Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.

Slides:



Advertisements
Similar presentations
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Advertisements

Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 6, 2012.
InfoWorks CS Enables Design of Hybrid Pressure/Gravity Sewer Systems
PROPOSAL TO ADJUST CURRENT WATER RATES Goal: Address frequently expressed concerns of citizens  Simplicity  Understandability  Fairness  Liability.
SAMPLE SLIDES OF THE 1-DAY SEMINAR FOR PUMP USERS
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
CAFS On-Line Orientation
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Booster System Basics: Constant Speed Systems
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
Case Study Leak Detection Program On Niue Island’s Water Resource.
CE 3372 Water Systems Design
Marine Auxiliary Machinery
WATER SUPPLY Copyright© Delmar is a division of Thomson Learning.
CE HYDRAULICS ENGINEERING
Basic Hydraulics Irrigation.
Las Delicias, El Salvador Water Supply Project Current Project Status, January 2010 Richard Cairncross & David Haussler.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
The Water Benders Final Presentations. Outline Introduction Project Description Motivation Problem Statement Objectives Customer Requirements Design Concepts.
EPANET FOR PRESSURIZED PIPE SYSTEMS
Keeping them Straight October 11,  Piping components come in two categories  Building Piping Components  Underground Piping Components.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Pumps.
EWB-MAP Water Tank Project Construction Progress June 5-12, 2012.
Potential Difference (V) Charge flows from higher potential to lower potential until electric potential equilibrium is reached. When electric potential.
HVAC523 Circulator Pumps.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
CHAPTER 9 Copyright © 2007 Thomson Delmar Learning 9.1 Water Supply.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Lecture 1 Water Distribution Systems
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Variable Frequency Drives and Irrigation Pumps Stefanie Aschmann Bozeman, MT 11/30/11 1.
Schematic Diagrams & Circuits
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
SUBJECT CODE NAME OF SUBJECT TOPIC :::::: FLUID POWER ENGINEERING CENTRIFUGAL PUMP Parul Institute of Engineering & Technology.
Rain Barrels and Cisterns What are they? How can we use them? How can we get one?
Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012.
Introduction to Energy Management
CE 3372 Water Systems Design
The study of electric charges in motion Electric Current.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
The Smart Network: NRW, Pressure and Asset Management
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Water Resources System Modeling
EE130 Electromechanics 2013 J. Arthur Wagner, Ph.D. Prof. Emeritus in EE
1 ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 6 : PUMPS.
Need to Know CASTLE. Section 1 All bulbs come on at the SAME time. A CIRCUIT is an unbroken loop of conducting electrical components that forms a continuous.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
National Diploma Mechanical and Electrical Services Construction Cold Water Supplies.
Prepared By:- Divyesh Shingala ( )
VALVES IN PIPE LINES.
Lecture (11): Water Distribution Systems
CHAPTER 6 MESB System Modeling and Analysis Hydraulic (Fluid) Systems
Parul Institute of Technology
PLUMBING APPLIANCES & COMPONENTS
CASTLE Need to Know.
Traditional Water Booster System
ME444 ENGINEERING PIPING SYSTEM DESIGN
Circuit Notes.
Circuit Notes.
Presentation transcript:

Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP

Location

Problem Las Delicias has an existing drinking water system that consists of a well, two pumps (submersible and booster), three storage tanks at elevation (one supplied by a spring), and gravity distribution system. The village experiences water shortage due to high electricity cost. Hoarding water leads to disease. Over 80% of children in the village have parasites which leads to school absenteeism. Standing water provides breeding ground for Dengue Fever mosquitoes.

Solution Our chapter (EWB-MAP) came up with a way to supply about 30% more water for the same energy consumed. About 50% of the population lives below the elevation of ~250’ above the elevation of the well while the tanks are located over 400’ above the elevation of the well. The solution is to add another tank at an intermediate elevation and pump to two different pressures.

Hoarding Water

A typical water system

Critical Elevation Diagram, existing system

Idea explored: new tank plus pump Good for grass-roots design. No space available. Electricity only reaches the existing pumps.

Idea explored: another well at higher elevation

Idea explored: pressurized system solution Tanks 1 and 3 can still be filled by using a booster pump in the manner it is used now. During filling the lower elevations would get water at higher pressure. After Tanks 1 and 3 are full the isolation valves on the two supply lines are closed and the pump only pressurizes the distribution system at lower elevations. A sustainable water distribution system uses gravity to drive the system and has been designed to offer a long service life with little to no maintenance.

Idea explored: tank level control using a float valve There is a float valve in the tank that closes when the tank is full (like in a toilet). When the valve closes the pump gests back-pressured (the operating point goes up on the pump curve). There is a pressure switch high (PSH) on the pump’s electrical controls. It shuts down the pump when the discharge pressure exceeds a certain value. Such scheme completely eliminates the need for an electrical, phone, or radio signal from the tank. The water in the pipe itself conveys the information.

Critical Elevation Diagram, proposed system

Proposed booster pump test

Modified booster pump test The ultrasonic flow meter was not charged. We ran the submersible pump (known flow) to obtain the so-called strapping chart of the cistern (liquid level vs. volume stored). The cistern has a baffle in the middle but one does not have to know the exact geometry to use a strapping chart. We drained the cistern using the booster pump varying the discharge pressure to produce the characteristic (head vs. flow).

Idea explored: liquid level indicator

Submersible pump

Booster pump

Submersible pump test

Booster pump test

Pump characteristics curve

Challenge We have to be able to match the submersible pump flow and the booster pump flow (they match now at high booster pump discharge head). If we run the booster at lower head (pumping to the new tank) the flow will increase. The energy consumed will decrease but (a) the cistern will run dry, (b) the efficiency will decrease. Bigger cistern takes care of (a) but not (b). Solution: Variable Frequency Drive (VFD).

Pump characteristics curve - efficiency

Variable Frequency (Speed) Drive

Pump characteristics curve with a VFD

Map of Las Delicias Water System DOWNHILL

260 Homes Served by Tank 3 33 Homes Served by Tank Homes Served by Tank 1 DOWNHILL Map of current Las Delicias Water System from ADESCO with approx house locations indicated

117 Homes Served by Tan 3 33 Homes Served by Tank Homes Served by Tank 1 Proposed Water Distribution System 280 Homes Served by New Tank DOWNHILL

Map of Current Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity DOWNHILL New 17,000 gallon tank Exisiting 11,000 gallon tank

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe connections 3.Pipeline Plans 4.Distribution of Work

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2a NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL 1.Tank Construction 2.Pipe connections 3.Pipeline Plans 4.Distribution of Work

Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2c NEW DISTRIBUTION LINE 2b NEW TANK A B C D E F DOWNHILL

Photos along Pipeline Path Area of Connection to Tubo Madre NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

Photos along Pipeline Path NEW SUPPLY LINE 1 NEW DISTRIBUTION LINE 2b NEW TANK A B C D

New Tank

New tank detail

Possible distribution scheme

Conclusions If different areas served by the same water system are located at different elevations it is possible to save pumping energy by pumping to two (or more) different storage pressures. One can just change the backpressure on the pump. The thing to watch for is the pump’s efficiency. A VFD can fix the problem. Multiple pumps and storage tanks at different elevations can be used in grass-roots design. Additional savings come from time-of-day power cost and power factor (VFD takes care of the PF; otherwise, one can use capacitors).