Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Compensation of Transient Beam-Loading in CLIC Main Linac
Overview of the DB accelerator complex B. Jeanneret CERN/ABP WG6 at IWLC_2010.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Stability issues in CTF3 and their relevance for CLIC. Phase feed-forward. Piotr Skowronski (1), Tobias Persson (1), Alexey Dubrovskiy (1), Guido Sterbini.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Production of a Safe Drive Beam The Drive Beam pulse Which bunch goes where How to get rid of undesired bunches General Principle Operational Scenarios.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Luminosity expectations for the first years of CLIC operation CTC MJ.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
Beam scenarios for a safe CLIC operation Giulio Morpurgo, for the MPWG.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Considerations on Drive Beam Klystrons and Phase Stability Erk Jensen, BE-RF RF and Beam Physics Meeting on CLIC Drive Beam Generation12-August th.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
RF phase & amplitude stability of the CTF klystrons By Dubrovskiy Alexey 4 February 20091CLIC beam physics meeting And thanks to Frank Tecker and Daniel.
X-band Based FEL proposal
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
The synchronization of the CLIC beams Giulio Morpurgo.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Drive Beam Feedforward and Compression
RF acceleration and transverse damper systems
Phase Feed-Forward Piotr Skowroński (CERN)
Steering algorithm experience at CTF3
Emittance Dilution and Preservation in the ILC RTML
Status of the CLIC main beam injectors
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
CLIC Damping ring beam transfer systems
F.Marcellini, D.Alesini, A.Ghigo
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Feed forward orbit corrections for the CLIC RTML
LCLS RF Stability Requirements
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo

Outline of this presentation The “phase synchronization” problem at CLIC The test-stand (CTF3) – what do we want to do there – Some data from existing measurements

The problem: The synchronization the CLIC beams Two couple of beams (DB1, MB1 and DB2, MB2) Synchronize DB1 (x 24) with MB1 Synchronize DB2 (x 24) with MB2 Synchronize MB1 with MB2 (not treated here)

Why must the MB and the DB be synchronized ? The Drive Beam carries the energy needed to accelerate the Main Beam. This energy, in the form of a 12 GHz pulse, is transferred to the RF cavities of the Main Linac, which produce a 12 GHz accelerating field to be seen by the Main Beam bunches. If this field has a wrong phase when the Main Beam sees it, the Main Beam will not be accelerated properly.

DB MB Synchronization points drive beam accelerator combiner rings CR1 CR2 delay loop 1 km e + injectore - injector CLIC 3 TeV e + main linac e - main linac BC2 BC1 e + DR e - DR booster linac decelerator, 24 sectors of 868 m IP1 BDS 2.75 km BDS 2.75 km 47.9 km CR2 delay loop drive beam accelerator 1 km CR1 TA R= 120 m TA R= 120 m 245 m DB MB Main Beam Drive Beam MB DB Synchronization MB MB Synchronization ? ?

What happens at every “synchronization point” The Main Beam arrives, on its way to the end of the CLIC tunnel. Its “phase” relative to a precise and stable oscillator is measured. After some time, the Drive Beam train for this sector arrives. Its “phase” is also measured. The difference between the two phases is compared with a (predefined) “reference value”. The Drive Beam is deflected into the turn-around, where its path length is fine-tuned in accordance with the above phase measurements (RT phase feed-forward) The Drive Beam enters the deceleration sector, and start transferring its energy to the RF cavities Soon after, the Main Beam appears again, having travelled to the final turn-around and back, ready to be accelerated by the RF cavities

The famous MB DB phase feed-forward in the tunnel Using a (local) femto-timing system, measure delay ΔØ real between the two outgoing beams DB turn-around MB to IP Out-going DB B B’ D D’ Sensitivity of δE measurement/correction? Intra-pulse corrections ? *Precision of the « phase » measurement *Stability of local timing C At B&B’: compare ΔØ (MB DB) real with reference ΔØ (the difference is the “phase” error) Also measure Drive Beam energy error δE (use A&B) Compute correction (δE dependent) to “re-align” DB to MB using “C-D” chicane Use D&D’ to measure residual phase error MB/DB after feed-forward Use B&C to measure time to cover the Drive Beam turn-around Out-going MB *see work by J.Sladen and A.Andersson, EPAC 2006, PAC 2007, CLIC-Note-734 Issues: A MB turn-around Decelerating DB

The MB-DB synchronization requirement The max. acceptable “phase” error (generated by a wrong delay between the arrival times of the Drive Beam and the Main Beam) has been set at 0.2° at 12 GHz. (equivalent to a distance error of ~ 10 µm) If the drive beam(s) and the main beam have a wrong relative “phase”, the main beam – will not be accelerated properly, and – its size will be enlarged by the Beam Delivery System (reducing luminosity) A correlated (among the 24 synchronization points) phase error of 0.2 ° corresponds to a relative luminosity reduction of ~1%* *D. Schulte, CLIC-Note-803

MB DB synchronization: What exactly has to be synchronized? (and measured) A train of the drive beam consists of 2904 bunches spaced by 83.3 picoseconds (2.5 cms) The bunches of the drive beam lose their energy in the PETS, and this energy produces the accelerating field for the main beam. Every bunch of the main beam is accelerated by the field – produced by n (~600) bunches* of the drive beam – (perturbed by the previous n/6 main beam bunches) The Main Beam bunches have to see a correct RF phase to be accelerated properly *For an RF cavities filling time of ~50 ns

What can be done at CTF3 Measure the “phase stability” of the RF structures (pulse to pulse and within same pulse) Measure the phase stability of the accelerated Drive Beam Identify sources of instabilities and their effects Measure the phase stability of the signal induced by the Drive Beam in the 12 GHz structures of the TBTS (second stage) Implement a prototype for the feed- forward system.

