Iowa Grain Quality Initiative Advisory Committee Meeting: 1/12/07 Chad Laux Industrial and Agricultural Technology Program Dr. Charles Hurburgh, Jr. Major.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

Internal Controls Becoming Compliant. Design & Implementation of Internal Controls. Design: Need to show that a framework is in place to establish internal.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Nomad Aviation Employee Training on ISO 9001 – the globally recognized quality management system 1ISO 9001 Training for Employees-Rev. B.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
The ISO 9002 Quality Assurance Management System
Quality Management System
Quality Management Systems Chapter 10. Introduction ISO- International Organization for Standardization Founded in 1946, in Geneva, Switzerland Main function.
Chapter 9 - Quality Systems Team #2: Cindy Guthrie, Amy Randolph and Robin Tomer.
SAI K. RAMASWAMY DR. GRETCHEN A. MOSHER NC-213,KANSAS CITY HARPC: Preventive Controls & Food Safety Implications 1 NC-213The U.S. Quality Grains Research.
Building and Sustaining Total Quality Organizations
OPERATIONS MANAGEMENT for MBAs Fourth Edition
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
Agenda Review homework Final Exam requirments ISO 9000 Baldridge
Implementing a Quality Management System
ISO 9000 Certification ISO 9001 and ISO
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
ISO 9000 Implementation Imran Hussain.
4. Quality Management System (QMS)
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
Huzairy Hassan School of Bioprocess Engineering UniMAP.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Quality Management System
Ashland Specialty Ingredients IFAC’s cGMP Audit Guide How the Food Ingredient Industry has Responded to FSMA and Food Safety Audits Priscilla Zawislak.
Iowa State University of Science and Technology Chad Laux Agriculture and Biosystems Engineering Industrial and Agriculture Technology 9/27/05 The Impact.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
1 © Mahindra Satyam 2009 Quality Management System Mahindra Satyam’s Quality Guide ISO Slides.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Cost of Quality - COQ MGMT-5060 Operations Management.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
Hazards Identification and Risk Assessment
QUALITY. QUALIDOC Web site: Telephone: 44+ (0) JEAN WHITE.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
ISO Registration Common Areas of Nonconformances.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
QUALITY MANAGEMENT SYSTEM
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
OHSAS Occupational health and safety management system.
UNDERSTANDING ISO 9001:2008.
ISO 9000.
External Validation of Quality Programs
ISO 9000.
What are ISO 9000 Standards? ISO 9000 Standards
Need for ISO 9000 & other Q Systems Swamynathan.S.M AP/ECE/SNSCT
جمهورية مصر العربية المركز القومي للبحوث التربوية والتنمية مركز معلومات و التوثيق و دعم اتخاذا القرار.
Agenda Review homework Final Exam requirments ISO 9000 Baldridge
ISO 9000 Dr. S. Thomas Foster, Jr..
External Validation of Quality Programs
ISO 9001:2000 Management System Overview
Radiopharmaceutical Production
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

Iowa Grain Quality Initiative Advisory Committee Meeting: 1/12/07 Chad Laux Industrial and Agricultural Technology Program Dr. Charles Hurburgh, Jr. Major Professor The Impact of an Auditable Quality Management System in a Grain Elevator Application

Outline Farmer’s Cooperative Results of QMS in Quality Control FDA Bioterror Act FC Mock Recall Results

Farmers Cooperative Company Northwest Iowa Company Over $400 million in sales Over $400 million in sales 50 locations and growing 50 locations and growing 350+ employees 350+ employees Departments: Grain, Agronomy, Feed, Seed, Admin., Accounting Departments: Grain, Agronomy, Feed, Seed, Admin., Accounting Source: FC, 2006

Problem Statement With the adoption of QMS, how has it impacted Farmer’s Cooperative operations? What measurements would provide evidence so FC may proceed with other location implementations? Inquiry focused on company processes which directly affect grain preservation and handling

Key Value-adding activities Information flow Continual improvement of the quality management system Interested parties Interested parties Requirements Satisfaction Management responsibility Measurement, analysis and improvement Resources management Product realization Input Product Output Source: ISO, 2000 Core processes and ISO 9000

