ERDMP OF IGL Experience and Lessons for other CGDs

Slides:



Advertisements
Similar presentations
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Advertisements

Emergency Preparedness and Response
East Carolina University Compressed Gas Safety Training Program
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) FOR
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Enrollment49,500 Enrolled for Transportation24,800 Enrolled for Special Transportation560 Total Miles each day24,520 Total Miles each year4.4 million.
ISRI Safety & Environmental Council May 9, » Zero Accident Consulting:  Eight years with RecycleGuard  2438 safety visits to recyclers  Knowledge.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
Safety Gas Plus.
Embrace Group Gas Pipeline and Services. About Us EMBRACE GAS PIPELINES PVT. LTD. (“Embrace”) is engaged in execution of projects for Liquefied Petroleum.
Management of Hazardous Chemicals chlorine. Management of Haz.Chemicals Every day lot of chemicals are being handled Some chemicals are safe,some are.
Session 8: Modeling the Vulnerability of Targets to Threats of Terrorism 1 Session 8 Modeling the Vulnerability of Targets to Threats of Terrorism John.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
MEDACTHU PROGRAM 28 September 2007 EPA Thessalia Emergency and Readiness Procedures.
Partnership for Clean Fuel & Vehicles : (Side event, BAQ ) December 18th, 2002 Need for a partnership to promote alternate fuel vehicles N.V.Iyer.
CNG for Clean & Green Environment WELCOME TO PRESENTATION ON EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) FOR INDRAPRASTHA GAS LIMITED ALOK.
OSHA Long Term Care Worker Protection Train the Trainer Program Part 1: Introduction.
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
2008© COPYRIGHT 1 1 ATHN DATA SUMMIT DISASTER PREPAREDNESS JULY 31, 2008 PANEL MEMBER - JOY MAHURIN COMPREHENSIVE BLEEDING DISORDERS CENTER CONTINUITY.
Introduction of Government’s CNG policy and India’s CNG infrastructures and NGV Diffusion 25 th November, 2014 New Delhi.
EHS Management System Elements
ISO EMERGENCY PREPAREDNESS AND RESPONSE
Incident Reporting Procedure
Safety in CNG Systems.
Domestic Natural Gas Installations Marc Billington.
Jeffery Graviet Emergency Services Coordinator, Salt Lake County Chairperson, Salt Lake Urban Area Working Group.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
1 An Introduction to Crisis and Disaster Management for Power Sector (April 2013)
ONSITE EMERGENCY MANAGEMENT PLAN. DISASTER Disaster in industry may be defined as one or more emergencies which can affect several or all plants / departments,
INTRODUCTION TO LAW, PUBLIC SAFETY, CORRECTIONS AND SECURITY.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
ADM 677 Crisis Management in Educational Settings Karen McCuiston Kentucky Center For School Safety.
“ GIS Based Emergency Response Support System of RGTIL – EWPL ” 16-Oct-15.
Procedures for Dealing with Safety or Health Concerns.
1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE Sagar Varma Senior Manager( Fire & safety)
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Hazards Identification and Risk Assessment
City Gas Distribution: A Network Analysis
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Petroleum and Natural Gas Regulatory Board Regulations for CGD Network 1.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
Disaster Planning: Are You Ready? Kyle J. Cavanaugh Vice President University of Florida CAUBO 2006 Conference.
Toolbox Talk 2016 Struck by an Object.
SAFETY MANAGEMENT SYSTEM IN TURKISH STATE RAILWAYS (TCDD)
Utilities and Crisis Management June 13, 2015 Carolyn Bermudez Vice President and General Manager, Operations.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
NIPPON STEEL PIPE INDIA PVT. LTD. EMERGENCY PREPAREDNESS & RESPONSE PLAN - FIRE.
Volunteer Response To After School Incidents Or Offsite Incidents.
Business Continuity Planning 101
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Cyber Security Phillip Davies Head of Content, Cyber and Investigations.
SAFETY IN THE WORKPLACE
We always have time to work safely
Infrastructure & Safety
Make the pic clearer, name & university Oshin Paranjape
Highlights of Road Traffic Accidents In Ethiopia
A presentation By Rajnath Ram Joint Adviser (I), PNGRB
Best Practices in AGL 2nd National Workshop -
Disaster Management Submitted to Submitted by Mrs.P.GuptaNilesh Akela.
FEED BACK & MONITORING PROCESS
Overview of City Gas Pipe lines PSC th March 2018
SV-04 VALVE STATION LEAK INCIDENT PSC th March 2018
Unit 1 Emergency Procedures.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

