Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

[Organisation’s Title] Environmental Management System
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
Quality Management within the Clinical Research Process
Understanding the Requirements Qimpro Standards Organization
Chapter 4 Quality Assurance in Context
© 2009 Michigan State University licensed under CC-BY-SA, original at Control of Nonconforming Product.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Combat Propulsion Systems SR000XXXXX Supplier Name Month Year.
Quality Management System
Effective CAPA Program, a Valuable Tool in Quality Improvement Dharmi Trivedi.
ENERGETIC MATERIALS Co. Root Cause Analysis Guidelines 1.
Learning Objectives Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life.
External Defibrillators: Recalls, Inspections, and the Quality System Regulation Melissa Torres Office of Compliance December 15, 2010.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Business Reviews.
CPA is a UKAS company The Assessment Process 2014 Seminars.
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
Release & Deployment ITIL Version 3
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Fundamentals of ISO.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
PMP® Exam Preparation Course
Introduction to ISO New and modified requirements.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Product Quality, Testing, Reviews and Standards
FDA Regulatory review in Minutes: What Product Development Executives Need-to-Know. Specifically, frequent causes of recalls and related areas that investigators.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Understanding ISO 22000:2005 TCISys.com.
Creating a Risk-Based CAPA Process
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
© Pharmaceutical Consultancy Services, All rights reserved. Quality System(s)
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
A QUALITY IMPROVEMENT TOOL
ISO Registration Common Areas of Nonconformances.
The common structure and ISO 9001:2015 additions
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Cascade of Specifications and CTQs* to Suppliers *CTQ.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Six Sigma Greenbelt Training
How To Apply Quality Management
Global 8D Problem Solving
KMCO CAPA System Training
AICT5 – eProject Project Planning for ICT
ESSI CHANGE AND nonconformity control SYSTEM
Corrective Action Response Guidelines For TCEQ Accredited Laboratories
Software Reviews.
Quality Assurance in Clinical Trials
Radiopharmaceutical Production
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations and Problem Solving

Purpose of this SOP Establishes the process for failure investigations and problem solving activities conducted by suppliers Applies to CAPAs, nonconformances, SCARs (Supplier Corrective Action Requests), etc. A Supplier Failure Investigation and Problem Solving Template is provided 2

Scope of Supplier Failure Investigation SOP Begins when a supplier has been notified of an issue (nonconformance, CAPA, etc.) Ends when the supplier has completed all activities agreed to with MD&D to execute and document the failure investigation and problem solving associated with an issue Links supplier Failure Investigation (FI) and Problem Solving (PS) activities with the overall MD&D expectations for Failure Investigation and Problem Solving 3 Overall MD&D FI/PS Expectations MD&D Supplier FI/PS SOP Supplier FI/PS Activities

Key Definitions Correction - Action to eliminate a detected nonconformity. A repair, modification, adjustment, relabeling, destruction or inspection of a product or process. Corrective Action - Action to eliminate or reduce the cause or effect of a detected nonconformity or other undesirable situation, in order to prevent recurrence. Preventive Action - Action to eliminate or reduce the cause or effect of potential nonconformity, defect or other undesirable situation, in order to prevent occurrence. 4 Consistent with existing internal MD&D expectations, but now making sure the definitions are consistently integrated into supplier failure investigation activities

5 Responsibilities MD&D Ensure SOP requirements are met (in procedures & by suppliers) Notify the supplier of identified issues (nonconformance, CAPAs) Complete and document the full failure investigation (incorporating the supplier response) in the appropriate system Suppliers Conduct and document the supplier failure investigation and problem solving activities for supplier related issues Provide the information and/or template as requested by the MD&D Operating Company that requested the failure investigation

Key Requirements Suppliers to use MD&D form, if specified ―SOP allows for Op Co or supplier forms ―Template provided with the SOP can be used or can act as a guide ―MD&D form has definitions and walks you through the process MD&D notification of issues to suppliers ―Requirements for supplier notification are detailed in the SOP ―Timing requirements/deadlines still determined by each Op Co 6

Supplier Failure Investigation and Problem Solving Process Problem Statement / Supplier notification Bounding and containment ―Preliminary cause analysis (rationale for bounding) Corrections Root cause Plan corrective/preventive actions & effectiveness monitoring Execute the plan and document actions taken Monitor effectiveness 7 Drives suppliers to approach failure investigation and problem solving in a similar fashion to J&J MD&D

Problem Statement & Bounding/Containment Process starts with a good Problem Statement ―Clearly and factually describe the current condition as compared to the “should-be” condition ―Measureable (how often, how much, when, where) and fact-based ―Typically provided by MD&D (supplier can update) Supplier to conduct bounding and containment ―Locating and segregating suspect/nonconforming material at all locations (supplier, sub-tiers, alternate sites, etc.) ―Broad based approach identifying product that may be impacted ―Should be based on Preliminary Cause Analysis (PCA provides a rationale for bounding) 8

Preliminary Cause Analysis Extent of bounding should be based on Preliminary Cause Analysis (PCA) - provides rationale for bounding PCA is essentially the start of root cause identification Output of PCA is an understanding of potential causes, which can be used to establish bounding 9 Tools, such as 5-Why, should be used

Corrections Corrections: Documented action taken to eliminate and/or rework, repair, or a contain a detected nonconformity(s) and to document the final product disposition Root cause not required for correction, rather it focuses on ensuring that the defects in question are properly controlled Any new controls/rework should be evaluated for the need to be verified or validated Corrections can have unintended consequences (e.g. removing burrs can result in foreign matter/contamination) 10 The SOP and template are intended to aid suppliers in understanding the differences between Correction and Corrective Action

Root Cause Identification Continuation of any Preliminary Cause Analysis activities Document the root cause(s) that if corrected prevents re- occurrence of the same event. If root cause not confirmed then identify probable cause. Provide a rationale for root cause selection ―Whenever possible, this can be accomplished by confirming the selected root cause turns the issue on/off ―Identify and attach tools used, such as 5-Why In most cases training or human error is not the root cause After root cause identification, ensure bounding is still appropriate Identify any controls that were not effective 11

Planning Corrective and Preventive Actions Establish planned corrective and/or preventive actions ―Who, what, when Corrective actions prevent recurrences by eliminating causes. Corrective Action is designed to prevent the recurrence of nonconformities/issues. While corrective actions prevent recurrence, preventive actions prevent occurrence (to prevent the occurrence of situations that do not yet exist) ―Don’t just think of the single part, product, process or plant Where applicable, plan to update FMEAs and control plans Training should typically not be the only corrective action Document an effectiveness monitoring plan if needed (based on franchise CAPA/NC procedures; see SOP for details) 12 Additional CA/PA planning details are provided in the SOP

Execute and Document Actions Taken Carry out and document actions per established timing Notify MD&D of any changes to the plan Verify/validate per Op Co procedures Provide summary of investigation/activities and evidence Monitor/document effectiveness as defined in the plan ―If not effective, continue with the Failure Investigation process 13

14 The Supplier Failure Investigation and Problem Solving Template walks the user through the failure investigation process Supplier Failure Investigation and Problem Solving Template

15 The template includes definitions for key terms and can be used as a process guide even if an alternate form is being used

16 Planned actions and problem solving progress can be documented in the Supplier Failure Investigation Template Supplier Failure Investigation and Problem Solving Template