Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
IES 371 Engineering Management Chapter 14: Aggregate Planning
Chapter 12 Aggregate Planning.
Sales and Operations Planning CHAPTER THIRTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning in a Supply Chain
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
Strategic Capacity Planning & Aggregate Planning
Sales and Operations Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Class 21: Chapter 13: Sales and Operations Planning Agenda for Class 21 –Collect challenges & discuss questions –Secondary Research due November 29 th.
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
Aggregate planning 1 Aggregate planning / scheduling Medium range plan - what we will make over the next 3-18 months. –general demand –controllable variables.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Operations Planning Horizons
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Ardavan Asef-Vaziri Systems and Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Planning Demand and Supply in a Supply Chain
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Contents Introduction Aggregate planning problem
Operations Management Aggregate Planning
8-1 Aggregate Planning in the Supply Chain Supply Chain Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
© 2004 Prentice-Hall, Inc. 9-1 Chapter 9 Planning Supply and Demand in a Supply Chain: Managing Predictable Variability Supply Chain Management (2nd Edition)
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved Facilities and Aggregate Planning Chapter 12 Due Date!
© 2007 Pearson Education Sales and Operations Planning.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Sales and Operations Planning
Chapter 9 Sales and Operations Planning
Planning Supply and Demand in a Supply Chain
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 14 Aggregate Planning.
Operations Management
Facilities and Aggregate Planning
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Chapter 8 Aggregate Planning in the Supply Chain
Supply Chain Management Lecture 3
Supply Chain Management (3rd Edition)
Dr Sh Salleh bin Sh Ahmad
Aggregate Production Planning (APP)
Presentation transcript:

utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8

utdallas.edu/~metin 2 Aggregate Planning (Ag-gregate: Past part. of Ad-gregare : Totaled) u If the actual is different than the plan, why bother sweating over detailed plans u Aggregate planning: General plan for our frequency decomposition –Combined products = aggregate product »Short and long sleeve shirts = shirt u Single product »AC and Heating unit pipes = pipes at Lennox Iowa plant –Pooled capacities = aggregated capacity »Dedicated machine and general machine = machine u Single capacity –E.g. SOM has 100 instructors –Time periods = time buckets »Consider all the demand and production of a given month together u When does the demand or production take place in a time bucket? u Increase the number of time buckets; decrease the bucket length.

utdallas.edu/~metin 3 Fundamental tradeoffs in Aggregate Planning Capacity: Regular time, Over time, Subcontract? Inventory: Backlog / lost sales, combination: Customer patience? Basic Strategies u Chase (the demand) strategy; produce at the instantaneous demand rate –fast food restaurants u Level strategy; produce at the rate of long run average demand –swim wear u Time flexibility; high levels of workforce or capacity –machining shops, army u Deliver late strategy –spare parts for your Jaguar

utdallas.edu/~metin 4 Matching the Demand Use inventory Use delivery time Use capacity Demand Adjust the capacity to match the demand Demand - Which is which? Level Deliver late Chase Time flexibility

utdallas.edu/~metin 5 Capacity Demand Matching Inventory/Capacity tradeoff u Level strategy: Leveling capacity forces inventory to build up in anticipation of seasonal variation in demand u Chase strategy: Carrying low levels of inventory requires capacity to vary with seasonal variation in demand or enough capacity to cover peak demand during season

utdallas.edu/~metin 6 Case Study: Aggregate planning at Red Tomato u Farm tools: u Shovels u Spades u Forks Aggregate by similar characteristics Generic tool, call it Shovel Same characteristics?

utdallas.edu/~metin 7 Aggregate Planning at Red Tomato Tools

utdallas.edu/~metin 8 Aggregate Planning What is the cost of production per tool? That is materials plus labor. Overtime production is more expensive than subcontracting. What is the saving achieved by producing a tool in house rather than subcontracting?

utdallas.edu/~metin 9 1. Aggregate Planning (Decision Variables) W t = Number of employees in month t, t = 1,..., 6 H t = Number of employees hired at the beginning of month t, t = 1,..., 6 L t = Number of employees laid off at the beginning of month t, t = 1,..., 6 P t = Production in units of shovels in month t, t = 1,..., 6 I t = Inventory at the end of month t, t = 1,..., 6 S t = Number of units backordered at the end of month t, t = 1,..., 6 C t = Number of units subcontracted for month t, t = 1,..., 6 O t = Number of overtime hours worked in month t, t = 1,..., 6 Did we aggregate production capacity?

utdallas.edu/~metin Objective Function: 3. Constraints u Workforce size for each month is based on hiring and layoffs u Production (in hours) for each month cannot exceed capacity (in hours)

utdallas.edu/~metin Constraints u Inventory balance for each month Period t Period t+1 Period t-1

utdallas.edu/~metin Constraints u Overtime for each month

utdallas.edu/~metin 13 Execution u Solve the formulation, see Table 8.3 –Total cost=$ K, total revenue=$640K u Apply the first month of the plan u Delay applying the remaining part of the plan until the next month u Rerun the model with new data next month u This is called rolling horizon execution

utdallas.edu/~metin 14 Aggregate Planning at Red Tomato Tools This solution was for the following demand numbers: What if demand fluctuates more?

utdallas.edu/~metin 15 Increased Demand Fluctuation Total costs=$ K units of total production as before why extra cost? With respect to $ K of before.

utdallas.edu/~metin 16 Summary u Qualitative strategies of matching demand and supply u Quantitative methods

utdallas.edu/~metin 17 Material Requirements Planning u Master Production Schedule (MPS) u Bill of Materials (BOM) u MRP explosion u Advantages –Disciplined database –Component commonality u Shortcomings –Rigid lead times –No capacity consideration

utdallas.edu/~metin 18 Optimized Production Technology u Focus on bottleneck resources to simplify planning u Product mix defines the bottleneck(s) ? u Provide plenty of non-bottleneck resources. u Shifting bottlenecks

utdallas.edu/~metin 19 Just in Time production u Focus on timing u Advocates pull system, use Kanban u Design improvements encouraged u Lower inventories / set up time / cycle time u Quality improvements u Supplier relations, fewer closer suppliers, Toyota city u JIT philosophically different than OPT or MRP, it is not only a planning tool but a continuous improvement scheme