Earned Value Project Management: a powerful tool for software projects

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
BTS730 Cost Management. Average cost overrun: –1995 CHAOS study: 189% of the original estimates –2001 study: 145%
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Monitoring and Controlling
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Evaluation and Control
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Evaluation and Control
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
9-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 9 Progress and Performance.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Understanding Earned Value Analysis
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management (SPM)
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Cost Management
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Earned Value Management
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
MISUSE OF EARNED VALUE MANAGEMENT RESULTS IN ERRONEOUS CONCLUSIONS
Project Management Earned Value Management Demonstration
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
“PMP® Exam Prep” Earned Value Management
CHAPTER:7 Project Cost Management
Earned Value Management
Project evaluation and control
Earned Value Management
Project Cost Management
Earned Value Management & Oracle Primavera P6
Earned Value Management
Understanding Earned Value Analysis
Understanding Earned Value Analysis
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Earned Value in the Industrial Construction Setting
Project Evaluation and Control
Schedule and Cost Variance Problem
5. Project PLAN & cost estimation
Monitoring and Controlling
Understanding Earned Value Analysis
Managing Project Work, Scope, Schedules, and Cost
Chapter 7: Project Cost Management
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

Earned Value Project Management: a powerful tool for software projects Grete Kikas Tallinn University of Technology Healthcare Technology

Topics What is Earned Value Project Management? Why it is powerful tool for software projects?

Background Different studies estimate that a significant number of software development projects are in chaos. 74%* of software development projects do not meet schedule, cost or scope constraints. 52.7%* of projects will cost 189% of their original estimates. The average overrun is 222% of the original time estimate. (Standish Group report 2004) Sample size: 8380 projects * Respondents were IT executive managers. The sample included large, medium, and small companies across major industry segments, e.g., banking, securities, manufacturing, retail, wholesale, heath care, insurance, services, and local, state, and federal organizations. The total sample size was 365 respondents and represented 8,380 applications. In addition, The Standish Group conducted four focus groups and numerous personal interviews to provide qualitative context for the survey results.

What is Earned Value Project Management? Earned value management (EVM) is a project management technique for measuring project performance and progress in an objective manner. (Wikipedia)

What is Earned Value Project Management: utilities E.Kim et al (2003)

Why it is powerful tool for software projects? (1) EVM is useful tool to integrate the three critical elements of project management: Scope Time Cost management.

What is Earned Value Project Management: problems E.Kim et al (2003)

The concept of EVM Features of any EVM implementation include: Project plan Budget Cost of Work Scheduled (BCWS) Budget Cost of Work Performed (BCWP) The concept of EVM requires that the project has been planned and has a known Planned Value and Accumulated Cost.

Why it is powerful tool for software projects? (2) Cost Performance Index (CPI) greater than 1 is good (under budget): < 1 means that the cost of completing the work is higher than planned (bad); = 1 means that the cost of completing the work is right on plan (good); > 1 means that the cost of completing the work is less than planned (good or sometimes bad). Example of EVM on a project that was late and over budget

Formulas: Cost Variance (CV) = Earned Value (EV) – Actual Cost (AC) Cost Performance Indicator (CPI) = EV/AC Schedule Variance (SV)= Earned Value (EV) – Planned Value (PV) Schedule Performance Indicator (SPI) = EV/PV

References The Standish Group Report. Chaos. (2004) Wikipedia. [ https://en.wikipedia.org/wiki/Earned_value _management ] E.Kim, W.G. Wells, M.R. Duffey.(2003).A model for effective implementation of Earned Value Management methodology

Thank you!