The Value of Systems Integration Johnson Controls, Inc Pulse 2008 Conference.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and.
Clair Christofersen Mentor – Aaron Andersen August 2, 2012
Advanced Oracle DB tuning Performance can be defined in very different ways (OLTP versus DSS) Specific goals and targets must be set => clear recognition.
The Data Centers, LLC Wolf Technology Center 1 Campus
Efficiency Vermont is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
HP Quality Center Overview.
HARVARD MEDICAL SCHOOL. HARVARD MEDICAL SCHOOL Brian Barmmer Facilities Engineer Managing Critical Facilities at Harvard.
Next Generation Belimo Energy Valve 1Belimo Americas Danbury, Connecticut.
© Eagle Technology, Inc. “Continuously Commission your Facilities” An Integral Team.
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
Reliability Centered Maintenance From a Data Center Perspective March 2013.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
Presented by Brent Baird Energy Monitoring with Ultrasonic Flow Meters Ultrasonic Flow Meters.
MT&R Introduction Presented by [Your name] [Date].
Dillard’s Energy Management
1Belimo Americas Danbury, Connecticut Belimo Energy Valve™ Investing in Efficiency.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Energy Valve Delta T Manager
Department of Facilities Management Maintenance & Operations.
2011 National Grid Energy Expo Proprietary & Confidential 1 Energy Management Systems 2011 National Grid Energy Expo April 7, 2011 Assis Flores Account.
Simplify your Job – Automatic Storage Management Angelo Session id:
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Johnson Controls Metasys/IBM Tivoli Demo
Chilled Water Systems Total Cost of Ownership
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
ENTERPRISE ENERGY MANAGEMENT SYSTEM Jason Kutch, P.E. Malcolm Drane, P.E. UTILITY METERING AT PURDUE.
Information Technology Division Executive Office for Administration and Finance Springfield Data Center Program Energy Strategy Meeting 9/29/2009.
Optimising Data Centre Power Planning and Managing Change in Data Centres - 28th November Cirencester.
Testing – A Methodology of Science and Art. Agenda To show, A global Test Process which work Like a solution Black Box for an Software Implementation.
1 Availability Modeling of Cooling Water Pumps to Assess if a Replacement Option is Economically Feasible. Dr. Salman Mishari.
How to Establish a Measurable ROI from Implementing IBM Maximo Asset Management Mountain West Maximo User Group Monday, August 3 rd, 2015 Created by Leon.
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
1 Case Study Managing Aeration Energy Usage (Analyzing BOD load removal per kilowatt hour)
IT 456 Seminar 5 Dr Jeffrey A Robinson. Overview of Course Week 1 – Introduction Week 2 – Installation of SQL and management Tools Week 3 - Creating and.
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
IRRIGATION ENERGY EFFICIENCY EVALUATIONS Energy use - the unknown cost.
Nikhef/(SARA) tier-1 data center infrastructure
SQL Server 2008 R2 Manageability. Challenges facing database administrators today: Scaling management to multiple data centers Proactively monitoring.
Energy Efficient Data Centers Update on LBNL data center energy efficiency projects June 23, 2005 Bill Tschudi Lawrence Berkeley National Laboratory
Supporting NCCU’s Educational Mission – with “Real-Time” Energy Measurement & Reporting.
Tivoli © 2010 IBM Corporation CCMDB New Features for CCMDB August 2010.
Connect with life Cheryl Johnson VSTS Solution Expert | Canarys Automations Pvt Ltd Performance Testing.
1 PCE 4.4 New Development In DC Containment Steve Howell.
Metrics & TCO For Real Efficiency Improvements It’s About The Total Cost of Ownership My Friend.
1 PCE 2.1: The Co-Relationship of Containment and CFDs Gordon Johnson Senior CFD Manager at Subzero Engineering CDCDP (Certified Data Center Design Professional)
IEA INTERNATIONAL ENERGY AGENCY PHOTOVOLTAIC POWER SYSTEMS PROGRAMME Overview 1.Introduction / Summary 2.PV-diesel hybrid systems 3.Measurement equipment.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
Association of Energy Engineers Randy Haines, CEM, CLEP, CMVP Energy Manager, Jefferson April 20, 2016.
April 16, 2012 Ray Miciek VP Smarter Building Strategies.
ITIL: Service Transition
Introducing WEBs Energy Suite.
Performance indicators Unplanned unavailability
Intuitive Operator Support by new Process Visualization
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Frac Sand Plant Optimization Bob Carter, President
2015 EPRI Heat Rate Conference
Managing Project Work, Scope, Schedules, and Cost
Liebert DSE High efficiency thermal management
Maintenance Opportunities
Presentation transcript:

The Value of Systems Integration Johnson Controls, Inc Pulse 2008 Conference

2 Value of Integration Defining hidden functional failures or actual alarms Knowledge of developing operational Issues Capacity, configuration & installation mgmt. Identify root cause & effect Automate - On-condition tasking, facility org. Remediate issues before they become alarms Sustaining energy efficiency targets Actual cost allocations based on data.