Core Farmer’s Cooperative Co. Processes: ISO Defined Processes which transform the end product in ISO structure Control of Nonconforming Grain Final Inspection In-process Inspections Preservation of Grain-Bulk Grain Shipping Preservation of Grain-Storage Areas Preservation of Grain-Handling and Preservation Identification and Tracking-Inspection and Grading Identification and Tracking- Grain Identification and Tracking Control of Operations-Release & Post Shipping Control of Operations-Loading Order Verification of Purchased Product Order Processing for Gain Shipments Shipping Storage All 3 Shipping Receiving Shipping

Statistical Process Control - Grain Grading Farmers Coop has been grading the same grain samples that were also graded by an official inspector –Matching the precision of the official inspectors

Research Model & Hypothesis  Grain quality for shipment is improved when QMS procedures are adopted  FC/FGIS/customer comparisons of same sample:  Corn Moisture - Content Instrument Factor  Corn Damage - Visual Judgment Factor  Smaller Difference is Better!  Comparison of:  QMS locations vs. non-QMS locations  Locations before and after QMS implementation

Moisture Content Absolute Mean Difference All Locations w/ SEM’s shown n=15087 n=279n=218

Moisture Content Absolute Mean Difference – Location 1 Before and After AIB/QSE Adoption w/ SEM’s shown n=218n=2924

Moisture Content Absolute Mean Difference – Location 2 Before and After QMS Adoption w/ SEM’s shown N=279N=2864

Total Points % Damage Absolute Mean Difference All Locations w/ SEM’s shown n=79n=110n=5303

Total Points % Damage Absolute Mean Difference– Location 1 Before and After AIB/QSE Adoption w/ SEM’s shown n=79n=1197

Total Points % Damage Absolute Mean Difference – Location 2 Before and After QMS Adoption w/ SEM’s shown n=110n=1637

Conclusions QMS positively impacted FC operations through improved product quality of shipped grain. –Better resource management => Better quality control There was no difference in quality where the basis of determination was instrumentation. (moisture content) –Process control through calibration BPM is a suitable model of inquiry for research of ISO results in organizations

How to Meet the FDA Bioterrorism Act: An Elevator Case Study of Tracking Commodity Grain Using ISO 9000

Bioterrorism Act of 2002 FDA Mandate of ‘one up-one down’ traceability by 6/06 (sliding scale based on size) Protection of food supply Legislation –Registration – Section 305 –Recordkeeping & maintenance – Title III, Section 306 –FDA expects documentation to be mode of traceability Produce information upon official investigation Unfunded mandate Note: Traceability a requirement of ISO certification

Product Traceability Research Questions: Does a QMS facilitate traceability in commodity grain elevator operations? Does the traceability system meet FDA guidelines for traceability under the Bioterrorism Act?

Methodology Traceability/safety training conducted at 21 QMS/non-QMS locations Mock recalls conducted at locations to measure of training effectiveness (ISO requirement) Devin Mogler (QMS Intern) conducted recalls per FC ISO Procedure for Recalling Commodity Grain

Recall Summary Results

Distribution of Recall Duration

Discussion and Conclusions Audited FC results per FDA rules: –QMS traceability is adequate to meet FDA mandate –Wide variation in duration of recalls –Wide variation in precision i.e. lot size

Recommendations Trace from back to front in next round of recalls Follow through on multi-site recalls Improve internal communication – reduce lag time Use older scale tickets in recalls – will test system more thoroughly Collect all sources in bin, railcar assignments – indicator of precision (index) Use controlled documents for recalls – ‘traceable’ documents required Launch CAR’s on failed recalls – close the loop Decide on lot sizes – operations issue

Final Steps Impact of ISO on Quality and Quantity (Inventory mgmt.) on grain Key process with management measures on performance imbedded in QMS system: –8.2.4 – Monitoring and measurement of product –8.3 – Control of non-conforming product –8.5.2 – Corrective and preventive action Final Defense and graduate by Aug. 2007