Beam and Slab. Site cast that is cast into forms on site. Typically used for storage facilities, and libraries because it can withstands heavy loads with.

Slides:



Advertisements
Similar presentations
CONSTRUCTION AND STRUCTURES – II MAJOR PROJECT
Advertisements

Precast Solid Slab and Hollow Core
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Concrete Fooring & Roofing System
Concrete Construction Part 1
Heavy Concrete Construction Formwork
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Advanced Flexure Design COMPOSITE BEAM THEORY SLIDES
Structural System Overview
Commercial Framing C D Prints Unit 13.
Roofing.
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Reconstruction of the Eads Bridge Highway Deck
Reinforced Concrete VS Steel
Concrete. The word “concrete” originates from the Latin verb “concretus”, which means to grow together.
Reinforced Concrete Design II
Site Cast Concrete slab and beam
CE 303: Introduction to Construction
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
CONSTRUCTION AND DETAILING 1
Lumber Section II. Lumber Structural Strength Depends on species and grade, and the direction in which the load is acting with respect to grain of the.
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
PRE-FABRICATED STRUCTURES
Concrete Construction
Commercial Structural Framing Systems The Skeleton of the Building The structure of life I have described in buildings... is deeply and inextricably connected.
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
BEAMS,COLUMS AND LINTELS
2001 Winter Presentation. Site Location Site View.
Prefabricated Timber Frame Construction
PRECAST CONCRETE CONSTRUCTION
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Reading Structural Drawings
Wall and Ceiling Construction
© 2010 Delmar, Cengage Learning Instructor Resources for Lesson C Material Basics.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Wood Construction CTC-375.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Chapter 28 Structural Components of Framed Construction.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
TYPE OF STAIRS STRAIGHT-RUN STAIRSQUARTER-TURN STAIR HALF-TURN STAIR SPIRAL STAIRS WINDING STAIR CIRCULAR STAIR Building construction illustraded 4 th.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Lecture 2 Structural System Overview CVEN Structural Concrete Design January 15, 2003.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
Prof. Shrikant M. Harle Asst prof. Dept of Civil Engg PRMCEAM
Benefits of Precast Double Tee System Maximum durability and structural strength Low maintenance Excellent for fast-track construction Can be manufactured.
Pitched Roof By PATEL ANKITKUMAR H.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
Framing Vocabulary Stud: upright beams in the framework of a building
Introduction to composite construction of buildings
Commercial Floor Systems
Prefabricated Timber Frame Construction
BUILDING CONSTRUCTION 1
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Competency: Draw wall sections and details.
Cast in Place 2 way Flat slabs Basically joists in both directions
Building Construction I Sofia Sebastian 1
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Arch205 building construction floor & Roof systems
Building Frame (Column & Beam)
Commercial Floor Systems
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
Commercial Floor Systems
Plain & Reinforced Concrete-1 CE3601
Masonry Bearing Walls.
Commercial Structural Framing Systems
Presentation transcript:

Beam and Slab

Site cast that is cast into forms on site. Typically used for storage facilities, and libraries because it can withstands heavy loads with relatively minimal depths. In the 70’s is was a very popular structural system and can also be found in schools and office buildings built at that time. The most common site cast concrete is for foundations and slab on grades. Two way systems and one way systems Site cast concrete has made possible some of the most stunning building ever designed. It’s ability to be made into any shape has allows for the ultimate architectural creativity. Below are a few examples of what is possible with site cast concrete.

Advantages Sculptural possibilities -can do almost anything -form -surface texture More energy efficient to produce than steel. Long lasting Concrete is generally produced and available locally.

Benefits of site casting concrete. Fire resistance Fast construction Mostly light, thus lowering foundation cost and allowing for longer spans Resistance to seismic activity Durable Finishes Ribbed slabs are constructed from wide band beams going through two columns Waffle slab are the deeper equivalent to ribbed slabs. Thy are ribbed slabs that span in both direction.

Disadvantages Long on-site erection time -prone to weather related delays. Non-standardized construction can be very expensive.

-Effective spans -Strength & Weaknesses

A One way slab is supported on two opposite sides of the structure, the forces of gravity only travel in one direction,now if the slab is supported by all 4 sides but the ration from long side to short side is double then it the slab is considered one way. This is so because of the difference in lengths ONE-WAY Span:6’-12’ Two way slab are supported by all four sides but the ration from long side to short side are less then 2. thus speeding the gravitational load evenly throughout the structure. Span:15’-40’

L-beam The system above is designed as one way continuous slab which is spanning across the t beam supports T beams and l- beams are more effective than conventional wide beams because of its greater width comparison flange and lever arm

The Flexible Form is available 10' of length and heights from 4", 6" and 12",. Each form has seven reinforced stakes pockets on the back side that secure ¾" steel stakes and support the form while the concrete is being placed.. These forms are used for pouring super flat floors for warehouse floors where wire guides are used to maneuver or control material handling equipment. paving forms are used for major highways, streets, airport runways and taxiways and ramp construction. Flexibility and Diversity of Forms

Slab Finishes: it is smooth as cast and remains that way in the finished construction. The exposed-to-view surface and is often painted in most cases. It also can be kept somewhat rough to receive a composite casting-place structural top surface of 2 to 3 in., as with double tees or gypsum topping.

Beam Finishes: Since beams are cast upright, the bottom, sides, and ledges are cast against a form and will typically be provided with an “as cast” finish that results in a smooth, hard finish. The top is applied by the finishing crew and can be smooth and roughened to create a bond with cast-in- place concrete that can be poured on top.

TWA Terminal, NY, Eero Saarinen

Boston City Hall, McKinnell & Knowles About half of the concrete used in the building was precast — roughly 22,000 separate components — and the other half was poured-in-place concrete. cast-in-place elements are coarse and grainy textured because the concrete was poured into fir wood frames to mold it, while precast elements, such as trusses and supports, were set in steel molds to gain smooth, clean surfaces. This distinction can also be seen in the fact that the exterior poured-in-place pieces are of type I cement, a lightly colored cement, while the exterior precast components use type II cement, a dark colored cement.