3 Today’s Issues Hidden Issues w/ financial & Ops consequences Little knowledge of cause and effect No reliable tie to energy benchmarks Inconsistent condition validation Inconsistent operational efficiency Manual Method of information transfer to the maintenance organization Limited use of technology for cost allocation.

4 Integration of Information Metasys Tivoli Maximo Integrator Solution Team Process Technology People

5 Case Study – Value of Integration Value of system data for cause & effect Value of condition indicators Energy as a “Sentinel” indicator Automated “Conditional” work order generation Optimization of energy usage Discovery of “hidden” functional failures.

6 Background Information Problem – Spot Capacity Issue 60K Sq ft of Raised Floor 2 floors 30K sq. ft. each Chilled water loop, 60 CRAC Units (Total) 50% of CRAC Units fully configured

7 Defining the Scope & Scale of the Issue BAS NMS Manual Data collection Source:

8 Integration of System Data Integration of: IT System Information Source: NMS

9 Integration of Configuration Data Integration of: Configuration Drawings Source: CMMS

10 Quantify Performance via Energy usage Measure Operational Efficiency against baseline Source: BAS/CMMS

11 Energy as a “Sentinel” Indicator Data CenterD/C EE Ratio (Energy Efficiency Index) (Support Sys. vs. Critical Load Ratio) Baseline Ratio Current Ratio.600 Source: CMMS (Historical)

12 Energy as a “Sentinel” Indicator Data CenterD/C EE Ratio (Energy Efficiency Index) (Support Sys. vs. Critical Load Ratio) Baseline Ratio Current Ratio Source: BAS (Current)

13 CMMS - Job Plan Auto Generation FREQ TYP E TASKING R& RPM PD M PA M On Condition TasksR&R10 CHECK ADJACENT UNITS FOR STANDARDIZED OPERATIONAL SETTINGS AND SIGNATURE – Affected areas R&R20 CHECK CONDENSTATE ON ADJACENT UNITS, IF YES, CHECK OPERATION OF VALVE 0.10 PAM30 LOG OPERATION PARAMETERS DURING THIS TASK R&R40 CHECK POSITION OF CW VALVE AGAINST CURRENT % COOLING ON PANEL 0.20 Total

14 CRAC Unit Operating Signatures Integration of IT System Information Drawings BAS Manual Data Verification of Performance

15 CRAC Unit – Poor Operating Signature

16 CMMS - Job Plan Execution FREQ TYP E TASKING R& RPM PD M PA M On Condition TasksR&R10 CHECK ADJACENT UNITS FOR STANDARDIZED OPERATIONAL SETTINGS AND SIGNATURE – Affected areas R&R20 CHECK CONDENSTATE ON ADJACENT UNITS, IF YES, CHECK OPERATION OF VALVE 0.10 PAM30 LOG OPERATION PARAMETERS DURING THIS TASK R&R40 CHECK POSITION OF CW VALVE AGAINST CURRENT % COOLING ON PANEL 0.20 Total

17 CRAC Unit – Good Operating Signature

18 Review - (Signature Before)

19 Validation of Results - (After) Validate Results of Remediation Activities IT NMS BAS

20 Case Study Results Temperature variances mitigated Gain back of 68 tons of cooling Decrease of 280 KW of energy consumption IT server performance: extended MTBF Process used to adjust maintenance plans On condition tasking Continuous verification of performance vs. baseline Validation effect of maintenance with energy usage Financial gain - $97.5K/year, 1 location

21 Summary – Process Automation Metasys Tivoli Maximo Integrator Solution Team Process Technology People

22 Summary - Value of Integration ID of Hidden functional failures – No alarms present Knowledge of developing operational Issues Automation of on-condition tasking for facility org. Identification of root cause & effect Mgmt of load to available resources (Capacity Mgmt) Record of asset/system information & trends (CMMS) Sustaining energy efficiency targets Optimized operating costs & allocations. Installation Management

23 Thank You!