Executive Overview Arshad Hafeez, Industry-Managed Program Director Integrating NADCAP Core Values into Special Process Supplier.

Slides:



Advertisements
Similar presentations
I work in tribology and am lost in data. How can I make my job easier? Three parts to this project 1.A Review of ASM Handbook Volume 5 2.A summary of a.
Advertisements

MODULE B - PROCESS B1.ASME Organizational Structure B2.Standards Development: Staff and Volunteer Roles and Responsibilities B3.Conformity Assessment:
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Defense Contract Management Agency Quality Assurance Directorate Presented By: Michael Shields Executive Director, Quality Assurance March 15 th, 2011.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
CWBGROUP WEAREWELDING OCTOBER 2014 CWBGROUP CERTIFICATION MEMBERSHIP EDUCATION PUBLIC SAFETY.
1 Strategy Implementation  What must we do to put the strategy in place, execute it proficiently, and produce good results?  Creating FITS between strategy.
ASME Nuclear Conformity Assessment
Performance Review Institute
Accredited Third Party Certification and Food Safety Management Systems Jill Hollingsworth, DVM Group Vice President Food Marketing Institute.
AGENDA Nadcap Overview Organizational Structure of Nadcap Nadcap Process / eAuditNet.
Nadcap SUPPLIER TUTORIAL Thomas Newton Aircraft X-Ray Laboratories Supplier Support Committee Leadership Team Chair Paul Evans James Fisher Nuclear Limited.
1 STAMP, INC. (Safety Training Accreditation Management Process)
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
4. Quality Management System (QMS)
CPA is a UKAS company The Assessment Process 2014 Seminars.
1 COORDINATION of QUALITY CONCERNS for the AMERICAN AEROSPACE INDUSTRY Jack Fletcher Senior Quality Technical Fellow Lockheed Martin Corp. NASA QLF Sept.
1 Performance Review Institute Annual Leadership Seminar January 24-25, 2002.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
Supplier Introduction & Tutorial 17 February 2009 Presenter David Michaud, SSC LT Chair.
GE Aviation. 2 Overview GE - Aviation GE Aviation A leading manufacturer of jet engines for civil and military aircraft and global provider of maintenance.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
SAE and PRI: Standards and Compliance in the Aerospace Industry Presented by Hannah Godfrey eQuaLearn Coordinator-Europe, PRI October
PRESENTED BY ILAMVAZHUTHI.C 1 Under the guidance of Mr.S.CHOKALINGAM M.E (Assistant professor) DEPARTMENT OF MECHANICAL ENGINEERING E.G.S.PILLAY ENGINEERING.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Selection Criteria Properties Availability Cost Manufacturability
International Aerospace Quality Group (IAQG) Informational Overview 28th June 2001 Gary Baker ~ Americas Sector Leader ~
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Nadcap SUPPLIER TUTORIAL Eric Jacklin F.M. Callahan & Son, Inc. Supplier Support Committee Leadership Team Chair Paul Evans James Fisher Nuclear Limited.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
1 SAE AIR5359A Requirements for Registration of Quality Systems to AS9100 Nik Sutton Boeing IDS This briefing contains non technical data reviewed by Export.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
African Regional Director
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
International Aerospace Quality Group (IAQG) Informational Overview March 2002 Gary Baker Americas Sector Leader International Aerospace Quality Group.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
FRICTION WELDING. Friction Welding Friction Welding is a Solid State Welding process, in which two cylindrical parts are brought in contact by a friction.
Performance Review Institute Qualified Products Listing
Nick Sykes Lean Six Sigma Black Belt 10/01/12. Company Overview  Awarded SEA’s Leadership & Culture, Leadership Excellence, Supply Chain Innovation,
Dale Harmon Cincinnati Thermal Spray, Inc
Nadcap TASK GROUPS Special Processes – Nondestructive Testing (NDT) Chair: David Royce, Pratt & Whitney – Materials Testing Laboratories (MTL) Chair:
1 IAQG Oversight Team Report (Other Party Management Team) (Abridged Version - mcr) Amsterdam – April 27 th, 2005 Julio Perez Caballero IAQG OPMT Chair.
Quality Assurance and Risk Management Services, Inc. 
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
Nadcap Supplier Seminar Heat Treatment
SURFACE TREATMENT AN OVERVIEW
EECS David C. Chan1 Computer Security Management Session 1 How IT Affects Risks and Assurance.
Executive Overview Arshad Hafeez, Industry-Managed Program Director
COORDINATION of QUALITY CONCERNS for the AMERICAN AEROSPACE INDUSTRY
Overview of SAE’s AS6500 “Manufacturing Management Program”
Standards and Certification Training
International Aerospace Quality Group (IAQG)
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
Nadcap auditors are acknowledged throughout the industry as experts in their field. As you can see, many of them are highly qualified and experienced individuals.
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
On this slide you can see the organisation structure.
Dennis Harwig and Bill Mohr, EWI
The Value of Accreditation
This graphic describes the Nadcap audit process This graphic describes the Nadcap audit process. Subscriber actions are shown in red, Suppliers’ in.
In 1985, a conference in the USA brought together government and industry to discuss supplier quality. They recommended a more efficient, consensus solution.
Presentation transcript:

Executive Overview Arshad Hafeez, Industry-Managed Program Director Integrating NADCAP Core Values into Special Process Supplier Management September 25, 2002

PRI Origins SAE Standards PRI AUTO QPMC AERO OFF- HIGHWAY NADCAP ISO/QS REGISTRAR ORIGINS Affiliation with SAE (Society of Automotive Engineers)

Performance Review Institute’s (PRI’s) History  : Development of NADCAP at SAE  July 1990: PRI incorporated as a Not-For-Profit Trade Association. Launch NADCAP for Aerospace  November 1995: PRI accredited by RAB (Registrar Accreditation Board)\March 1996: PRI accredited by RvA (Raad voor Accreditatie)  July 2000: Roll-out of NADCAP Europe, Derby England  July 2002: Roll-out of eAuditNet, Derby, England meeting

NADCAP Members NADCAP Northrop Grumman Integrated Systems The Boeing Company DCMA Fiatavio, Italy Lockheed Martin MTU Aero Engines, Germany Pratt & Whitney, Canada Pratt & Whitney, East Hartford Raytheon/Beechcraft Sikorsky Aircraft Cessna Aircraft Company GSA NASA Air Force, WPAFB GE Aircraft Engines Hamilton Sundstrand Honeywell Rolls-Royce Corporation Rolls-Royce plc, England Vought Aircraft

Industry-Managed Active Customer Audits/Certs

Globalization of Special Process Americas System – NADCAP NADCAP Roll-out in Europe 2000 Asia Audits in 2001

NADCAP Programs  Special Processes – Nondestructive Testing – Materials Testing – Heat Treating – Coatings – Chemical Processing – Welding – Nonconventional Machining & Surface Enhancement  Systems & Products – Distributors – Sealants – AQS (AS9000, AS9100, AC7004) – Fluid Distribution Standards – Elastomer Seals  Under Development – Composites Fabrication & Adhesive Bonding

PRI/NADCAP Organizational Structure PRI Board of Directors Policy

PRI Board of Directors Purpose: Financial, legal, resources, leadership  Elizabeth (Liz) Otis  VP & General Manager  Boeing, FAB Division  Fred (Dick) Pocock  Vice President Quality Assurance  Honeywell  Michael J. Dreikorn  Vice President Quality Assurance  Pratt & Whitney  Peter G. Dersley  Group Director, Reliability & Quality  GM Motors Corp.  Jean-Louis Douliery  VP Procurement Quality & Supplier Dev.  Airbus  Raymond A. Morris  Executive Vice President  SAE  Joseph Cullen  Director, Quality  Rolls-Royce plc  Christopher Hayes  Director Of Material Quality & Technical Services  Northrop Grumman  Jean Senecal  Manager Supply Chain Quality  GE Aircraft Engines

PRI/NADCAP Organizational Structure PRI Board of Directors NADCAP Executive Strategic Planning Board (NESPB) Policy Strategic

NESPB Scope/Purpose Provides strategic direction for the optimization of NADCAP by integrating it into the fabric of the Aerospace and Defense Industries. The NADCAP Executive Strategic Planning Board has specific responsibility for the following: a.Support task groups by providing technical experts b.Develop strategies and vision for the NADCAP process c.Promote the use of NADCAP internally (quality, engineering & procurement) for prime contractors involvement d.Launch of New Task Groups - Provide resources and direction e.Be the affordability advocate for all constituencies f.Continuous Improvement - Assist NADCAP Management Council to improve the NADCAP process.

NESPB NADCAP Executive Strategic Planning Board  Sydney Pope  Director, Contract Technical Operations  Defense Logistics Agency  Deborah True  Quality Director  Rolls-Royce Corporation  Jay Park  Sector Manager, Supplier Process Mgmt.  Northrop Grumman Corp.  Bryan Blunt  Director, Quality  Cessna Aircraft Company  Lee Tait  Director of Quality Assurance  Lockheed Martin Aeronautics  Michael Song  Director, Field Operations, Procurement QA  Boeing Commercial Airplanes Group  Paul Jennings, Co-Chair  Manager Supplier Quality  Rolls-Royce, plc  Mike Buffington  Manager, Sourcing Quality  GEAE Aircraft Engine Supply Chain  Chet Daté  Corporate Director Supplier Quality & Dev.  Honeywell International  Lloyd Barker  Director Corporate Quality Assurance  Alcoa Corporation  Doug Scussell  Manager, Quality & Standards Labs  Pratt & Whitney  Michael Spencer  Mgr. Materiel Quality Eng. & Product Acceptance  Vought Aircraft

