Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

Checking & Corrective Action
[Organisation’s Title] Environmental Management System
Environmental Management System (EMS)
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
ISO 9001 : 2000.
QUALITY ASSURANCE AND IMPROVEMENT PROGRAM (QAIP)
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 11 GMP Workshop Kuala.
Establish Verification Procedures (Task 11 / Principle 6)
EMS Auditing Definitions
The ISO 9002 Quality Assurance Management System
Quality Management Systems Chapter 10. Introduction ISO- International Organization for Standardization Founded in 1946, in Geneva, Switzerland Main function.
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
AUDITS AND INSPECTIONS
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Personnel Basic Principles of GMP Workshop on
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Photocopies Occasionally need uncontrolled copies
ISO 9001 Auditor Training Rita D’Angelo AFDO San Diego, March, 2015
4. Quality Management System (QMS)
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Project co- financed by Asean European Committee for Standardization Implementing Agency Project co-financed by European Union Module 7 GMP Workshop Kuala.
Fundamentals of ISO.
REVIEW AND QUALITY CONTROL
Internal Auditing and Outsourcing
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 4 GMP Workshop Kuala.
Auditing an EMS for Conformance with EO 13423
ASEAN GMP TRAINING MODULE PERSONNEL
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency 1 Module 13 GMP Workshop.
Basics of OHSAS Occupational Health & Safety Management System
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
ISO 9001: 2000 Certified Audit Process What to do.
INTRODUCTION TO AUDITING
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
Important informations
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Purpose of audit is to provide assurance that: Procedures for attaining quality are such that, if followed, the intended quality will be obtained.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency 1 Module 12 GMP Workshop.
Basic Principles of GMP
QUALITY MANAGEMENT STATEMENT
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
A QUALITY IMPROVEMENT TOOL
ISO Registration Common Areas of Nonconformances.
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency GMP Workshop Kuala Lumpur.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
Visit us at E mail: Tele:
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Internal Auditor Training
Fundamentals of ISO.
Internal Audit Training
Specialty Heat Treating, Inc. Internal Auditor Training
How to conduct Effective Stage-1 Audit
Quality Audits, and How to Survive them
Presentation transcript:

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Prepared by: Lam Kok Seng - Singapore Approved by: ASEAN Cosmetics GMP Team Endorsed by: ASEAN Cosmetic Committee ASEAN GMP TRAINING MODULE INTERNAL AUDIT

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov CONTENT OF PRESENTATION

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov INTRODUCTION

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov OBJECTIVES  To learn how to plan, perform and monitor IA  To define the activities and requirements of IA  To identify the roles and benefits of IA in a quality management system

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov DEFINITION  “Internal Audit" is an independent examination of a quality system  It measures the effectiveness of an organisation's quality management system.  It is a documented and systematic tool  It should be done periodically by independent and qualified people  “Audit" itself is a checking system, NOT a quality assessment  As a communication tool of management policies. All personnel have to understand and do their jobs well

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov ROLES OF IA As a powerful tool to measure the effectiveness of quality management system Evaluates manufacturer’s compliance with GMP in all aspects related production and quality control Detects any shortcomings in the implementation of GMP Recommend the necessary corrective and preventive actions

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov SCOPE OF IA (1)  Ensures quality in obtaining and responding to the feedbacks from customers, consumers, employers, employees, government authority and other relevant institutions  Ensures quality in design, approval, monitoring and evaluation of products should comply GMP requirements  Ensures quality in GMP implementation and its strategies  Ensures quality in appointment, development and performance of staff and key personnel

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov SCOPE OF IA (2) l Includes all written quality documents, instructions and records l Covering all elements of GMP including results of previous internal quality audit and any corrective and preventive actions (CAPA) taken

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov BENEFITS OF IA  Tells you the health of a quality system  Identify the root of a problem and plan for corrective and preventive actions with timeline  Achieve better allocation of resources  Able to avoid potentially big problem  Learn what an auditors look for  Continuous improvement

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Strategies in conducting audit: Ask with the basic audit questions about the quality system in place Start with what, why, how, who, where, when KEY PRINCIPLES OF IA Approaches towards IA: Independent Evidence-based approach All activities related to IA should: be reviewed by an independent party be a self-appraisal system have a sampling plan and tracking system be open, constructive and effective

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov PRINCIPLE OF AN AUDITOR  Ethical  Professional  Fair

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov GUIDANCE WHEN CONDUCTING AN AUDIT Auditing should be seen as a positive process not a fault finding Audits need to be documented Prior to the audit date, an auditor needs to review the quality system documentation, corrective and preventive actions, and past audit findings and develop a checklist During an audit, an auditor need to see evidences that the processes are being done in accordance to procedures and policies

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov GUIDANCE FOR AUDITEE When being audited: Volunteer information Report deficiencies and difficulties if you know of any Be honest, open and cooperative Ensure that underlying causes are identified Ask the auditor if you’re not sure

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov MANAGING IA

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov FLOW CHART OF IA

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov RESOURCES FOR IA Considerations should be given to the following: Resources Audit techniques Processes to achieve and maintain the competency of auditors and to improve their performance Competency and availability of auditor Available time for auditing

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov The planning of IA consists of : IA PLANNING Establishing IA program  Objectives  Responsibility  Procedure and guidance Authority for administering the IA program OBJECTIVES

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov The implementation of IA program consists of : IA IMPLEMENTATION Scheduling audit Implementation of audit program Audit record and report

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Implementation of audit program should be monitored at appropriate intervals and reviewed to assess whether its objectives have been met and identified opportunities for improvement. IA MONITORING Auditing findings should be reported to the management.