What we would like to achieve in 2010 and beyond Some data from the existing measurement system

A programme in two phases Phase 1 (2010): use existing measurement systems (RF measurements, Beam Current measurements etc.) – To get a first feeling about the orders of magnitude – To identify/correlate instability sources Phase 2 (end 2010 and beyond): build a more sophisticated system*, to reach the precision eventually required (0.2 ° at 12 GHz --> 0.05 ° at 3 GHz) – Dedicated acquisition system – Beam phase monitors – (Precise timing distribution, beam arrival time monitors ?) * A lot of work in this direction has been done in the past at CTF3 by A. Andersson and J. Sladen

fully loaded acceleration recombination x 2 phase-coding bunch length control recombination x 4 bunch compression two-beam acceleration structures 12 GHz CTF3 as a test-stand The CTF3 Linac: Phase measurements will be performed here

Structure of the CTF3 beam At the Linac : -”Pre-pulse header” (~100 bunches): used to stabilize RF power; dumped after linac. We have to discard its signal from our measurements. -Pulse length 1.12 µs (~1680 bunches) -Bunch spacing 666 ps (20 cm) -One bunch every second 3GHz RF bucket; every 140ns (210 bunches) the occupancy parity is changed After recombination (delay loop + combining ring) -Pulse length 140 ns (12 GHz) -Bunch spacing 83.3 ps (2.5 cm) It is also possible to have a shorter pulse length in the Linac, and to suppress the 140ns phase switching

CTF3 as a test stand Pre-buncher Gun Klystrons 3 GHz timing FIRST MEASUREMENT (“DRIVE BEAM PHASE”) Phase stability measurement: Mix 3GHz from timing and 3GHz signal induced by the beam in the last accelerating structure (whose Klystron will be switched off) Filter out high frequencies, digitize (one point every 1 ns), average over 10 points Look at Ø(t), the phase of the Beam Induced signal, relative to the (0) phase of the timing system GOAL OF THE MEASUREMENT Look at stability along the pulse Look at reproducibility pulse after pulse Buncher Accelerating structures Mixer Low-band filter Digitizer (~1 GHz) Data 3 GHz

Pre-buncher Gun Klystrons 3 GHz timing MEASURE PHASES FROM ALL CAVITIES The goal of this measurement is to determine if phase instabilities in different cavities are correlated or not. This is important to predict the way the error will accumulate in the CLIC Drive Beam Linac. The tolerance for uncorrelated errors is more relaxed than the tolerance for correlated ones buncher Accelerating structures Mixer Low-band filter Digitizer (~1GHz) Data Mixer Low-band filter Digitizer (~1GHz) Data

Pre-buncher Gun Klystrons 3 GHz timing INCLUDE BEAM CURRENT DATA FROM WALL CURRENT MONITORS MONITOR ALSO THE TEMPERATURE The goal is to study correlation between the phase measurements and the beam current, both inside a pulse, and pulse after pulse Also the temperature can have an effect which should be analyzed Buncher Accelerating structures Mixer Low-band filter Digitizer (~1 GHz) Data Mixer Low-band filter Digitizer (1 GHz) Data Wall current monitors They are capable of measuring the beam current distribution inside the pulse

fully loaded acceleration recombination x 2 phase-coding bunch length control recombination x 4 bunch compression two-beam acceleration structures 12 GHz Future development: measure phase at the two beam test stand It would also be interesting to make a phase measurement getting the signal from the two beam test area. (even if we know that no effort is done to maintain the phase stability) Mixer Low-band filter Digitizer (~1GHz) Data Mixer Low-band filter Digitizer (~1GHz) Data

Other measurements (later) Phase feedback prototype – It would be nice to use the Combined Ring and the Extraction Line as a Test Stand to implement a Phase / Beam Arrival Time feedback Timing distribution – The CTF3 complex should also be used to gain experience with a “femto-second” timing system like the one needed for CLIC

fully loaded acceleration phase-coding two-beam acceleration structures 12 GHz CTF3 as a test-stand for phase feed-forward Possible installation of a RT phase feed-forward prototype measure correct verify Phase monitor Global Timing

To conclude: Some data from existing measurements ( thanks to Alexey Dubrovskiy) Each dataset contains data acquired over ~200 consecutive pulses (1.2 seconds apart) The data from one individual pulse is an array of values acquired every 10 ns On each plot, all the 200 pulses are shown, in alternated colours, to give an idea of the pulse-to-pulse spread Two kinds of plots: -Absolute values -Difference from previous pulse

Data from existing measurements ( thanks to Alexey Dubrovskiy) Amplitudes and amplitude jitters of all RF structures, plus sum of all structures

Phase jitters of all RF structures, plus sum of jitters

An average RF structure

A good RF structure...

A not so good RF structure!

Last but not least... I would like to thank in advance the many colleagues who will actively contribute to this activity!