PRI/NADCAP Organizational Structure PRI Board of Directors NADCAP Management Council (NMC) NADCAP Executive Strategic Planning Board (NESPB) Policy Strategic Tactical

NADCAP Management Council Scope/Purpose a.Oversight - Oversee the operation of NADCAP from a customer/ government perspective b. Self-Governance - Appoint ad hoc audit teams to monitor NADCAP operations c.Policies & Procedures - Insure implementation and adherence to policies d. Task Group Coordination & Development - Horizontal integration to reduce variability e.Appeals - Rectify appeals of unresolved issues f.Continuous Improvement - Continually identify, develop and deploy improvement to the processes of NADCAP.

NADCAP Management Council  Arne Logan, Chairperson  The Boeing Company  Peter Angiola  DCMA  John Barrett  GEAE Aircraft Engines  Peter Krutoholow  Sikorsky Aircraft  Chet Daté  Honeywell International  David Dierking  Lockheed Martin, Sunnyvale  Mehmet Doner  Rolls-Royce Corporation  Gayle Roland  Lockheed Martin, Ft. Worth  Jay Park  Northrop Grumman Integrated Systems  Tom Downes  Hamilton Sundstrand  John Ewing  Raytheon Aircraft  Alan Fletcher  Air Force, WPAFB  Teresa O’Leary  CESSNA Aircraft Company  John McBrien  General Services Admin.  Manfred Podlech  MTU Aero Engines  Dianna Carlson  Pratt & Whitney  Arne Logan  The Boeing Company  Michael Spencer  Vought Aircraft

PRI/NADCAP Organizational Structure PRI Board of Directors NADCAP Management Council (NMC) NADCAP Executive Strategic Planning Board (NESPB) Administrative Staff Supplier Support Committee Policy Strategic Tactical Technical Task Groups Special Processes Nondestructive Testing Materials Testing Heat Treating Coatings Chemical Processing Welding NCM/Shot Peening Systems & Products Distributors Sealants AQS (AS9000, AS9100, AC7004) Fluid Distribution Systems

NADCAP Audit Review Process 1. Supplier2. Request Audit 3. PRI Audit Scheduled 4. Auditor Assigned 9. Issue Cert 8. Task Group * Approval PRI Technical Staff Review 5. Audit Complete d 6.7. * Users/Primes

Audit Standard & Checklist Industry experts manage all key steps IndustryManaged

Audit Standards/Criteria vs. Product Specifications Process Audit Criteria (AC) –Elements/Areas to be audited requirements are in SAE standards (e.g., AS9100). Audit criteria are checklist to the Aerospace Standards. Aerospace Standards are agreed to by Industry. Product/Process Specifications –Usually customer or Mil-Specs. General requirements (best practices) in Aerospace Standards.

Standards Audit/Criteria

NADCAP Special Process Commodities t NDT (AS7114) t Heat Treating (AS7102) t Materials Testing (AS7101) t Chemical Processing (AS7108) t Coatings (AS7109) t Welding (AS7110)

Audit Standard & Checklist Auditor Qualification & Selection Industry experts manage all key steps IndustryManaged

Auditor Selection/Interview/Performance

Number of Current Auditors & Experience

Number of Current Auditors & Experience (continued)

Audit Standard & Checklist Auditor Qualification & Selection Audits Conducted Industry experts manage all key steps IndustryManaged

Audit Process t PRI Schedules the Audit –Sends Checklists and Preparation Instructions –Request for Self-Audit t Auditor Conducts the Audit –Pre-Audit and Post-Audit Interviews –Requests responses to Findings within 14 calendar days t Auditor Prepares Letter t Audit Reports are Sent Overnight to PRI Staff for Staff Review

Audit Content t Quality Systems t Special Process Specific Requirements t Compliance/Job Audits –NDT: 2 Compliance Jobs per Method –Heat Treating: 2 Long Jobs-8 Short Jobs –Materials Lab: Witnessing of All Test Methods –Chemical Processing: Four Job Audits –Coatings: 5 Job Audits (Based on Scope) –Welding: 2 Job Audits per Method

Audit Standard & Checklist Auditor Qualification & Selection Audit Results Audits Conducted Corrective Actions As Required Industry experts manage all key steps IndustryManaged

Audit Report Review (Auditor Letter, Audit Report, Attachments, Non-Conformances, Job Audits)

NCR Classifications Major Nonconformance: Any nonconformance that could: - adversely affect safety as related to products, persons or property; - impact the usability of a product, performance of a service, or the integrity of the quality system; - significantly increase product cost; - potentially affect the ability to meet the customer’s requirements. Examples: incorrect process parameters, missing inspections or processing steps, failure to record required data, missed or out-of-tolerance calibration; - result from failure to implement a corrective action from the previous audit. Minor Nonconformance: Any non-systemic, isolated nonconformance that does not: - adversely affect the usability of a product, performance of a service, or the integrity of the quality system; - affect any product or process output. Example: paperwork oversights, minor changes to procedures for clarification.

