4 Phase Model of a Project

Slides:



Advertisements
Similar presentations
Introduction Project Management.
Advertisements

Estimating, scheduling and budgeting
Budget Execution; Key Issues
NETLIPSE Infrastructure Project Assessment Tool Professor Hans-Rudolf Schalcher, ETH Zürich Amsterdam, 21 April 2009.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Project Management Lecture Developing the Project Plan.
Different Procurement Methods
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Project Management Dr Martin Stanton E137
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Large Underground Projects - Project Management in a Risk Perspective Large Underground Projects - Project Management in a Risk Perspective Professor Håkan.
Software Engineering General Project Management Software Requirements
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
Managing Fast – Tracked Projects: A Review of ECI Report Dr
4.2 Develop Project Management Plan
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
1 ECGD3110 Systems Engineering & Economy Lecture 3 Cost Estimation.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Project Management.
Planning the project Project Management (lecture).
Software Development Process and Management (or how to be officious and unpopular)
The NEIGHBORHOODS NETWORK TASK FORCES Do the nitty-gritty work specified by the neighborhood 2.Responsible only to the neighborhood 3.Given a “charter,”
Project planning and Management By Fouad CSI1. MODULE III: PROJECT LIFE CYCLE Project Life Cycle A project life cycle is the series of phases that a project.
Insert Procurement Event Name Here Procurement Plan Presentation.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
1 Evaluating and Terminating the Project Key Concepts EvaluationMeasurement Auditing the Project.
Project Management Project Roles. The number of people involved in a project and the roles they play will vary greatly between different types and size.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
1 3. M ODELING U NCERTAINTY IN C ONSTRUCTION Objective: To develop an understanding of the impact of uncertainty on the performance of a project, and to.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Infrastructure Projects Date Realising Benefits of a Collaborative Procurement Strategy in Rail Infrastructure Project Delivery Motsi Madangombe,
An introduction to Project Management Ainsley Smith
Investment decision making
Briefing to the Portfolio Committee on the Comparison on Procurement Methodologies 6 June 2006.
Learning the lessons 2012 and 2014 procurements of audit services.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Viking Estimation Team Assignment 13 Team 2-1. Content 1/ Introduction 2 / Wideband Delphi & COCOMO II 3 / The assemble task formula 4 / Wideband Delphi.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
12.1 Plan Procurement: Introduction
Not for Distribution Outside of MBP1 April 11, 2012.
INFO 638Lecture #91 Software Project Management Conclude Adaptive Project Framework INFO 638 Glenn Booker.
The Contract Management Process Contract Formation.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Department of Labour ICT TRANSITION AREAS OF CONCERN 10 September 2013.
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
Software Development Framework
Chapter Five Project Planning.
Introduction Project Management.
WORK GROUPS The NEIGHBORHOODS NETWORK
Project Management Lifecycle Phases
COST PLANNING AND ESTIMATION
Guidance notes for Project Manager
Chapter 2 – Software Processes
Introduction Project Management.
Definitions EPC EPCM Design/Build Contract Lump Sum
Candidate Registration & Induction
Introduction to Project Management
Schedule (Major Deliverables and Milestones)
Project Management II The Project Value Creation Process
Workplace Modernization Assessment
Infrastructure Optimization Assessment
Presentation transcript:

4 Phase Model of a Project An interpretation of the Scottish Parliament & Welsh Assembly

Four phases of a project Conception Development Realisation Termination Lockyer. K., Gordon. J

Four phases of a project Conception Organisations capability Costs Required budget Product specification Capital outlay Procurement Contract conditions Development Detailed design and specification Appoint project manager Create project team Project plan (outline)

Four phases of a project Realisation Project progress Expenditure Costs problems Termination Success of methods used Performance of then team members Reliability of the suppliers

The purpose of project phases Projects are broken up into a number of project phases, each of which is a designated group of activities that normally result in a deliverable or a milestone. Project phases are defined to assist in control or management of the project.

Original Model Lockyer & Gordon Conception Development Realisation Termination Only a slight overlap between the phases – normal situation

Fast Track Construction Technique variation (design – build) interpreted by David Moulton Conception Development Realisation Termination Note overlap increased here. This is where the time is saved using a fast track approach. Realisation (in this case construction) can begin while development (in this case design) begins. Result time saved (in theory).

The reality of the Scottish Parliament Interpreted by David Moulton Conception phase Development phase Termination Phase Termination Realisation phase Notice how the three phases overlap, the conception phase is still not fully complete even while the realisation phase is being undertaken. The many changes in the project required alterations to aspects of the concept and also changes to plans made in the development phase. The lack of clarity of the key objectives and which had priority (conception phase) increased risk and created uncertainty

The Welsh Assembly Interpreted by David Moulton Method reviewed Conception Development Realisation Termination The Welsh Assembly also adopted a fast track method (construction method – design/build) similar to that used by the Scottish Parliament. However they found that this was difficult to control in terms of cost and time and decided to review the situation. The decision was to stop using the fast track approach (red line) and contract to a construction organisation on a fixed price basis. The result was a controlled budget and completion on time.