ERDMP OF IGL Experience and Lessons for other CGDs EMERGENCY RESPONSE AND DISASTER MANAGEMENT PLAN (ERDMP) As per PNGRB Notification GSR 39(E), 2010 1

OVERVIEW 1 ABOUT IGL 2 CLASSIFICATION OF EMERGENCIES 3 CASE STUDY 4 BEST PRACTICES & IGL INITIATIVES 5 EMERGENCY PREPAREDNESS IN IGL 2

INDRAPRASTHA GAS LIMITED (IGL) Incorporated on 23rd December 1998 for supply of natural gas to domestic, commercial and automobile sectors (CNG). Immediate target - implementation of Supreme Court order

VIJAIPUR 42”*610 km DADRI Hazira HVJ PIPELINE DESU/Delhi/MARUTI DADRI NTPC DADRI FARIDABAD CHAINSA TCL-BABRALA (IFFCO) AONLA MATHURA HVJ PIPELINE DESIGN CAPACITY:33.4 MMSCMD DESIGN PRESSURE:92 KG/SQ CM LENGHTH:2800 KMS (OFCL) SHAHJAHANPUR AGRA/FEROZ NTPC AUR JAGDISHPUR CFCL AURAIYA BORERI ANTA VIJAIPUR DAHEJ KHERA Additional Compression 42”*610 km JHABUA 36”*640 km Existing HBJ EXISTING LINE Hazira VAGHODIA NEW LINE

At present IGL is having more than 8000 kms of pipeline network spread across Delhi & NCR

CNG STATIONS OF DELHI & NCR STATUS (As On Sep’12) NO. OF STATIONS MOTHER : 68 ONLINE : 152 DAUGHTER BOOSTER : 46 TOTAL : 266 NOS. OF CNG VEHICLES : 5.4 Lakhs (APPROXIMATELY) AVERAGE CNG SALE, (MILLION SCM/DAY) : 2.56

Delhi-CNG Infrastructure Buses 17,106 Auto 1,46,412 RTV’s 36,981 & Taxi’s Private 3,35,297 Cars The present infrastructure caters to more than 5,30,000 vehicles from NCT Of Delhi and NCR.

PNG Segment (Number of Connections) Domestic Connections – 3,55,920 Commercial Connections – 731 Industrial Connections – 280

District Regulating Station ( DRS ) CGD Line Diagram Steel Pipe Network Pressure 19 to 26 Bar District Regulating Station ( DRS ) City Gas Station Transmission Gas HVJ Pipeline , Pressure - 60 bar Dispensing 200 Bar CNG M.D.P.E 4 Bar Regulating / Metering G.I. / Cu Piping 21 mbar Kitchen Burner

PNG - A Typical Gas Supply Scheme

OVERVIEW 1 ABOUT IGL 2 CLASSIFICATION OF EMERGENCIES 3 CASE STUDY 4 BEST PRACTICES & IGL INITIATIVES 5 EMERGENCY PREPAREDNESS IN IGL 11

As per PNGRB Gazette Notification GSR 39 (E) LEVELS OF EMERGENCIES …L1, L2, L3 Level 1: This is an emergency or an incident which - Can be effectively and safely managed and contained within the site, location or installation by the available resources; Has no impact outside the site, location or installation. Level 2: This is an emergency or an accident which – Cannot be effectively and safely managed or contained at the location or installation by available resources and additional support is alerted or required; Is having or has the potential to have an effect beyond the site, location or installation and where external support of mutual aid partner may be involved. Is likely to be danger to life, the environment or to industrial assets or reputation. Level 3: This is an emergency or an incident with off-site impact which could be catastrophic and is likely to affect the population, property and environment inside and outside the installation, and management and control is done by district administration. Although the Level-III emergency falls under the purview of District Authority but till they step in, it should be responsibility of the unit to manage the emergency. Note: Level-I and Level-II shall normally be grouped as onsite emergency and level-III as off-site emergency.

