Team 8:Recon Robot Safety and Reliability Analysis Abhinav Valluru (presenter) Vinit bhamburdekar Arjun Bajaj Aabhas Sharma.

Slides:



Advertisements
Similar presentations
WP3 High Availability Drives Electrical Machines and Drives Research Group University of Sheffield Dr. Georges El Murr
Advertisements

V i t a l i s ECE Spring 2013 TEAM 13 Presenter: Yi Shen Wireless Biometric Sensor Team Members: Aakash Lamba Di Mo Shantanu Joshi Yi Shen Reliability.
ECE 477 Group 8 Recon Robot Arjun Bajaj Aabhas Sharma Abhinav Valluru Vinit Bhamburdekar.
Josh Piron, Jacob Pfister, Kevin Templar, Mike Phillips Group Nine Reliability and Safety Analysis DART.
ELECTRICAL. Circuits Outline Power Hub Microcontroller Sensor Inputs Motor Driver.
Elec 399 – Design Project I. Supervisor: Ashoka Bhat Task: To design and build a dc-to-dc converter for charging electric vehicle batteries Description:
TCSP8 Reliability and Safety Analysis ECE477 GROUP 4 CHRIS CADWALLADER CRAIG PILCHER ANDY SYDELKO MIKE WILLIAMS Project Forget-Me-Not.
RELIABILITY & SAFETY ANALYSIS PRESENTED BY: ANDREW BATEK Team # 15: Acoustic Storm Interweaving the impressive visual power of electricity and the visceral.
Team 13 John Ashmore, Brian Bell, Jason Giles, Jing Li.
TEAM BRIGHTRIDERS Failure Modes, Effects, and Criticality Analysis “We put the SOUL in SOULAR racing”
Reliability & Safety Jason Holmes Matt Wickesberg Matt Guenette Michael Piercy.
Defender Safety and Reliability Analysis Kirk Iler Brian Bentz Stephen Wolf Fuhe Xu.
Daryl SielaffBen McQuiston Will McKennaDavid Hartman Functional Blocks and FMECA Chart.
Team 01 : QuadSquad Safety and Reliability Andrew Boldt 11/6/2013 the ECE quadcopter senior design Purdue University1.
Technical Communication Skills Practicum (TCSP) Presented by Nuhairi & Azad Team 10: “Hazard Rover” 2/21/2007.
Wall-E Prototype I Team 1 Xin Jin
Technical Communication Skills Practicum (TCSP) Presented by Nuhairi & Azad Team 10: “Hazard Rover” 2/21/2007.
ECE 477 Group 3 The Gauntlet George Hadley Kelli Hacker Sean Ma Jacob Champion.
Team 3 Humphrey's Treasure Chest Roy Scheck Tony Leichty Charles Lan Steve Kingsley.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
P ROJECT PRINT TCSP 8 – R ELIABILITY & S AFETY A NALYSIS Team 8 – Siddharth Bhosale.
Team 13 Michael Stuckenschneider Loren Garby Arin Chakraverty Janell Niekamp.
TCSP – Reliability and Safety. Reliability Analysis Major component chosen for analysis:Major component chosen for analysis: Switching Regulators (LM2679SD-5.0,
Group 12 – H.E.A.D Gear Maximum Power Point Tracker Reliability and Safety Analysis Harsha Eric Atandra Daniel Vengapaty Aasen Burman Da Silva.
Reliability Analysis - Overview 4 main components considered Glove Micro - PIC24FJ128GA310 Base Micro - PIC18F87K90 3.3V Power Supply - CC3-0503SR-E 5V.
Solar Telematics System
Not So Deep Blue. LED chess board Detect piece movement Magnets/Reed switches Show possible moves Track game time (picture taken from a DIY project)
Team 9 - Scribacious Rabble Safety and Reliability Analysis Mitchell Erdbruegger (presenting) Paul Rosswurm William Hess Ben Kobin.
RCD Laser System Corey Lane, Ryan Scott, Danny Barjum.
ALEX BUSCHKOETTER ALEX GLENN KIMBERLY SOONG PETRA MUSTAFA Group 4: 3MS.
FLAC Audio Player Brett Mravec with Isaac Jones Greg McCoy Danielle Miller Team 9.
Bryan McDonnel Michael Mize Ryan Taylor (presenter) Miles Whittaker
The “Drink Mixer” Reliability and SafetyAnalysis.
ECE 477 Senior Design Team 7 Reliability and Safety Ben Horst Katie Taller Matt Klass Jacob Wyant.
Team 5 Reliability & Safety TCSP. High Criticality = λ < Low Criticality = λ < High Criticality determined by constant vehicular movement.
Wall-E Prototype I TCSP #8 Safety and Reliability Analysis Team 1 Xin Jin Ranmin Chen Hang Xie Zelun Tie.
 Today we will cover:  Voltage regulators  Sensors  motordrivers iBOT1.
Home Enhancement Suite Presenter: Allen Humphreys William Bouchonnet, Daniel Sabo, Nathan Irvin.
Steve Andre Eric Glover Shaun Greene Russell Willmot.
Team 8 Recon Robot Abhinav Valluru Vinit Bhamburdekar Arjun Bajaj Aabhas Sharma.
Electronic Cornhole Team 7 Safety/Reliability Analysis Jimmy Tsao Tom Collopy Andrew Reder Ryan Scheckelhoff.
Technical Communication Skills Practicum (TCSP) Presented by Team 10: “Hazard Rover” 2/21/2007.
© Date: 10/07 vinvin Product Presentation High-Speed, Microcontroller-adaptable, PWM Controller MCP1631 October 2007.
Fly Spy – Group 12 Reliability and Safety Analysis Heather Barrett.
This week in the physics course Lectures will cover Chapter 24 (Electric Current) and start Chapter 25 (Electric Circuits) Please note: lecture slides.
Project #1 Smart Sprinkler Robot System. Introduction.
Portable Power Station University of Wyoming Electrical and Computer Department EE Done By Mohammad S. Almoallem Mahmood S. Almoallem Advised.
DOODLE DRIVE Presenter: Peachanok Lertkajornkitti Team 6 Reliability and Safety Analysis.
Phillip Byers Jonathan Mulvaine Josh Schortgen Michael Broski TEAM BOAR.
RECON ROBOT ECE 477 Group 8 Vinit Bhamburdekar Arjun Bajaj Aabhas Sharma Abhinav Valluru.
Team 3 ATV Daniel Barrett Sebastian Hening Sandunmalee Abeyratne Anthony Myers.
SWISH SLEEVE Safety and Reliability Analysis Stephen MacNeil, Michael Kobit, Sriharsh Achukola, Augustus Hong.
P-REV Michael Connaboy Stephen Schiffli Ram Hudiara Win Than Aung.
BY: VISHU KUMAR 1HK08EE055 Internal Guide: WASEEM KHANUM.
Autonomous Rescue Vehicle (Team 10)
Team 16 : Project Minotaur Presenter : John Hubberts
Reliability and Safety Analysis
Arjun Bajaj Aabhas Sharma Abhinav Valluru Vinit Bhamburdekar
Humble Hubble Team 18 – Derek Pesyna Abstract
Safety and Reliability
Reliability & Safety Analysis
Arjun Bajaj Aabhas Sharma Abhinav Valluru Vinit Bhamburdekar
Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
Safety and Reliability
Team We Ate 9 FMECA Worksheet.
Reliability and Safety Analysis
Matt Baker Laura Kassovic Corey Zahner Jason Eaton
Safety Analysis Ian Bacon Zach Dicklin Amy Ritter Eric Yee.
Reliability & Safety Analysis
Rectifiers.
Presentation transcript:

