

DOCTOR OFFICES 24

DOCTOR OFFICES 25

EMERGENCY ROOM AREA 26

EQUIPMENT AREAS 27

EQUIPMENT AREAS 28

MECHANICAL ROOM 29

RECORDS ROOM 30

ATRIUM 31

NURSING CURRICULUM 32

GOALS AND VISION 33 Create a Medical Learning Center – Self Contained Facility – Comprehensive Educational Resources – Simulation Areas for OJT – Laboratories – Equipment Training Areas

PRIMARY REQUIREMENTS 34 Traditional Class Rooms – Medical and General Classrooms – 600 to 1,000 SF State of the Art Laboratories and Equipment Training Rooms

SIMULATION AREAS 35 Emergency -- Ambulance Bay -- Triage Areas Hospital Floor -- Hospital Rooms -- Nurses Station Medical Office

ANCILLARY NEEDS 36 Resource Center (Library) Student Lounge with Internet and Vending Administration Offices Storage Rooms Restrooms Mechanical Rooms

CONCEPTUAL PLAN 37

PROPERTY BENEFITS 38 Favorable Pricing -- Asking Price of $2.5 Million -- Versus Cost to Rebuild

PROPERTY BENEFITS 39 Favorable Pricing Structural Layout -- Column Placements -- Division into Two Wings

PROPERTY BENEFITS 40 Favorable Pricing Structural Layout Location Convenience and Accessibility -- Route 31 Frontage -- Pending Traffic Light

PROPERTY BENEFITS 41 Pricing Structural Layout Location Significant Expansion Capabilities -- Building -- Parking Lots

PROPERTY BENEFITS 42 Pricing Structural Layout Location Room for Expansion Simulation and OJT

PROPERTY BENEFITS 43 Pricing Structural Layout Location Room for Expansion Simulation and OJT Liaisons Opportunities

Q & A 44 Michael Deacon RVG Commercial Realty