IGL’s ERDMP Classification of Emergency Level 1: Level 1 Emergency may include the following Scenarios at our CNG stations & PNG Sites: These are the emergencies arising at CNG/PNG sites and controlled by the IGL’s available staff / manpower there with own resources. Minor Gas Leakage in CNG Equipments / Pipeline / Vehicles (due to vehicle’s fittings failure or Safety Disc Rupture) / due to third party damage. Minor Fire due to Gas Leak Short Circuit in CNG vehicle or any Station Equipment Hose pulling / Hose Snaking Failure of Joints of Tubings / Nozzles / Break away Coupling / Bursting of Dispensing Hose Minor Gas Leak in MDPE Line (Third party damage) Minor First Aid Injuries to Workers or Employees

IGL’s ERDMP Classification of Emergency Level 2: Level 2 Emergency may include the following Scenarios at our CNG stations & PNG Sites: When the Level 1 Emergency could not be controlled and situation becomes uncontrolled and require intervention of external sources / help: Gas Leakage due to Safety Disc Rupture/Fitting failure in a Bus at CNG station and caught Fire. Gas Leakage due to Station Tubing Joint /Ferrule Failure and subsequently caught fire, engulfing CNG Equipments & Vehicles came of refuelling at CNG Station. Failure of Steel Pipeline and subsequent Fire. Fire in PNG Customer premises (Domestic, Commercial, Industrial). Gas Leak and Fire due to the LCV Accident on Road. Ehtyl Mercaptan leakage while handling.

IGL’s ERDMP Classification of Emergency Level 3: Level 3 Emergency may include the following Scenarios at our CNG stations & PNG Sites: When the Level 2 Emergency could not be controlled and situation becomes uncontrolled and disastrous and require help of district authorities like NDRF, etc. Ethyl Mercaptan Leakage & Spillage at the time of Handling, Unloading / Dosing. Main Pipeline Failure and Isolation could not be done due to - Natural Calamities like Floods, Earthquake. Sabotage and Arson during riots Aerial Attack Terrorist Attack Rupture of CNG Cylinders - Onboard Vehicle Cylinders, Mobile Cascade Cylinder, Stationary Cascade Cylinders leading multiple casualties.

INCIDENT STATISTICS IN IGL (LAST TWO YEARS) 2011 2012 (As on Aug’12) LEVEL OF EMERGENCY TYPE CNG PNG LEVEL 3 OFFSITE 1 LEVEL 2 FATAL MAJOR LEVEL 1 MINOR / NEARMISS / FIRST AID 223 183 226 217 2012-L-3 (Sabotage & Arsoning): Incident took place at IFC-II CNG Station on 02.09.2012. 2012 – L-2 (Major Leak): 12” Steel pipeline puncture near Kapashera on 23.05.2012. 2011- L-2 (Major Fire): Fire took place at Rohini-25 CNG station on 23.04.2011 due to gas leak during filter cleaning. 2009 –L-2 (Major Fire): 1. Fire took place in a Bus at Pragati Maidan CNG Station on 17.01.2009 due to gas leakage and fire in the Bus being refilled, involved our CNG station. 2. Fire inside customer’s kitchen on 03.12.2009 at Jawahar CGHS, Dwarka.