Team 8:Recon Robot Safety and Reliability Analysis Abhinav Valluru (presenter) Vinit bhamburdekar Arjun Bajaj Aabhas Sharma

Key Concerns Reliability: – Electronics for power supplies – Motor control – Microcontroller,GPS and wireless transciever Safety: – Batteries – Burns – Unexpected behavior

Part failure risk Heat – TB6612FNG H bridge – D24V6ALV step-down voltage converter Complexity – PIC 32MX360F512L microcontroller – RN-131 G wireless transceiver

FMECA Analysis: Major injuries predicted – Most severe: burn injuries Criticality Levels – Low: nuisance failure – Elevated: risk of additional part damage – High: definite part damage – “+I” Suffix: Chance of personal injury

FMECA : Major concerns Failure modePossible causesFailure effect Detection method Criticality 5V short circuit Damaged MOSFET, Shorted capacitors Excessive current and heat build-up, possible destruction Observation; heat and smoke buildup. Unpredictable/no behavior High + I 3.3 V short circuit Damaged MOSFET, Shorted capacitors Excessive current and heat build-up, possible destruction Observation; heat and smoke buildup. Unpredictable/no behavior High + I Motors stuck at Vcc PWM failure, H-bridge failure Motor(s) at full speed, excessive heating in motors Recon robot can’t maneuver around the obstacles properly Elevated + I Micro > MIPS Core clock fault, faulty power supply, fighting on output pins Heat buildup, decreased part lifetime, glitching in other parts Observation: heat and smell. Potential glitching in motor control Elevated + I

Steps to improve reliability Minimize design weight – Less current draw from motors, low power dissipation – Longer battery life Over-designing of power supplies – Exceed expected power & peak current ratings (20% or higher) – Lowest available temperature coefficients(C/W)

Questions ?