WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.

Slides:



Advertisements
Similar presentations
Backgroun d Redesign Analysis Office Airside CUP Analysis CHP Analysis Power Distributio n Outline Constructio n Impact Conclusion Backgr ound Jim Gawthrop.
Advertisements

DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Backgroun d Redesign Analysis Office Airside CUP Analysis CHP Analysis Power Distributio n Outline Constructio n Impact Conclusion Backgr ound Jim Gawthrop.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
The Hearst Tower 959 Eighth Avenue New York, NY
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Objectives Finish with ducts and fans Define project topics.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Air Conditioning Systems
Science & Technology Center. Chestnut Hill Academy - Philadelphia, PA David Klug. Mechanical Option. Advisor - Dr. Freihaut April 15 th, 2009 Architectural.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
Nate Mooney | Mechanical Option Advisor: William P. Bahnfleth, PH.D., PE The Pennsylvania State University Architectural Engineering Spring Ames.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Achieving Dry Outside Air in an Energy-Efficient Manner PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Stanley A. Mumma, Ph.D.,
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Munters DOAS, Chilled Beams and VRV
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
Tri-Valley Jr./Sr. High School Hegins, PA
Professor of Architectural Engineering College of Engineering
Objectives Review exam problems Further discuss final projects
Presentation transcript:

WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh Mechanical Option

PRESENTATION OUTLINE INTRODUCTION EXISTING MECHANICAL SYSTEM MY DESIGN ANALYSES DEDICATED OUTDOOR AIR SYSTEM GROUND SOURCE HEAT PUMP PLANT CENTRAL PLANT PLANT INITIAL COST PLANT LIFECYCLE COST ARCHITECTURAL STUDY- FAÇADE REDESIGN CONCLUSIONS Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh Mechanical Option

FACILITY INFORMATION LOCATION: PITTSBURGH AREA PROJECT COST: $240 MILLION COMPLEX SIZE: 3 BUILDINGS (4-5 LOORS) 844,600 SF OCCUPANCY TYPE: OPEN OFFICE DELIVERY METHOD: DESIGN-BID-BUILD JOINT VENTURE CONSTRUCTION PERIOD: 2/ /2010 Westinghouse Nuclear Engineering Headquarters Introduction

Westinghouse Nuclear Engineering Headquarters Introduction

Westinghouse Nuclear Engineering Headquarters Introduction

Westinghouse Nuclear Engineering Headquarters Current Design Program is largely open office space with a Cafeteria, Data Center, and Fitness Center Façade is approximately 40% glazing for all orientations VAV system conditions the Office Spaces CRAC Units condition the Data Center Four Air Handling Units supply 293,600 CFM and 40% OA Three 450 Ton Chillers and Cooling Towers Electric Resistance Re-heat Facility Mechanical Information

Westinghouse Nuclear Engineering Headquarters Redesign Analyses

Westinghouse Nuclear Engineering Headquarters Redesign Analyses 1.Reduce Plant Loads with a Dedicated Outdoor Air System 2.Investigate a Hybrid Ground Source Heat Pump Plant 3. Investigate a Central Plant Redesign Analyses

Westinghouse Nuclear Engineering Headquarters Redesign Analyses Energy Use Initial Cost Lifecycle Cost Indoor Air Quality Environmental Impact Construction Impact Operation and Maintenance Redesign Analyses

Westinghouse Nuclear Engineering Headquarters DOAS Dedicated Outdoor Air System

Westinghouse Nuclear Engineering Headquarters DOAS Dedicated Outdoor Air System 1. Less Ventilation Air 2.Indoor Air Quality 3.Sensible and Latent Loads are decoupled

Westinghouse Nuclear Engineering Headquarters DOAS Plant Load Reduction Proposed: 1.Active Chilled Beams (ACB) 2.DOAS Fan Powered Terminal Units (FPT) 3. ACBs to condition Core Office Areas, DOAS FPTs to condition Perimeter Office Areas

Westinghouse Nuclear Engineering Headquarters DOAS Active Chilled Beams

Westinghouse Nuclear Engineering Headquarters DOAS DOAS Fan Powered Terminal Units

Westinghouse Nuclear Engineering Headquarters DOAS Plant Loading

Westinghouse Nuclear Engineering Headquarters DOAS System Initial Cost

Westinghouse Nuclear Engineering Headquarters DOAS System Life Cycle Cost

Westinghouse Nuclear Engineering Headquarters Hybrid GSHP Hybrid Ground Source Heat Pump Plant

Westinghouse Nuclear Engineering Headquarters Hybrid GSHP Hybrid GSHP Plant Schematic

Westinghouse Nuclear Engineering Headquarters Hybrid GSHP Hybrid GSHP Sizing Cooling Tower Size Ground Loop Size

Westinghouse Nuclear Engineering Headquarters Plant Analysis Plant Initial Cost

Westinghouse Nuclear Engineering Headquarters Plant Analysis Plant Lifecycle Cost

Westinghouse Nuclear Engineering Headquarters Architecture Architectural Study- Façade Redesign

Westinghouse Nuclear Engineering Headquarters Architecture North View South View

Westinghouse Nuclear Engineering Headquarters Architecture South Façade Redesign

Westinghouse Nuclear Engineering Headquarters Architecture South Office Section

Westinghouse Nuclear Engineering Headquarters Architecture North Office Redesign

Westinghouse Nuclear Engineering Headquarters Architecture North Conference Redesign

Westinghouse Nuclear Engineering Headquarters Architecture North Façade Redesign

Westinghouse Nuclear Engineering Headquarters Architecture Buffer Zone Redesign

Westinghouse Nuclear Engineering Headquarters Architecture Plant Impact

Westinghouse Nuclear Engineering Headquarters Conclusions

Westinghouse Nuclear Engineering Headquarters Conclusions Conclusions: Air Systems

Westinghouse Nuclear Engineering Headquarters Conclusions Conclusions: Mechanical Plant

Westinghouse Nuclear Engineering Headquarters Conclusions The best alternate Air System for the Westinghouse Headquarters is a Dedicated Outdoor Air System coupled with an all DOAS Fan Powered Terminal configuration to condition the office space. The best alternate Plant for the Westinghouse Headquarters is a Hybrid Ground Source Heat Pump Plant.

Westinghouse Nuclear Engineering Headquarters Conclusions Thank You... Professor Bahnfleth Professor Freihaut Professor Holland Bob Hennessey, Turner Construction Ernie Tillman, LLI Engineering Joel R. Bernard, IKM Inc. Special Thanks to all my friends and family for their support!

Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh Mechanical Option Questions ?