OVERVIEW 1 ABOUT IGL 2 CLASSIFICATION OF EMERGENCIES 3 3 CASE STUDY 4 BEST PRACTICES & IGL INITIATIVES 5 EMERGENCY PREPAREDNESS IN IGL 17

View of totally damaged CNG Station

View of totally damaged CNG Station

PASCHIM VIHAR CNG STATION FIRE

CHATRASAL CNG STATION FIRE

Root Cause of Incidents

Failure of Safety Disc of CNG Cylinders results in High Pressure (up to 200 kg/cm2) Gas Leak resulting in damage to vehicles as well as CNG station (Safety Disc)

Unprotected Battery Terminals

OVERVIEW 1 ABOUT IGL 2 CLASSIFICATION OF EMERGENCIES 3 CASE STUDY 4 BEST PRACTICES & IGL INITIATIVES 5 EMERGENCY PREPAREDNESS IN IGL 26

DCP FLOODING SYSTEM

OPERATION OF DCP FLOODING SYSTEM FOR BUS DISPENSER

DCP SYSTEM FOR CASCADES

OPERATION OF DCP FLOODING SYSTEM FOR CASCADES

Safety Practices in IGL are reviewed by Top Management and Safety is top agenda in all Board Meetings.

TRAINING

IGL Employees Training

Training is given Prime Importance and Regular Trainings are imparted to IGL Employees, Contract workers, CNG & PNG Consumers, Security Guards and Delhi Fire Service personnel. Multi-discipline Core Safety Groups trained from NEBOSH, UK ensures implementation of Safety Management System. 36

FOR THE SAFETY OF SCHOOL CHILDREN

Fire & Safety Training to Security Guards

CNG Fire Training to Delhi Fire Service Personnel

IGL’S INITIATIVES FOR CONSUMER SAFETY

IGL’S INITIATIVES FOR CONSUMER SAFETY TRAINING PROGRAMS FOR RESIDENTIAL SOCIETY CUSTOMERS

TRAINING PROGRAMS FOR DRIVERS OF UPSRTC BUSES

TRAINING PROGRAMS FOR STAFF OF RETAIL OUTLET OF OMCs

TRAINING PROGRAMS FOR RESIDENTS OF SPG (SPECIAL PROTECTION GROUP) SOCIETY

Safety Awareness Programmes at RASHTRAPATI BHAWAN for the staff and the residents. Safety Awareness Programmes at TIHAR JAIL for the staff and the residents.

DISTRIBUTING SAFETY PAMPHLETS

IN LINE WITH THE REQUIREMENT OF CHECKING THE STATUS OF CYLINDER HYDRO-TESTING OF CNG VEHICLES, WHICH IS VERY CRITICAL ISSUE – IGL HAS RECENTLY CONDUCTED VARIOUS EDUCATIONAL PROGRAMME ACROSS DELHI & NCR TO MAKE THE CONSUMERS AWARE ABOUT THE REQUIREMENT OF HYDRO TESTING OF CYLINDERS.

BROADCASTING SAFETY SLOGANS ON RADIO FM

CONDUCTING SAFETY CHECKUP CAMPS

CHECKUP CAMP OF CNG CARS

FREE CHECKUPS OF CNG CARS 56

DISTRIBUTING CDS OF SAFETY ANIMATED FILMS

ANIMATED FILM ON SAFETY

Safety Audits Internal & External Safety Audits are conducted for PNG & CNG Installations. Safety Committees Meetings are conducted on quarterly basis in each Zone. Constituted with equal participation of Executives as well as Non-Executives. Safety Work Permit System Followed for all activities in CNG and PNG Shutdowns. Around 30 Permits are issued on an average per day for all the CNG Control Rooms. Accident/Incident Reporting and Investigation IGL has a well laid down Accident Reporting and Investigation procedure. All Incidents are investigated to find out the root cause and action taken on priority to comply the recommendations.

OVERVIEW 1 ABOUT IGL 2 CLASSIFICATION OF EMERGENCIES 3 CASE STUDY 4 BEST PRACTICES & IGL INITIATIVES 5 EMERGENCY PREPAREDNESS IN IGL 60

Emergency Preparedness by IGL 5 nos. Emergency Control Centers (one in each zone) are established at strategic locations which are manned round the clock. 61

2 nos. Emergency Response Vehicles are provided for catering any emergency in NCT & NCR of Delhi.

EMERGENCY RESPONSE VEHCILES (ERV)

ECC and ERV Locations

MOCK DRILLS

THANK YOU 71