Frequency of Audits

Audit Standard & Checklist Auditor Qualification & Selection Audit Results Audits Conducted Corrective Actions As Required Process Evaluation/ Improvement Industry experts manage all key steps IndustryManaged

NADCAP Continuous Improvement

Range of Total Findings Over Audit History Heat Treating (14 Audits) Findings 1.Job Audits (lack of shop discipline, self audits not effective, customer flowdown) 2.Quality Planning 3.Metallography/Microhardness 4.System Accuracy Tests 5.Temperature Uniformity Surveys 1.Job Audits (lack of shop discipline, self audits not effective, customer flowdown) 2.Temperature Uniformity Surveys 3.System Accuracy Tests 4.Quality Planning 1.Job Audits (lack of shop discipline, self audits not effective, customer flowdown) 2.Vacuum Furnaces

Range of Major Findings Over Audit History Heat Treating (14 Audits) Findings 1.Job Audits (lack of shop discipline, self audits not effective, customer flowdown) 2.Quality Planning 3.System Accuracy Tests 4.Temperature Uniformity Surveys 1. Job Audits (lack of shop discipline, self audits not effective, customer flowdown) 2.Temperature Uniformity Surveys 3.System Accuracy Tests 1.Job Audits (lack of shop discipline, self audits not effective, customer flowdown)

Supplier Advisories Sources: PRI Auditors/Staff, OEMs/Primes/Government, Suppliers, Publications (GIDEP, etc.)

eAuditNet.com t Phase I: On-line Qualified Manufacturers Listing (QML) - Completed 11/29/01 t Phase II: Audit Report Completion/Processing/Review t Phase III: Scheduling, Contact Manager t Phase IV: QPL, IPT, Other Programs Estimated Completion Date for Phase II-IV July 2002

Liability

Supplement with PRI Responsible for the “process” - Industry Standards - Procedure - Oversight - Core Values PRI/NADCAP Central Information Network “OSCAR” Central Information Network “OSCAR” Agreements - Auditors - Suppliers - Users Early Warnings NADCAP-Wide Early Warnings NADCAP-Wide Reduce Risk Reduce Escapes Supplier Responsiveness Consistency in Training Supplier Conformity Users/Primes “LIABILITY” does not shift Users/Primes “LIABILITY” does not shift

NADCAP Task Groups t Scopes

Non Destructive Testing t Liquid Penetrant t Magnetic Particle t Ultrasonics t Radiography

Heat Treating t Alloy Families: Aluminum, Beryllium/Copper, Copper, Cast Irons, Nickel and Cobalt, Magnesium, Stainless/pH Stainless Steels, Steels, Titanium t Processes: Carburizing, Nitriding, Carbo- Nitriding, Hardening & Tempering,Ferritic Nitrocarburizing, Ion Nitriding, Vacuum Heat Treating, Vacuum Oil Quenching, Induction Hardening, Furnace Brazing, Dip Brazing, Induction Brazing, Hot Forming/Hot Sizing, Flame Hardening, Cryogenic Treatments, Die Quenching, Hipping t Testing (In-Support of Heat Treatment): Metallography, Hardness, and Tensile Testing (Room-Temperature)

Materials Testing Laboratories t Chemical Laboratories t Mechanical Laboratories t Metallography and Microhardness t Hardness t Corrosion and Oxidation t Mechanical Test Specimen Preparation t Differential Thermal Analysis t Heat Treating of Specimens t Fastener Testing

Chemical Processing t Plating t Anodizing t Conversion/Phosphate Coatings t Paints and Solid Film Lubricants t Other Processes: Passivation, TitaniumCleaning/Etching, Brush Plating, Chemical Milling, Etching

Coatings t Thermal Spray t Vapor Deposition t Cementation t Stripping t Coating Evaluation t Plating of Coated Parts

Welding t Torch/Induction Brazing t Flash Welding t Electron Beam Welding t Resistance Welding t Fusion Welding t Laser Welding t Friction/Inertia Welding t Diffusion Welding t Percussion Stud Welding t Foundry In-Process Welding of Castings t Gas Tungsten Arc Fusion Spot