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov AUDITING ACTIVITIES

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov OVERVIEW OF AUDIT ACTIVITES Planning and scheduling audit Conducting document review Conducting audit Prepare audit report Conducting follow-up Preparing for on-site activities

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Forming an audit team and assign roles and responsibility and agreed on the scope Conducting document review Preparing for the on-site audit activities Review documents (SOPs, audit findings, corrective action/preventive action, etc.), check the integrity of the quality system and various controls are effective Preparing audit plan Assigning work to the audit team Preparing work documents (eg. audit checklists, sampling plans, forms for recording information; questionnaires) AUDIT ACTIVITIES

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov AUDIT DOCUMENTATION Audit report is an official document to report the audit findings Audit plan should be sent to auditee prior to audit activity findings from the last audit should be also mentioned Audit note should include an audit questionnaire all records and comments during the audit

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov EXAMPLE OF AN AUDIT CHECKLIST General format for an audit checklist

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov EXAMPLE OF AN AUDIT CHECKLIST

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov INTERNA: AUDIT QUESTIONAIRES Area audited : ______________________ Date: __________________ Question (QSR-GMP Reference)Response 1. Does the company have a work instruction to operate the machine? 2. How is the machine being cleaned and maintained? 3. Are personnel trained to use the machine? 4.How often is the equipment being calibrated and cleaned? 5. When is the last breakdown of the machine? Are there any product being affected? IA MONITORING

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov AUDITING ACTIVITIES (1) Conducting on-site audit activities Interviews with different personnel Carry out both horizontal and vertical audits. Focus on safety and quality of product. Use “Trace-back” method  Conduct opening meeting  Good communication during the audit  Roles of escort and observer  Steps in conducting on site audit:

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Generating audit findings Either conformity or non-conformity Sort out isolated or systemic deficiencies Isolated deficiency: Tends to happen randomly; no meaningful pattern; rarely happens Systemic deficiency: Could be connected to a particular process, product, material, person or organisation; shows pattern; happens more than once AUDITING ACTIVITIES (2)

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov ISOLATED VERSUS SYSTEMIC DEFICIENCY NON CONFORMANCE DEFICIENCIES ISOLATEDSYSTEMIC Latex gloves ripSOP contains an error Wrong expiration date written on a reagent bottle Batch record is poorly written so instruction can be confusing Operator or lab technician spills a sample Area management does not reinforce requirement to continually record information properly Pressing machine of eye shadow burns out Preventive maintenance program does not include liquid filling machine motor

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov The audit finding can be classified into 2 groups: 1.Compliance : a.Satisfactory /Adequate b.Outstanding 2.Non-compliance : a.Critical deficiency b.Major deficiency c.Minor deficiency AUDIT MONITORING

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov  Objectives  Audit scope  Identification of audit team leader and members  Date and place where the on-site audit activities were conducted  Audit criteria and findings  Conclusions AUDIT REPORT

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov Various formats can be used depending on auditee (vendors, management or auditee) Usually include name and location of auditee, date of audit, audit plan, audit observations, classification of non-compliances, recommendations or expectations Should write against a standard Focus on deficient conditions and not people Include any positive observations Keep the audit report simple and clear AUDIT REPORT

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov NoGMP.RefFindings of IAGradingLocationAuditeeAuditor Production and QC departments are headed by the same person CriticalHuman Resources AbasBudi 2.4.3Monitoring of temperature in a warehouse Major or Minor WarehouseTutiMay Lin 311.1Inadequate control over sub-contractor Major or Minor ProductionHermanIda AUDIT REPORT: AN EXAMPLE

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov CLOSURE Follow-up and closing of loop: Receive a satisfactory response from auditee and their commitment to correct for any deficiency Ensures CAPA identify the root cause and they are satisfactory, accomplished and documented Timeframe for CAPA is being followed Verify and track CAPA by scheduling a follow-up audit and/or requesting for an updated SOP

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov CONCLUSIONS Nobody likes to be audited……….. It is a means to have continuous improvement

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov RELATED HYPERLINK DOCUMENTS  Trainer Manual of Internal Quality Audit Trainer Manual of Internal Quality Audit

Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 9 GMP Workshop Kuala Lumpur Nov REFERENCES 1.ASEAN Guidelines for Cosmetic GMP. 2.International standard ISO 9001:2002, 3.Guidelines for quality and/or environmental management system auditing, 1st Edition, Internal Quality Audit Scheme Internal Audit Procedurewww.fineprint.com 6.Stimson W.A., Internal Quality Auditing, Meeting the challenge of ISO 9000:2000, Paton Press, WHO – EDM, Basic Principle of GMP: Self- Inspection.